HomeMy WebLinkAboutFile Documents.401 Castle Creek Rd.0071.2018 (31).ACBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
0071.2018.ACBK
Pitkin County
401 Castle Creek
2735 1230 7801
52,069 sf
06/08/2018
x
x
x
x
x
x
x
x
x
x
x
JB 6/8/18
435 BB
0071.2018.ACBK6/8/18
JF 7/2/18
PH 6/28/18
06/08/2018
PHASE ONE :
SOILS STABILIZATION, UTILITIES AND
CIVIL SITE WORK
City of Aspen - Tree Planting Specifications
Trunk caliper shall
meet ANSI Z60 current
edition for root ball size.
Modified soil. Depth
varies. (See soil preparation
plan).
Finished grade.
Bottom of root ball rests on
existing or recompacted
soil.
Central leader. (See crown
observations detail).
SECTION VIEW
Remove 1/3 of
burlap and basket wire.
Round-topped
soil berm 4" high x 8" wide
above root ball surface
shall be constructed around
the root ball. Berm shall
begin at root ball periphery.
Top of root ball shall be flush with
finished grade.
Prior to mulching, lightly tamp soil
around the root ball in 6" lifts to
brace tree. Do not over compact.
When the planting hole has been
backfilled, pour water around the
root ball to settle the soil.
4" layer of mulch.
No more than 1" of mulch on
top of root ball. (See
specifications for mulch).
Notes:
1- Trees shall be of quality
prescribed in crown
observations and root
observations details and
specifications.
2- See specifications for
further requirements related to
this detail.
Existing soil.
TP-1
s >5
1/ iT\ 1//0/1>/1'/1';;; /1'/1
\ */ ’ \ */ \ */ \ */ \ */ \
"-'i .-..t ■ 1 'i.i-i 1 i- -i-- V »
I.v '/ O'/' \ '/ ' '/ O'/' O/^ i'l —I r i'l [v-
I yqTTE3TTr=rrfSSvSOI ItFFt
Tr TT
ALJ
The City of Aspen
The following criteria must also be met with construction:
Ø A construction fence must be erected along the entire dripline of
all trees on site and any tree canopy from neighboring property.
This will serve as the tree protection zone (TPZ). This fence is to
be constructed in such a manner that the area inside the dripline is
protected. AN INSPECTION OF THIS FENCE MUST BE
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION
ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION
WITH BEN CARLSEN AT 429-2034.
Ø No materials may be stored in the TPZ, including but not limited
to, construction backfill, construction traffic, or any other
construction materials.
Ø No excavation, grading or trenching may occur within the TPZ
without the consent of the City of Aspen Forester or his designee.
Ø No parking of vehicles or equipment may occur in the TPZ.
Ø No dumping of any waste products may occur in the TPZ.
Ø Any roots cut during excavation shall be pruned with sharp
loppers/pruners back to the soil line. The roots will further be
protected by burlap draped over the side of the excavation
covering the exposed roots. This burlap shall be kept moist until
the excavation is backfilled.
Ø Pruning to provide clearance for construction activities shall only
be done under the direction of an arborist.
Ø Site inspections shall be performed on a weekly basis, to ensure
the above listed conditions are met.
Ø Any unapproved improvements or activities outside of those
approved within this permit will be subject to mitigation in the form
of restoration.
Ø This permit must be posted on site during the construction
process.
Tree protection fencing is required at the driplines of all trees shown.
There is NO activity allowed within this fenced area, including, but not limited to: digging,
storage of material, equipment, machinery, foot or vehicle traffic.
Please contact the City Forester or his designee at 920-5120 for an inspection of this fencing
Prior to any activity.
If the need arises to perform any activity in the tree protection area, please contact the City
Forester and you will be given specific instructions as to how to proceed to minimize impacts to
the tree root zone.
City of Aspen - Tree Protection Zone
Crown drip line or other limit of Tree Protection area. See
tree preservation plan for fence alignment.4'-0"Maintain existing
grade with the tree
protection fence
unless otherwise
indicated on the
plans.
2" x 6' steel posts
or approved equal.
Tree Protection
fence: High density
polyethylene fencing
with 3.5" x 1.5"
openings; Color-
orange. Steel posts
installed at 8' o.c.
5" thick
layer of mulch.
Notes:
1- See specifications for additional tree
protection requirements.
2- If there is no existing irrigation, see
specifications for watering requirements.
3- No pruning shall be performed except
by approved arborist.
4- No equipment shall operate inside the
protective fencing including during fence
installation and removal.
5- See site preparation plan for any
modifications with the Tree Protection
area.
SECTION VIEW
KEEP OUT
TREE
PROTECTION
AREA
8.5" x 11"
sign
laminated in
plastic spaced
every 50'
along the
fence.
URBAN TREE FOUNDATION
OPEN SOURCE FREE TO USETPZ-1
08/03/2018
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
COMcheck Software Version 4.0.8.0
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
401 and 405 Castle Creek Road
Aspen, CO 81611
Owner/Agent:
Rich Englehart
Pitkin County
123 Emma Road, #106
Basalt, CO 81621
970-618-7232
rich.englhart@pitkincounty.com
Designer/Contractor:
Daniel Gartner
Chamberlin Architects
437 Main Street
Grand Junction, CO 81501
970-242-6804
dgartner@chamberlinarchitects.co
m
Project Information
Energy Code:
Aspen Ambulance District Facility
Dedicated Outdoor Air System
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Central Furnace, Gas, Capacity = 100 kBtu/h
Proposed Efficiency = 96.00% Et, Required Efficiency = 80.00% Et
Cooling: 1 each - Split System, Capacity = 60 kBtu/h, Air-Cooled Condenser, Air Economizer
Proposed Efficiency = 16.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FR-1 & ERV-1 | ADMINISTRATION -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 2000 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade
FAN 2 Exhaust, Constant Volume, 270 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade
FAN 13 Supply, Constant Volume, 270 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade
1 HVAC FR-1, CU-1, ERV-1 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 100 kBtu/h
Proposed Efficiency = 96.00% Et, Required Efficiency = 80.00% Et
Cooling: 1 each - Split System, Capacity = 60 kBtu/h, Unknown Economizer
No minimum efficiency requirement applies
Fan System: Unspecified
SYSTEM COMPLIANCE FAILS: Economizer requirements have not been met.
1 HVAC FR-2, CU-2, ERV-2 (Single Zone):
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 10 kBtu/h
No minimum efficiency requirement applies
Fan System: CH-1 | STAIRS 303 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 10 Supply, Constant Volume, 300 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade
1 HVAC CH-1 (Single Zone):
Heating: 1 each - Radiant Heater, Gas, Capacity = 100 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 HVAC IR-1 (Single Zone):
Heating: 1 each - Radiant Heater, Gas, Capacity = 175 kBtu/h
1 HVAC IR-2 (Single Zone):
Project Title:
Data filename:
Aspen Ambulance District Facility
C:\RALSTON-MECHANICAL\JOB-FILES\17-011 Pitkin Ambulance Facility\17-011 COMcheck.cck
06/08/18Report date:
171 ofPage06/08/2018
Quantity System Type & Description
No minimum efficiency requirement applies
Fan System: None
Heating: 1 each - Radiant Heater, Gas, Capacity = 175 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 HVAC IR-3 (Single Zone):
Heating: Hot Water Boiler, Capacity 750 kBtu/h, Gas
Proposed Efficiency: 96.00 % Et, Required Efficiency: 80.00 % Et
1 Plant 1 BL-1 snow melt:
Heating: Hot Water Boiler, Capacity 110 kBtu/h, Gas
No minimum efficiency requirement applies
1 Plant BL-2 building heat:
Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 100 kBtu/h w/ Circulation Pump
Proposed Efficiency: 96.00 % Et, Required Efficiency: 80.00 % Et
2 Water Heater 1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Aspen Ambulance District Facility
C:\RALSTON-MECHANICAL\JOB-FILES\17-011 Pitkin Ambulance Facility\17-011 COMcheck.cck
06/08/18Report date:
172 ofPage06/08/2018
SEE FILE COPY FOR SIGNATURE
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
DAM 8/27/18
DAM 8/27/18
JPO 8/27/18
DAM 8/27/18
SW 7/25/18
AR 8/27/18
PM 6/27/18
LOC 8/13/18
DR 7/10/18
DAM 8/27/18
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
06/08/2018
06/08/2018
COMcheck Software Version 4.3.5.1
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Permit No.0071.2018.ACBK
Vertical Glazing / Wall Area:14%
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
405 Castle Creek rd.
Aspen, Colorado 81611
Owner/Agent:
Aspen Ambulance District Facility
Designer/Contractor:
Chamberlin Architects. Studio B
aspen, Colorado 81611
kevin@studiobarchitects.net
Project Information
Energy Code:
COMCHECK whole building
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Building Area Floor Area
1-Fire Station : Nonresidential 3729
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Fire Station]2761 ---57.0 0.017 0.028
Floor: Unheated Slab-On-Grade, Horizontal with vertical >= 4 ft., [Bldg.
Use 1 - Fire Station] (c)
452 ---10.0 0.360 0.520
roof: Insulation Entirely Above Deck, [Bldg. Use 1 - Fire Station]3232 ---57.0 0.017 0.028
NORTH
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]2953 19.0 15.0 0.041 0.064
Door: Insulated Metal, Non-Swinging, [Bldg. Use 1 - Fire Station]904 ------0.057 0.057
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID product label, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
447 ------0.290 0.290
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]1163 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
322 ------0.290 0.290
EAST
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]1643 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
306 ------0.290 0.290
SOUTH
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]2523 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
112 ------0.290 0.290
Door: Insulated Metal, Swinging, [Bldg. Use 1 - Fire Station]40 ------0.097 0.370
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]671 19.0 15.0 0.041 0.064
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
121 ofPage
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID n, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
249 ------0.290 0.290
WEST
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]803 19.0 15.0 0.041 0.064
Ext. Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Fire Station]657 19.0 15.0 0.041 0.064
Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product
ID f, SHGC 0.25, [Bldg. Use 1 - Fire Station] (b)
27 ------0.290 0.290
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 34% better than code
Project Title:
Data filename:
COMCHECK whole building 08/17/18Report date:
122 ofPage
401 CASTLE CREEK RD
07/24/2018
0071.2018.ACBK
07/24/2018
Chris HuttoGround Engineering 7/20/18
07/24/2018
0071.2018.ACBK
DAM DENIS MURRAY 8/17/18
SEE FILE COPY FOR SIGNATURE
08/21/2018