HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (119).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 081
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 081 Date Created: 2/5/2019
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ConfirmationArchitectural/StructuralTrash Enclosure Pilaster Elevations
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
FCI Constructors, Inc. - GJ Javier Garcia 1
Question Date Required: 2/12/2019
Please refer to attached.
The two P10 pilasters on the trash enclosure (grids 21/AA.4 & 21/AA.1) were inadvertently poured 8" too low. Per
conversation between Brian Young and Frank Rinaldi it is acceptable to drill & epoxy the four #5 bars (8" minimum depth)
required in the P10 and pour the additional 8". It is also acceptable to extend the anchor bolts with couplers & all thread to
get to the proper height.
Suggestion
Answer Date Answered:
This RFI has been created for confirmation. No response is required.
Prolog Manager Printed on: 2/5/2019 FCI_Integration Page 1
5" CONCRETE SLAB
OVER 4" GRAVEL ON
2'-0" COMPACTED
STRUCTURAL FILL
T.O. SLAB
EL. 100'-0"
T.O. PILASTER
EL. 99'-4"
AA
22
AA.1AA.4
21
35' - 4"
3/8" 13' - 10" 1' - 1 5/8"
3' - 4" 4' - 4 3/8"
- 4"T.O. PILASTER
EL. 99'-4"HSS8X8X1/4(C1)HSS8X8X1/4(C1)A A
P-10
T.O. WALL
EL. 99'-4"EDGE8"THICKENEDP-10
9' - 4"4"1' - 4"
6
2
S106
3
S106