Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (123).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 085 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 085 Date Created: 2/14/2019 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ConfirmationArchitecturalFront Entry Canopy Soffit Company Name Contact Name Copies NotesCc: FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 FCI Constructors, Inc. - GJ Javier Garcia 1 Question Date Required: 2/21/2019 Please refer to the attached. Per detail 1 on architectural sheet A642, there is a 1"x6" tongue and groove soffit made from select white birch that is to be installed at the underside of the front entry canopy. Per the detail, the tongue and groove material is to be fastened to the metal Z-girts. To fasten the tongue and groove material to the z-girts the fasteners would be exposed to view. Per phone conversation between Jonathan West with Chamberlin and Sam Meeks with FCI, it was confirmed that the rigid insulation would be reduced to 2" and a 1/2" layer of fire treated plywood would be added between the insulation and the soffit material. The plywood will allow the soffit material to be installed and the fasteners to be almost completely hidden from view. Suggestion Answer Date Answered: This RFI is for confirmation only. No response is required. Prolog Manager Printed on: 2/14/2019 FCI_Integration Page 1 ROOF MEMBRANE FLASHING W/ CONT EDGE SEALANT PRE FINISHED MTL ROOD EDGE FLASHING W/ CONT GALV CLEAT LAP ROOF MEMBRANE OVER WEATHER BARRIER FLASHING & DOWN FASCIA 4"2 2 2 6 6 10 WEATHER BARRIER FLASHING, LAP OVER TOP OF PARAPET MTL 'C' GIRT @ TOP & BOTTOM OF FRM'G FOR INSULATION ATTACHMENT PRE FINISHED MTL FASCIA W/ FLAT LOCK SEAM @ VERTICAL JOINTS 113' - 4 1/2" T.O. CANOPY 26 111' - 7 1/4" B.O. CANOPY 2.5" RIGID INSULATION @ FASCIA & SOFFIT PT WD 2x BLK'G (TYP) CONT PT WD 2x @ CANOPY SOFFIT PERIMETER WRAP PRE FINISHED MTL FASCIA FLASHING OVER BLK'G & ATTACH BELOW SOFFIT FINISH CONT BACKER ROD & SEALANT (TYP) 1x6 WD PLANK SOFFIT FINISH ON 3" MTL 'Z' GIRTS W/ RIGID INSULATION WEATHER BARRIER ON 1/2" EXT SHEATHING ON 7/8" MTL FURRING ATTACHED TO STL BEAMS, RE: STR FILL CANOPY CAVITY W/ BATT INSULATION SINGLE PLY ROOF MEMBRANE ON 1/2" COVER BOARD ON TAPERED RIGID INSULATION ON MTL ROOF DECK, RE: STR 4' - 3" 6 Reduce rigid insulation from 2 1/2" to 2" Install one layer of 1/2" fire treated plywood Fasten tongue and groove soffit to the layer of plywood Detail 1/A642