Loading...
HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0024.2019 (4).ACBKComments Aspen Ambulance District Facility Northeast Retaining Wall Snow fence Gusset Plate Dimensions Overhead Door Structural Detail PR-10 Exterior Wall Rigid Insulation Z-Girt Type & Spacing Elevator Pit & Hoistway Dimensions 053 054 055 056 057 Elevator Call-Out Phone Line Access Control & Security Clarifications West Parking Lot Island Electrical & Landscape050 051 052 Acoustical Ceiling Grid Seismic Clarification 049 043 044 045 046 Roof Walkway Pads 058 D1 Tie-Beam Reinforcement F-6 Pilaster Rebar Placement Doolittle Sidewalk Ramp Elevations Vertical Brace Questions Vertical Brace Clarifications #2 Wood Retaining Wall Structural Steel Clarifications #2 CMU Block Clarification Retaining Wall Joints & Dimension Changes 041 042 035 036 037 038 039 040 CMU Masonry at OH Doors Stair 302 Structural Steel Encasement Window Sizes Steel Material Clarification Added Parking Lot Signage047 048 Structural Beam Reactions Raised Crosswalk Tack Coat Trash Enclosure Gate Diagonal Tube Foundation Structural Fill Deletion Structural Steel Clarifications #1 034 Metal Stair Dimensions Northeast Retaining Wall Elevation REVISED Elevator Warranty Elevator Electrical Clarification Site Bollard Detail Trash Enclosure Sidewalk Ramp 030 031 032 033 024 025 026 027 028 029 Beam Designation Clarification Masonry Metal Flashings Trash Enclosure Anchor Bolt Clarification Parking Lot Signage Post Clarification Northeast Retaining Wall Elevation023 Parking Lot Signage Clarifications Elevator Clarifications HHS & AADF Electrical Service Tackboard Specifications New Fiber/Low-Volt Pathway Clarifications Heat Trace Clarification 019 020 021 022 016 017 018 Asphalt Herbicide Deletion 013 014 015 007 008 009 010 011 012 Requests for Information 023R1 Foundation Dampproofing vs. Waterproofing 032R1 Foundation Structural Fill Deletion 001 002 003 004 005 006 RFI #Description SOG Vapor Retarder Location & Under Slab Insulation Water Line & Sanitary Sewer Pot-Holing Overhead Door Wiring Diagram Asphalt Paving & Patch Detail Clarification Exterior Storefront Warranty Sanitary Sewer Manhole #3 Clarification Doolittle Inlet-2 Clarification Nyloplast In-Line Drain Inlets Gridline Dimension Clarification Required Gas Line Size HHS Sewer Line Clarification Channel Frame Mirror Building Structural Steel Additiona Structural Steel Finish Clarifications Fire Sprinkler Head Type 062 061 060 059 08/13/2019 Stair 302 Tread Finsih South Site Rail Installation Grid G & 3.2 Column Anchor Bolts Anchor Bolt Spacing Upper Level Flooring Clarifications Asphaltic Paint Clarifications South Site Railing Sectional & Overhead Coiling Door Clarifications Front Door Emergency Phone Exterior Framing Clip Detail Gridline 4 Deck Edge Dimension 072 071 070 069 068 067 Added Hose Bib Roof Deck Fireproofing Using UL Assembly Laundry Wall Location Change Cover for Mechanical Equipment Trash Enclosure Pilaster Elevations HHS Upper Sidewalk & Retaining Wall B23 & B22 Window Dimensions B23 Window Roller Shades Front Entry Canopy Soffit Exterior Wall Vapor Barrier Deletion South Balcony Railing Clarifications Stair 302 Rail Clarification North Upper Floor Framing Details Soap Dispensers 10K1-J12 Joist Clarifications 066 065 064 063 081 080 079 078 077 076 075 074 073 Weather Barrier at False Louvers Door 303C Fire Rating Alerting System Doorbell Deletion Site Concrete Sealer Video Messenger Relocation Electrical Receptacle Relocation Access Control & Security Camera Submittal Clarification South Patio Soffit 106 105 104 103 102 101 100 099 098 097 096 095 094 093 092 091 090 089 088 087 086 085 084 083 082 106A HM Frame Deletion Gutter Downspouts Northwest Retaining wall Termination South Apparatus Bay Wall Sag Rods Roller Shade Clarifications WB-1 Clarification Flex Room Alerting System Configuration Dryfall & Paint Termination Point Metal Panel to Split Face Transition Medical Storage & Kitchen Casework Clarifications Exterior Wall Closed Cell Spray Foam Insulation Northwest Sign Light Owner Box Walk Changes Kitchen Casewok at Door 220 Alerting System Pre-Install Walk Clarifications Drywall Details & Soffit Clarifications WAP Rough-In Locations Range Hood & & EF-3 Speed Control Fire Alarm & Mechanical System Sequence of Operation Training Room Ceiling Height Stair 303 Joist Top Chord Apparatus Bay Electricla @ IR Heaters Compressor Location & Piping Window Flashing Color Corridor 220 Light Switch Wood Site Bench Installation HB-2 Hose Bib Location Lobby Destratification Fan Rough-In Kitchen Island Sink & Cabinet Measurements Uniform Locker Shoe Cubby IT Wall Sheathing Trash Enclosure Grade Changes Paint Color Clarifications 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 08/13/2019 145 144 143 154 153 152 151 150 149 148 147 146 163 162 161 160 159 158 157 156 155 172 171 170 169 168 167 166 165 164 OH Door 107 & 106 Lintel Detail Corridor 220 Soffit Addition IT Rack Dedicated Circuits Added Wood Sill to Foundation Wall Kichen Range Hood Ducting Concrete Floor Sealer Added Camera at Mechanical Canopy Northwest Site Stair Foundation Flagpole Foundation Detail North Apparatus Bay Entrance Curbs Exterior Handrail Paint Color Kitchen Dishwasher Replacement Stair 302 Upper Landing Edge Detail Training Room Column Wrap North Wall Angle Installation East IR Heater Installation Water Heater Vent Location Overhead Door Control Stations Shower 225 Accessible Shower Trash Enclosure Ramp Railing Extensions Flag Pole Light Irrigation Water Meters Front Canopy Fascia Substitution 174 173 Upper Level Office Return Air Furnace Combustion Air & Exhaust Vents IT Room 211 Cable Tray Patio LAY3 Light Fixture Mechanical Unit Canopy Column Installation Finishes Clarification at Kitchen Gutter Downspout Detail Lobby Ceiling Height Typical Snowmelt Paving Section Concrete Retaining Wall Guard Rails Front Entry Canopy Roof Slope Upper Level FCU CA-CE Piping & Type F Light Conflict Existing AVH Soil Nail Wall Repairs 139 140 141 142 130 131 132 133 134 135 136 137 138 08/13/2019