Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (114).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 076 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 076 Date Created: 1/21/2019 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationArchitectural/StructuralGrid G & 3.2 Column Anchor Bolts Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 FCI Constructors, Inc. - GJ Javier Garcia 1 Question Date Required: 1/28/2019 Please refer to attached picture. The northeast & northwest anchor bolts on the footing at grid G / 3.2 were cast low enough that the ironworkers were not able to get a full nut on the bolt. During a site walk with Frank Rinaldi of Lindauer Dunn on 1/17/19 it was confirmed that it is acceptable to weld the top of the anchor bolt to the nut in these locations. Suggestion Answer Date Answered: 1/21/2019 This RFI is for confirmation only. No response is required. Prolog Manager Printed on: 1/21/2019 FCI_Integration Page 1 NE & NW bolts were low. Acceptable to weld bolt to nut per Frank Rinaldi on field walk 1/17/19 N Column @ G/3.2