HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (109).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 071 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 071 Date Created: 12/17/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationArchitecturalNorth Upper Floor Framing Details Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 FCI Constructors, Inc. - GJ Nick Stokes 1 Question Date Required: 12/24/2018 Please refer to attached. Per the drawings, storefront elevation B04 is to be installed along gridline 0 at grid D. The structural drawings do not provide a cut for the head or the sill of this window. Please provide structural details for the head and the sill of the storefront windows along gridline 0. Suggestion Answer Date Answered: 12/21/2018 The head detail should be covered in Section 3/S302. See the attached drawing for the sill condition. 12/20/18 Per Jonathan West, the window along grid 6 between grid E & F south wall of the Library/Reports room will have the W3 opening system shown on sheet S205 of the structural drawings. Prolog Manager Printed on: 1/3/2019 FCI_Integration Page 1 A2011CDEOFFICE205FLEX206MECH/E 209UNIFORMLOCKERS221SHOWER227206205219TOILET208IT211DINING217DAYROOM216KITCHEN218209208A3013A3014A3021FPANTRY2192611B06B0760' - 3 1/4"1' - 0"7' - 4"1' - 0"2' - 2"4' - 5 1/2"2' - 2"1' - 0"ALIGN8' - 1 3/4"9' - 9 1/2"1CTR WALL ON GRID LINECTR WALL ON GRID LINECTR WALL ON GRID LINE18' - 0"18' - 0"18' - 0"14' - 0"128' - 0"A7331B07TYPWindow Elevation B04 11 E E D D C C 18' - 0" 18' - 0" 6' - 1 5/8" BEAM SPLICE 3 S302 00 22 HSS6x6x5/16 (119'-2 1/2") HSS6x6x5/16 (119'-2 1/2") 5 S303 TYP.EACH ENDSIM.5 S303 TYP.EACH ENDSIM.9"9"11 11 DESCRIPTION: SCALE:DATE: PREPARED BY:PROJECT NO:PROJECT:ISSUED WITH:LOCATION: A.A.D.F.AS NOTED GRAND JUNCTION, COLORADO 970.242.6804 RAPID CITY, SOUTH DAKOTA 605.355.6804 RFI #7117.085 12/20/18 JDG Roof Framing Plan Revision S104 SSK-27 3/16" = 1'-0"ROOF FRAMING PLAN 1 Sam Meeks From:Jonathan West <jwest@chamberlinarchitects.com> Sent:Friday, December 21, 2018 12:01 PM To:Sam Meeks Cc:Brady Blackmer; Brian Young Subject:RE: Aspen Ambulance - RFI-071 North Upper Floor Framing Details.pdf Sam… Frank just confirmed that it is acceptable to use the “W3” opening system at the Library/Reports window. Thanks, Jonathan Jonathan West, AIA, LEED GA C H A M B E R L I N A R C H I T E C T S G R A N D J U N C T I O N, C O • R A P I D C I T Y, S D 437 Main Street Grand Junction, CO 81501 Office (970) 242-6804 Fax (970) 422-7422 www.chamberlinarchitects.com From: Sam Meeks [mailto:smeeks@fciol.com] Sent: Friday, December 21, 2018 10:07 AM To: Jonathan West Cc: Brady Blackmer; Brian Young Subject: RE: Aspen Ambulance - RFI-071 North Upper Floor Framing Details.pdf Jonathan, Thanks for getting this one back over. I was looking it over and I noticed the window on the south wall of the Library/Reports room (Grid 6 between E & F). It also doesn’t seem like this window has a detail for the head and the sill. Sam Meeks Engineer FCI Constructors, Inc. P.O. Box 1767 (81502) 3070 I-70 B, Bldg. A Grand Junction, CO 81504 P. (970) 434-9093 F. (970) 434-7583 C. (970) 618-8817 www.fciol.com Focused On Your Vision