HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019.ACBKDate IssuedChange Approved By Owner?Comments7/19/2018 YESPR-01 was issued in response to plan review comments, but it does not appear that PR-01 is currently incorporated into the stamped permit set of plans. 7/19/2018YESChanged wall layouts only to provide more room for storage at this small building. 8/17/2018YES8/10/2018YES8/10/2018YES8/20/2019YES8/20/2018YES8/20/2018YES8/27/2018YES9/25/2018 YESMisc. revisions to documents to incorporate cost savings items discussed early on in design. The most pertinent change that we think Building Department will want to review is the change of ridig insulation at building exterior envelope - change from 4" thich Roxul mineral wool insulation with fluid applied vapor barrier to 2.5" polyiso rigid insulation with foil-facing to serve as weather barrier (delete the fluid-applied weather barrier).9/13/2018YES9/21/2018YES10/22/2018YES10/30/2018YESFCI is getting proposal on this work for County to review prior to moving forward with any PV system11/20/2018YES11/20/2018YES1/11/2019YES1/16/2019YES2/8/2019YES3/5/2019YES3/13/2019YES3/18/2019YES3/23/2019YES4/2/2019YES4/18/2019YES6/4/2019YES6/4/2019NO7/2/2019YES7/31/2019FCI PRICING26252423Lower Level Paint & Sign TypeUpdated Landscape PlansHHS Parking Lot Delivery Pull-OutApparatus Bay Floor StripingDuctwork Changes Per ASI-007Added SoffitsAV & IT Rough-In Changes2 Dumpster Enclosure Layout RevisionsProposal RequestsAspen Ambulance District FacilityPR # Description1 Civil Design Changes3 Exterior Building Lighting Change 4 Water Service Piping Detail Revision5 Added Snowmlet Systems (Additional Area)6 Electrical Panelboard Revision #17 Elevator Electrical Modifications8 Site Lighting Revisisons (Parking Lot)9 Electrical Panelboard Revision #210 Post Bid Addendum - Misc. Revisions11 Trash Enclosure Grading& Sanitary Sewer Line Revisisons12 Structural Drawing Clarifications13 Added Parking Lot Signage14 Added Photovoltaic Systems15 CMU Support Clarification16 Stair 302 Tread Detail Changes17 WC-2 Change18 Locker Signage & Office Doors19 Corner Guards31Building Address SignageMechanical Unit CoversIR-2 & IR-3 Air and Combustion Vents2221203029282708/13/2019
Date IssuedChange Approved By Owner?Comments7/19/2018 YESPR-01 was issued in response to plan review comments, but it does not appear that PR-01 is currently incorporated into the stamped permit set of plans. 7/19/2018YESChanged wall layouts only to provide more room for storage at this small building. 8/17/2018YES8/10/2018FCI Pricing8/10/2018YES8/20/2019YES8/20/2018YES8/20/2018YES8/27/2018YES9/25/2018 YESMisc. revisions to documents to incorporate cost savings items discussed early on in design. The most pertinent change that we think Building Department will want to review is the change of ridig insulation at building exterior envelope - change from 4" thich Roxul mineral wool insulation with fluid applied vapor barrier to 2.5" polyiso rigid insulation with foil-facing to serve as weather barrier (delete the fluid-applied weather barrier).9/13/2018YES9/21/2018YES10/22/2018YES10/30/2018YESFCI is getting proposal on this work for County to review prior to moving forward with any PV system11/20/2018YES11/20/2018YES1/11/2019YES1/16/2019FCI Pricing2/8/2019YES3/5/2019FCI Pricing3/13/2019FCI Pricing3/18/2019FCI Pricing18 Locker Signage & Office Doors19 Corner Guards23Building Address SignageMechanical Unit CoversIR-2 & IR-3 Air and Combustion Vents22212015 CMU Support Clarification16 Stair 302 Tread Detail Changes17 WC-2 Change12 Structural Drawing Clarifications13 Added Parking Lot Signage14 Added Photovoltaic Systems9 Electrical Panelboard Revision #210 Post Bid Addendum - Misc. Revisions11 Trash Enclosure Grading& Sanitary Sewer Line Revisisons6 Electrical Panelboard Revision #17 Elevator Electrical Modifications8 Site Lighting Revisisons (Parking Lot)3 Exterior Building Lighting Change 4 Water Service Piping Detail Revision5 Added Snowmlet Systems (Additional Area)2 Dumpster Enclosure Layout RevisionsProposal RequestsAspen Ambulance District FacilityPR # Description1 Civil Design Changes08/13/2019