Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (42).ACBKDetailed, RFIs Grouped by RFI Number Request for Information 008 Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033 Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583 RFI #: 008 Date Created: 8/2/2018 Author Company Authored ByAnswer Company Answered By Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks 437 Main Street Grand Junction, CO 81501 P. O. Box 1767 Grand Junction, CO 81502 Co-Respondent Author RFI Number DisciplineSubject Category ClarificationCivilNyloplast In-Line Drain Inlets Company Name Contact Name Copies NotesCc: Chamberlin Architects, Inc. Daniel Gartner 1 FCI Constructors, Inc. - GJ Brady Blackmer 1 FCI Constructors, Inc. - GJ Brian Young 1 FCI Constructors, Inc. - GJ David Hale 1 Question Date Required: 8/9/2018 Please see attached email. Per the Nyloplast submittal, all inlets are being shown as drain basins. Aspen Digger, FCI's civil contractor would like to use the Nyloplast in-line drain inlets for Inlet-1, Inlet-2, Inlet-3 and Inlet-4. The In-Line drain inlets look the same as the basins except they do not have a 6" sump. Not having the sump would mean they will not have any standing water in them. Please confirm if Inlet-1, Inlet-2, Inlet-3 and Inlet-4 can be installed as In-Line drain basins in lieu of the basins as shown on the submittal. Suggestion Answer Date Answered: 8/7/2018 Using In-Line Drains for Inlet-1, Inlet-2, Inlet-3, and Inlet-4 is an acceptable substitution. All pipe inverts will need to remain the same. 8-7-2018 Prolog Manager Printed on: 8/7/2018 FCI_Integration Page 1 1 Sam Meeks From:Chuck Leavitt <chuck@aspendigger.com> Sent:Thursday, August 2, 2018 10:14 AM To:Sam Meeks Cc:franz (franz@aspendigger.com); Brady Blackmer; Brian Young; David Hale Subject:Re: Aspen Ambulance - 330000.02 -- 0 Utilities - Nyloplast Resubmittal.pdf SAm, In my July 9th email for the original Nyloplast submittals I asked ...... if the end inlets can be in-line drain inlets and not drain basins for inlet 1, inlet 2, inlet 3, and inlet 4? They are showing basins on the submittal. Can these be in-line drain inlets instead of basins? The only difference is the 6" sump so there would be no standing water in those end inlets. Wondering if those inlet 1, inlet 2, inlet 3, and inlet 4 can be typical Nyloplast inline drain inlets instead of full basins? Sincerely, Chuck Right-click or tap and hold here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.Aspen Digger Right-click or tap and hold here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet. Right-click or tap and hold here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet. Chuck Leavitt / Estimatorchuck@aspendigger.com / 970- 379-8500 Right-click or tap and hold here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet. Aspen DiggerOffice: 970-963-2157 / Fax: 970-704- 96330075 Sopris AveCarbondale, CO 81623aspendigger.com On Thu, Aug 2, 2018 at 9:38 AM, Sam Meeks <smeeks@fciol.com> wrote: Chuck,