HomeMy WebLinkAboutFile Documents.100 E Cooper Ave.0042.2018 (4).ARBK100 E Cooper IFFR Narrative
• Throughout unit:
o Remove all interior doors
o Remove all baseboard/casing
o Remove all wood floors
o Remove small sections of drywall where necessary
o No removal of insulation/sound insulation
o Remove decorative lighting fixtures
• Kitchen:
o Remove cabinets
o Remove counter tops
o Remove backsplash
o Remove appliances
• Dining:
o Remove section of stone veneer
• Powder:
o Remove toilet
o Remove vanity/faucet
o Remove wall coverings
• Bathroom:
o Remove vanity/faucet
o Remove mirrors
o Remove wall coverings
o Remove shower tile/fixtures
o Remove shower glass
02/23/2018