Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (118).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 080 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 080 Date Created: 1/30/2019 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ David Hale 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category DirectionStructuralCover for Mechanical Equipment Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ Sam Meeks 1 Question Date Required: 2/6/2019 Please refer to attached. During the 1/29/2019 OAC Meeting it was discussed that the mechanical condensing units that are to be installed on the southeast corner of the building will need something to protect them from snow falling off the roof. Rich with Pitkin County commented that the cover structure must be designed to withstand someone standing on the structure. Please provide details and a design for a structure that would protect the condensing units from falling snow. Suggestion Answer Date Answered: 3/13/2019 1. REFER TO PROPOSAL REQUEST #021 DATED 3/11/19 FOR DESIGN & DETAILS OF ROOF STRUCTURE. 2. RELOCATE GENERATOR AND CONDENSER UNITS 1-3 AS INDICATED IN PROPOSAL REQUEST #021. THE GENERATOR MANUFACTURER (CUMMINS) ADVISES AGAINST A ROOF ABOVE THIS PIECE OF EQUIPMENT. THEIR (CUMMINS) CONCERN IS WITH OVERHEATING AND RE-ASPIRATING PRODUCTS OF COMBUSTION - THE GENERATOR DISCHARGES UP. 2019.03.11 - JONATHAN WEST Prolog Manager Printed on: 3/13/2019 FCI_Integration Page 1 ALIGN RE; MECH