HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (40).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 006
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 006 Date Created: 8/1/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
ConfirmationCivilSanitary Sewer Manhole #3 Clarification
Company Name Contact Name Copies NotesCc:
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Chamberlin Architects, Inc. Daniel Gartner 1
Question Date Required: 8/8/2018
Please refer to attached email correspondence.
Per the original utilities submittal for the Aspen Ambulance project, Roaring Form Engineering stated that MH#3 for the
sanitary sewer line was required to be a "doghouse" style manhole in lieu of the precast manhole that was submitted on.
Aspen Digger, FCI's civil contractor contacted the Aspen Sanitation District to discuss the use of a "doghouse" style
manhole. Hamilton Tharp with the Aspen Sanitation district has stated that a pre-cast manhole will be required for the
sanitary sewer tie-in manhole.
Please confirm that it is acceptable for FCI to proceed with installing a pre-cast manhole at MH#3.
Please confirm the pre-cast manhole #3 that was submitted to Roaring Fork Engineering on 7/27/2018 is approved as
shown.
Suggestion
Answer Date Answered: 8/2/2018
RFE has revised sheet C-120 incorporating recently received field shots from potholing. The existing sewer line was
further to west than shown on the survey ( about 5') . This impacted the length of sewer manhole 3 and RFE has also
reviewed and commented on the submittal to reflect this. Both the submittal and new design are attached.
Please confirm that it is acceptable for FCI to proceed with installing a pre-cast manhole at MH#3. This is acceptable
RBG - Aug 2
Prolog Manager Printed on: 8/2/2018 FCI_Integration Page 1
1
Sam Meeks
From:Chuck Leavitt <chuck@aspendigger.com>
Sent:Tuesday, July 31, 2018 1:50 PM
To:Brady Blackmer; Brian Young; Sam Meeks
Subject:Fwd: Ambulance District Line Extension
Brady,
Please see email from Hamilton Tharp Aspen Sanitation district regarding the sewer manhole Number three for Tie in to
the sewer main at Castle Creek. Hamilton wants a precast manhole at that tie in location and not poured in place. Please
review the sewer manhole number three submittal for approval so we can get that into production. Call with any
questions
Chuck
Leavitt / Estimatorchuck@aspendigger.com / 970-
379-8500
Aspen DiggerOffice: 970-963-2157 / Fax: 970-
704-96330075 Sopris AveCarbondale, CO
81623aspendigger.com
Begin forwarded message:
From: Franz Stone <franz@aspendigger.com>
Date: July 31, 2018 at 1:26:23 PM MDT
To: Chuck Leavitt <chuck@aspendigger.com>
Subject: Fwd: Ambulance District Line Extension
2
---------- Forwarded message ---------
From: <htharp@aspensan.com>
Date: Tue, Jul 31, 2018, 10:03 AM
Subject: Ambulance District Line Extension
To: Franz Stone <franz@aspendigger.com>
Cc: Richard Goulding <richardg@rfeng.biz>, Josh Shackelford <jws@reitechengineering.com>
Franz,
Thanks for your inquiry regarding the tie-in manhole (SMH-3) for the Ambulance line extension. Roaring
Fork Engineering had a poured-in-place manhole specified in the original plans, however, the ACSD is
requiring a pre-cast manhole for the tie-in manhole.
Hamilton Tharp
Aspen Consolidated Sanitation District
Collection System Superintendent
970-925-3601 Office
970-618-0146 Cell
“If indoor plumbing doesn’t make you happy, what can?”
THIS MANHOLE MUST BE A
DOGHOUSE MANHOLE.
Pending RFI. SAMH-3 to be a doghouse manhole.
2'1/2"
98
41"
88
37"
87
36"87
36"
44"
44"
44"
50"
91.09
91.19
91.23
0'
0.1'
0.14'
2.04
4.00
10.13
100.7
91.09
0.00
9.61
8.53
0"16"8"
13.2"1.2"7.2"
1.7"9.7"17.7"
2.04'
DRAWN BY:CHECKED BY:SHEET NO:PROJECT NO:DATE:592 HIGHWAY 133Carbondale, Colorado 81623PH 970.340.4130C 2016 CHAMBERLIN ARCHITECTSNO:ISSUED FOR:DATE:F 866.876.5873P:\2017\44 - Pitkin Ambulance Facility\04-DWG\04-Sheetset\SS-AADF Utilities.dwg9/6/2018 6:29 PMCHAMBERLIN ARCHITECTS437 Main St.Grand Junction, Colorado 81501T 970.242.6804725 Saint Joseph St., Suite B1Rapid City, South Dakota 57701T 605.355.6804www.chamberlinarchitects.comASPENAMBULANCEDISTRICT FACILITYCASTLE CREEK RDASPEN, COLORADOSANITARYSEWER PLAN &PROFILEPROJECT STATUS: 100% CDSWWRBGC-1202017-449/6/20181PR#1 7/18/18PR1PR1PR1PR1PR1