HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (117).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 079 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 079 Date Created: 1/30/2019 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ David Hale 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationPlumbing/ArchitecturalLaundry Wall Location Change Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ Sam Meeks 1 Question Date Required: 2/6/2019 Please refer to the attached. Per drawing P102, the plumbing lines on the east wall of Laundry 222 are shown to penetrate through the floor along grid line C to the lower level. A steel beam is running along grid C against the underside of the steel decking. The steel beam will not allow the plumbing piping to penetrate the floor in the location shown on the plumbing drawings. Per discussion between Jonathan West and Brian Young during a 1/29/2019 site walk, the east wall of Laundry will shift to the west just enough to allow the plumbing to penetrate through the floor. Suggestion Answer Date Answered: This is a confirming RFI no response needed. Prolog Manager Printed on: 1/30/2019 FCI_Integration Page 1 A B C D E H I J 1 2 4 5 6 7 WAITING 201 OFFICE 203 OFFICE 204 OFFICE 205 FLEX 206 MECH/ELEC 209 CORRIDOR 210 STOR. 213 OFFICE 212 CONFERENCE 214 LIBRARY / REPORTS 215 CORRIDOR 220 UNIFORM LOCKERS 221 LAUNDRY 222 CORRIDOR 224 SHOWER 225 SHOWER 226 SHOWER 227 BUNK RM 229 BUNK RM 230 BUNK RM 231 BUNK RM 232 STORAGE 228 3 TOILET 208 IT 211 DINING 217 DAYROOM 216 KITCHEN 218 MECH 223 F PANTRY 219 STAIR 303 STAIR 302 ELEVATOR 301 0 G DECK 233 UPPER LEVEL PLUMBING PLAN FR-1FR-2FR-3 WC-2 SH-1 LV-2 WC-2 SH-1 LV-2 WC-2 SH-2 LV-2 WB-1 32" AFF SK-3 WC-3 LV-3 4" W MAIN DOWN TO GROUND LEVEL FS-1 2" FD-2 2" HB-1 18" AFF RANGE FD-1 2" 2-1/2" CV 1-1/2" V CONNECT HW AND W FOR DISHWASHER 2" COMBINATION DRAIN AND VENT 2" V AND 3" WCO3" 1/2" GAS FROM BELOW CW TO HB-1 WITH BALL VALVE BELOW SINK 1/2" GAS FROM BELOW WB-3 32" AFF DRYER WASHER 1/2" HW AND CW FROM BELOW 1/4" HW FROM BELOW 1-1/4" CW AND 1" HW FROM BELOW WB-2 WB-2 WB-3 AT 8" AFF 2" CV, 2" WCO 1-1/2" V 0'8' 4' SK-4 3/4" GAS FROM BELOW BL-2 1-1/4"1" 3/4" MS-1 1" 1" 3" 3" 3" W DOWN 3" VTR 2-1/2" V FROM BELOW UP TO 3" VTR 1/4" CW 1-1/4" CW FROM BELOW 3" 2-1/2" FROM CV FD-1 2" WH-1 WH-2 G BL-1 G 3/4" HWC FROM BELOW CP-1 GAS FROM BELOW 1-1/4" 3/4" DD-1 3" DD-1 3" DD-1 3" DD-1 3" DD-1 3" DD-1 3" WATER HEATER CONCENTRIC VENT FITTING AT 14'-0" AFF (TYP OF 2). INSULATE INDOOR COMBUSTION AIR PIPING. 2-1/2" 2-1/2" 2" V FROM BELOW 2" 3" WCO CO UNDER SINK 2" CV, 3" WCO GAS GRILLE BALL VALVE AND QUICK CONNECT AT 18" AFF 3/4"1/2" G G 3/4" GAS FROM BELOW 3/4" 1/2" GAS AND PRV FOR BL-2 SK-5 PIPE CONDENSATE DRAINS FROM FURNACES AND DX COILS TO FLOOR SINK GLASS FILLER WB-2 ℄ 41" AFF ℄ 41" AFF ℄ 41" AFF 1/2" FILTERED CW FROM BELOW 1/2" FILTERED CW FROM BELOW 1/4" 1-1/2" 2" 1/2"1/2" P102 UPPER LEVEL PLUMBING PLAN DRAWN BY:CHECKED BY: SHEET NO: PROJECT NO: DATE: CHAMBERLIN ARCHITECTS 437 Main St. Grand Junction, Colorado 81501 T 970.242.6804 725 Saint Joseph St., Suite B1 Rapid City, South Dakota 57701 T 605.355.6804 www.chamberlinarchitects.com E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N C 2016 CHAMBERLIN ARCHITECTS05/09/2018 1740 CASTLE CREEK ROAD ASPEN, COLORADO PROJECT STATUS: 100% CD DCR DCR ASPEN AMBULANCE DISTRICT FACILITY NO:ISSUED FOR:DATE: 356 ECHO CANYON COURT, GRAND JUNCTION, CO 81507-9584 PHONE 970-434-9819 / CELL 970-260-1781 / clintral@bresnan.net RALSTON MECHANICAL CONSULTING, LLC Engineering for HVAC, Refrigeration, and Plumbing CONDENSATE PIPING