Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (102).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 064 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 064 Date Created: 11/19/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ David Hale 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category Request for DirectionStructuralAnchor Bolt Spacing Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ Sam Meeks 1 Question Date Required: 11/26/2018 Please refer to attached. After the installation of the anchor bolts for the columns at the type D1 footings along grid line 4 it was discovered that the dimensions for the base plates will differ from those that were designed. The slight shift in the anchor bolt placement in the field will cause one of the anchor bolts to not have enough clearance and the nut will not fit on the bolt. The situation is the same at both of the footings per the attached details. The anchor bolts at this location have a 1'-9" embedment into the footing. Please confirm it is acceptable to plug weld the anchor bolt that will not have the clearance required for the nut. Suggestion Answer Date Answered: 11/26/2018 It is acceptable to weld the anchor bolt to the base plate. Prolog Manager Printed on: 11/26/2018 FCI_Integration Page 1 not enough clearance not enough clearance CA.1 4 5.9 60' - 5 5/810' - 9 1/4"15' - 9" 5' - 0 3/8" 15' - 6" SLOPESLOPE(TYP.)3' - 9 1/8"(TYP.)6' - 8 7/8"4' - 10 3/4" B.1A.9 6"8"1' - 0"TOP STEP T.O. WALL EL. 115'-6" 1' - 0" 8" 6" TOP STEP HSS6X6X3/8(C)TOP STEP T.O. WALL EL. 109'-8" T.O. WALL EL. 115'-8 1/2" T.O. FOOTING EL. 99'-2" D HSS6X6X3/8 (D) HSS6X6X1/2 (C) T.O. RETAINING WALL EL. 114'-0" 1' - 0"6"8"1' - 0"T.O. WALL EL. 109'-6" C D 20' - 8" 3 5/8" 9 S300 15' - 0" 18' - 0" 20 D 4' - 4 3/8" 10' - 7 5/8"6"6"CONCRETE TIE BEAM 1'-0" WIDE x 1'-0" DEEP (T.O. TIE BEAM = 99'-4") S100 ATYP. A 6 7 1' - 0"1. TOP OF S FOUN FOOTING "A"FOOTING "B" N FOOTING "A" N FOOTING "A" N FOOTING "A" N FOOTING "A" N FOOTING "B" N FOOTING "B" N FOOTING "B"