Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (119).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 081 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 081 Date Created: 2/5/2019 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationArchitectural/StructuralTrash Enclosure Pilaster Elevations Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 FCI Constructors, Inc. - GJ Javier Garcia 1 Question Date Required: 2/12/2019 Please refer to attached. The two P10 pilasters on the trash enclosure (grids 21/AA.4 & 21/AA.1) were inadvertently poured 8" too low. Per conversation between Brian Young and Frank Rinaldi it is acceptable to drill & epoxy the four #5 bars (8" minimum depth) required in the P10 and pour the additional 8". It is also acceptable to extend the anchor bolts with couplers & all thread to get to the proper height. Suggestion Answer Date Answered: This RFI has been created for confirmation. No response is required. Prolog Manager Printed on: 2/5/2019 FCI_Integration Page 1 5" CONCRETE SLAB OVER 4" GRAVEL ON 2'-0" COMPACTED STRUCTURAL FILL T.O. SLAB EL. 100'-0" T.O. PILASTER EL. 99'-4" AA 22 AA.1AA.4 21 35' - 4" 3/8" 13' - 10" 1' - 1 5/8" 3' - 4" 4' - 4 3/8" - 4"T.O. PILASTER EL. 99'-4"HSS8X8X1/4(C1)HSS8X8X1/4(C1)A A P-10 T.O. WALL EL. 99'-4"EDGE8"THICKENEDP-10 9' - 4"4"1' - 4" 6 2 S106 3 S106