Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (104).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 066 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 066 Date Created: 12/4/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationCivilSouth Site Railing Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 FCI Constructors, Inc. - GJ Nick Stokes 1 Question Date Required: 12/11/2018 Please refer to attached. Per the attached L3.00 drawing, there is a handrail that is to be installed on the south side of the building along the sidewalk ramp. The handrail is to be anchored to the wall all the way until it reaches the planter bed at the southwest corner of the building. When the handrail reaches the planter bed, it is anchored to the sidewalk and turns into a steel guardrail. When the handrail/guardrail is anchored to the sidewalk, it must maintain a minimum of 3" from the wedge anchor to the edge of the sidewalk. As currently drawn, the handrail would have to have any offset from the building so the minimum distance to the edge of concrete can be met. FCI is proposing to extend the concrete sidewalk a total of 6" into the planter bed towards the building so the handrail/guardrail can continue on a straight path. Please confirm the concrete sidewalk can be extended into the planter bed. Suggestion Answer Date Answered: 12/12/2018 CONCRETE SIDEWALK CAN BE EXTENDED 6-INCHES INTO THE PLANTER BED AS PROPOSED. 2018.12.12 - JONATHAN WEST Prolog Manager Printed on: 12/12/2018 FCI_Integration Page 1 If the concrete sidewalk can be extended into the planter bed thehandrail would flow in a straight line. If the sidewalk cannot extentinto the planter bes it would have to "jog" as shown above. RAMPGENERATORCONC CURB; RE CIVILARCH (UPPER DECK LIMITS)06L6.01HANDRAIL ANCHOREDTO WALKWAY05L6.01HANDRAIL ANCHOREDTO FACE OF WALL05L6.01HANDRAIL ANCHOREDTO FACE OF WALL06L6.01HANDRAIL ANCHOREDTO WALKWAY07,05L6.01HANDRAIL ANCHORED TO LOWWALL TRANSITIONING TOHANDRAIL ANCHORED TO FACEOF WALL06L6.01HANDRAIL ANCHOREDTO WALKWAY07L6.01HANDRAIL AND GUARDRAILANCHORED TO LOW WALLACACACLANDINGLANDINGLANDINGRAMPRAMPRAMPDETECTABLE WARNINGPLATE; RE CIVILLANDINGRAMP; RE CIVILWALL AS GUARD; SLOPE TOW @ 42"ABOVE RAMP GRADE; RE CIVILPLANTING BEDPLANTING BEDPLANTING BEDExtend the sidewalk 6" into theplanter bed. Allowing the handrail toextend in a straight line from the wall. L 6.01DETAILSSHEET NO:PROJECT NO:DATE:CHAMBERLIN ARCHITECTS437 Main St.Grand Junction, Colorado 81501T 970.242.6804725 Saint Joseph St., Suite B1Rapid City, South Dakota 57701T 605.355.6804www.chamberlinarchitects.comC 2016 CHAMBERLIN ARCHITECTS 1/16/2018 11:31:59 AM 05/09/20181740CASTLE CREEK ROADASPEN, COLORADOPROJECT STATUS: 100% CDASPENAMBULANCEDISTRICT FACILITYNO:ISSUED FOR:DATE: