Loading...
HomeMy WebLinkAboutFile Documents.100 E Cooper Ave.0042.2018 (4).ARBK100 E Cooper IFFR Narrative • Throughout unit: o Remove all interior doors o Remove all baseboard/casing o Remove all wood floors o Remove small sections of drywall where necessary o No removal of insulation/sound insulation o Remove decorative lighting fixtures • Kitchen: o Remove cabinets o Remove counter tops o Remove backsplash o Remove appliances • Dining: o Remove section of stone veneer • Powder: o Remove toilet o Remove vanity/faucet o Remove wall coverings • Bathroom: o Remove vanity/faucet o Remove mirrors o Remove wall coverings o Remove shower tile/fixtures o Remove shower glass 02/23/2018