Request for Information 067
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 067 Date Created: 1/2/2019
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ClarificationArchitecturalSectional & Overhead Coiling Door Clarifications
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
FCI Constructors, Inc. - GJ Nick Stokes 1
Question Date Required: 12/14/2018
Please refer to attached.
FCI has reviewed the sectional and overhead coiling door submittals and has the following questions that require
responses for clarification:
Overhead Coiling Door Review Comments/Questions
1.) It appears that there is not enough strength in the assembly of the jamb and header at walls at coiling door 115B to
support this coiling door. The wall type is 2C which consists of a 6” metal stud wall, ½” plywood, air gap, and 4” CMU
veneer framing. Drawings show the guides for this coiling door to mount on the inside of room 115. It does not appear that
this wall assembly has the strength to support this door. Further, jamb/header details for this door, as called out on A701
and shown on A702, details 11 and 12/A702 have a note stating “metal stud header – ref. structural”, but there is no
header detail for this opening in the structural drawings. Please advise.
Sectional Door Review Comments/Questions
1.) It does not appear that there is enough room between the 12’ tall opening and the bottom of beam at interior side of
these sectional door rough openings for the door drum and the added height needed for trolley operator type. The total
height needed for these doors is 13’-5” (12’-0” + 17”) per attached shop drawings. The bottom of the beams at these
openings is at 113’-9 ½” (at W18x35 beam) and 113’-11 ½” (at W16x26 beam). Please advise if there is enough room for
the door components above the opening at these locations.
Suggestion
Answer Date Answered: 1/8/2019
1. PROVIDE 'W3' HEADER ASSEMBLY AT THIS OPENING. REFER TO SHEET S205.
2. PER OUR MEASUREMENTS THERE IS 22 INCHES OF CLEARANCE BETWEEN SECTIONAL DOOR HEAD AND
Prolog Manager Printed on: 1/8/2019 FCI_Integration Page 1
Request for Information 067
Detailed, RFIs Grouped by RFI Number
BOTTOM OF STEEL BEAM ON GRID 1.
SEE RESPONSES ABOVE.
2019.01.08 - JONATHAN WEST
Prolog Manager Printed on: 1/8/2019 FCI_Integration Page 2
%t�
_
HOLE: 0.Y
a aulB I
BY GG
Z8'%IA-%w
MO SM PADS
REWIRED
(PADS MUST BE TwsS
MTI SURFACE)
sTFA a1MB5 Sr on1ER$
oPExlxc
PUNK
EMT
{F
f d1
MDTx
L H. SCE1. R. H. scwntw
00.W.W.
ILSAW
--------------------
0
F
g-- --�Evm
gD
3
E IFG
CABLE}wULP 6
S'
C C p pi j
TR ATT Q9ME
DR 1RApf ATIACXYEXT
N¢
ME�PI�24
s
R
P 0 O 6
E WAFT
n G
e
3
ICILYIOLW-
°
o
^
c m m 3
G
p
ex Ey
1RRDI a m
.6
IffR$2'?/' N F d
°
91
AA
El cQ
3 m
AOJUpCC. Bpc,T
I
.
NOTFcIF
fi 0 91AR
5' Q
P
I -MA LL 7C�1-116 ATE 14 & SUPPLIER
OER i�N,$ OYEIE� CORPORATION.
BO,y�
HOIWG
WT
@ 3 R�
a
2. MINIM I®I ®MCj.'SION$.S.EI j fELD VERILY
PRIOR T(i>J' I�ffi
k
VG).LL
1 A .1Q0/�
_�
£
R
c m m 3
�. n
E E
:E
IaF'm
5
� v
DARC UPEr
ANDAR'LIIFT ACN
SIDE VIEW OF MOUNTED
TRACK
g
e
m m
_
00.W.W.
ILSAW
--------------------