Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (105).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 067 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 067 Date Created: 1/2/2019 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationArchitecturalSectional & Overhead Coiling Door Clarifications Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 FCI Constructors, Inc. - GJ Nick Stokes 1 Question Date Required: 12/14/2018 Please refer to attached. FCI has reviewed the sectional and overhead coiling door submittals and has the following questions that require responses for clarification: Overhead Coiling Door Review Comments/Questions 1.) It appears that there is not enough strength in the assembly of the jamb and header at walls at coiling door 115B to support this coiling door. The wall type is 2C which consists of a 6” metal stud wall, ½” plywood, air gap, and 4” CMU veneer framing. Drawings show the guides for this coiling door to mount on the inside of room 115. It does not appear that this wall assembly has the strength to support this door. Further, jamb/header details for this door, as called out on A701 and shown on A702, details 11 and 12/A702 have a note stating “metal stud header – ref. structural”, but there is no header detail for this opening in the structural drawings. Please advise. Sectional Door Review Comments/Questions 1.) It does not appear that there is enough room between the 12’ tall opening and the bottom of beam at interior side of these sectional door rough openings for the door drum and the added height needed for trolley operator type. The total height needed for these doors is 13’-5” (12’-0” + 17”) per attached shop drawings. The bottom of the beams at these openings is at 113’-9 ½” (at W18x35 beam) and 113’-11 ½” (at W16x26 beam). Please advise if there is enough room for the door components above the opening at these locations. Suggestion Answer Date Answered: 1/8/2019 1. PROVIDE 'W3' HEADER ASSEMBLY AT THIS OPENING. REFER TO SHEET S205. 2. PER OUR MEASUREMENTS THERE IS 22 INCHES OF CLEARANCE BETWEEN SECTIONAL DOOR HEAD AND Prolog Manager Printed on: 1/8/2019 FCI_Integration Page 1 Request for Information 067 Detailed, RFIs Grouped by RFI Number BOTTOM OF STEEL BEAM ON GRID 1. SEE RESPONSES ABOVE. 2019.01.08 - JONATHAN WEST Prolog Manager Printed on: 1/8/2019 FCI_Integration Page 2 %t� _ HOLE: 0.Y a aulB I BY GG Z8'%IA-%w MO SM PADS REWIRED (PADS MUST BE TwsS MTI SURFACE) sTFA a1MB5 Sr on1ER$ oPExlxc PUNK EMT {F f d1 MDTx L H. SCE1. R. H. scwntw 00.W.W. ILSAW -------------------- 0 F g-- --�Evm gD 3 E IFG CABLE}wULP 6 S' C C p pi j TR ATT Q9ME DR 1RApf ATIACXYEXT N¢ ME�PI�24 s R P 0 O 6 E WAFT n G e 3 ICILYIOLW- ° o ^ c m m 3 G p ex Ey 1RRDI a m .6 IffR$2'?/' N F d ° 91 AA El cQ 3 m AOJUpCC. Bpc,T I . NOTFcIF fi 0 91AR 5' Q P I -MA LL 7C�1-116 ATE 14 & SUPPLIER OER i�N,$ OYEIE� CORPORATION. BO,y� HOIWG WT @ 3 R� a 2. MINIM I®I ®MCj.'SION$.S.EI j fELD VERILY PRIOR T(i>J' I�ffi k VG).LL 1 A .1Q0/� _� £ R c m m 3 �. n E E :E IaF'm 5 � v DARC UPEr ANDAR'LIIFT ACN SIDE VIEW OF MOUNTED TRACK g e m m _ 00.W.W. ILSAW --------------------