HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (117).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 079
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 079 Date Created: 1/30/2019
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ David Hale
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ConfirmationPlumbing/ArchitecturalLaundry Wall Location Change
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ Sam Meeks 1
Question Date Required: 2/6/2019
Please refer to the attached.
Per drawing P102, the plumbing lines on the east wall of Laundry 222 are shown to penetrate through the floor along grid
line C to the lower level. A steel beam is running along grid C against the underside of the steel decking. The steel beam
will not allow the plumbing piping to penetrate the floor in the location shown on the plumbing drawings. Per discussion
between Jonathan West and Brian Young during a 1/29/2019 site walk, the east wall of Laundry will shift to the west just
enough to allow the plumbing to penetrate through the floor.
Suggestion
Answer Date Answered:
This is a confirming RFI no response needed.
Prolog Manager Printed on: 1/30/2019 FCI_Integration Page 1
A B C D E H I J
1
2
4
5
6
7
WAITING
201
OFFICE
203
OFFICE
204
OFFICE
205
FLEX
206
MECH/ELEC
209
CORRIDOR
210
STOR.
213
OFFICE
212
CONFERENCE
214
LIBRARY /
REPORTS
215
CORRIDOR
220
UNIFORM
LOCKERS
221
LAUNDRY
222
CORRIDOR
224
SHOWER
225
SHOWER
226
SHOWER
227
BUNK RM
229
BUNK RM
230
BUNK RM
231
BUNK RM
232
STORAGE
228
3
TOILET
208
IT
211
DINING
217
DAYROOM
216
KITCHEN
218
MECH
223
F
PANTRY
219
STAIR
303
STAIR
302
ELEVATOR
301
0
G
DECK
233
UPPER LEVEL PLUMBING PLAN
FR-1FR-2FR-3
WC-2
SH-1
LV-2
WC-2
SH-1
LV-2
WC-2
SH-2
LV-2
WB-1
32" AFF
SK-3
WC-3
LV-3
4" W MAIN DOWN
TO GROUND LEVEL
FS-1
2"
FD-2
2"
HB-1
18" AFF
RANGE
FD-1
2"
2-1/2" CV
1-1/2" V
CONNECT HW AND W
FOR DISHWASHER
2" COMBINATION
DRAIN AND VENT
2" V AND 3" WCO3"
1/2" GAS
FROM BELOW
CW TO HB-1 WITH BALL
VALVE BELOW SINK
1/2" GAS
FROM BELOW
WB-3
32" AFF
DRYER
WASHER
1/2" HW AND CW
FROM BELOW
1/4" HW FROM
BELOW
1-1/4" CW AND 1"
HW FROM BELOW
WB-2
WB-2
WB-3
AT 8" AFF
2" CV, 2" WCO
1-1/2" V
0'8'
4'
SK-4
3/4" GAS
FROM BELOW
BL-2
1-1/4"1"
3/4"
MS-1
1"
1"
3"
3"
3" W DOWN
3" VTR
2-1/2" V FROM BELOW
UP TO 3" VTR
1/4" CW
1-1/4" CW
FROM BELOW
3"
2-1/2" FROM CV
FD-1
2"
WH-1 WH-2
G
BL-1
G
3/4" HWC
FROM BELOW
CP-1
GAS FROM BELOW
1-1/4"
3/4"
DD-1
3"
DD-1
3"
DD-1
3"
DD-1
3"
DD-1
3"
DD-1
3"
WATER HEATER CONCENTRIC
VENT FITTING AT 14'-0" AFF (TYP
OF 2). INSULATE INDOOR
COMBUSTION AIR PIPING.
2-1/2"
2-1/2"
2" V FROM
BELOW
2"
3" WCO
CO UNDER SINK
2" CV, 3" WCO
GAS GRILLE BALL
VALVE AND QUICK
CONNECT AT 18" AFF
3/4"1/2"
G G
3/4" GAS
FROM BELOW
3/4"
1/2" GAS AND
PRV FOR BL-2
SK-5
PIPE CONDENSATE DRAINS
FROM FURNACES AND DX
COILS TO FLOOR SINK
GLASS FILLER
WB-2
℄ 41" AFF
℄ 41" AFF
℄ 41" AFF
1/2" FILTERED CW
FROM BELOW
1/2" FILTERED CW
FROM BELOW
1/4"
1-1/2"
2"
1/2"1/2"
P102
UPPER LEVEL
PLUMBING PLAN
DRAWN BY:CHECKED BY:
SHEET NO:
PROJECT NO:
DATE:
CHAMBERLIN ARCHITECTS
437 Main St.
Grand Junction, Colorado 81501
T 970.242.6804
725 Saint Joseph St., Suite B1
Rapid City, South Dakota 57701
T 605.355.6804
www.chamberlinarchitects.com
E N H A N C I N G E V E R Y D A Y L I V I N G T H R O U G H D E S I G N
C 2016 CHAMBERLIN ARCHITECTS05/09/2018
1740
CASTLE CREEK ROAD
ASPEN, COLORADO
PROJECT STATUS: 100% CD
DCR DCR
ASPEN
AMBULANCE
DISTRICT FACILITY
NO:ISSUED FOR:DATE:
356 ECHO CANYON COURT, GRAND JUNCTION, CO 81507-9584
PHONE 970-434-9819 / CELL 970-260-1781 / clintral@bresnan.net
RALSTON MECHANICAL CONSULTING, LLC
Engineering for HVAC, Refrigeration, and Plumbing
CONDENSATE
PIPING