HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (63).ACBKDetailed, RFIs Grouped by RFI Number
Request for Information 028
Aspen Ambulance District Facility FCI Constructors, Inc. - GJProject # 10-17-033
Aspen, CO 81611 Tel: 970-434-9093 Fax: 970-434-7583
RFI #: 028 Date Created: 9/17/2018
Author Company Authored ByAnswer Company Answered By
Chamberlin Architects, Inc. Jonathan West FCI Constructors, Inc. - GJ Sam Meeks
437 Main Street
Grand Junction, CO 81501
P. O. Box 1767
Grand Junction, CO 81502
Co-Respondent Author RFI Number
DisciplineSubject Category
DirectionCivilTrash Enclosure Sidewalk Ramp
Company Name Contact Name Copies NotesCc:
Chamberlin Architects, Inc. Daniel Gartner 1
FCI Constructors, Inc. - GJ Brady Blackmer 1
FCI Constructors, Inc. - GJ Brian Young 1
FCI Constructors, Inc. - GJ David Hale 1
Question Date Required: 9/24/2018
Please refer to the attached
Per the civil drawings for the trash enclosure, a 5' concrete sidewalk will be installed on the north side of the enclosure
and it will extend to the east and ramp down to where the existing sidewalk is. Per the attached pictures of existing
conditions, the existing retaining wall will have to be demolished and the steel fence will have to be removed.
Please provide clarification and a detail for the install of the fence after the sidewalk has been poured. Please also confirm
it is acceptable to remove some of the existing retaining wall to make room for the new sidewalk.
Suggestion
Answer Date Answered: 9/19/2018
Richard Goulding met with Brian Young on 9/18/2018 to discuss this issue and arrived on the below solution.
The existing retaining wall will be demolished approximately 4" to the north of the edge of the proposed sidewalk to allow
for the new curb wall to be installed. The existing fence will be removed in this area up to the next 4" steel post. This
section of fence will be replaced at a later date once the parts can be ordered. The attached detail, which was used for the
original installation of this fence, should be followed. Instead of embedding the post into the retaining wall, the post should
be welded to the steel plat and four epoxy anchor bolts should be used to anchor this plate to the existing wall.
Prolog Manager Printed on: 9/19/2018 FCI_Integration Page 1
PR011
Scanned by CamScanner