HomeMy WebLinkAboutFile Documents.120 Red Mountain Rd.0194.2018 (2).ARBK2. Appro\al of fabricator.:\ppoo,al shall he hmsd upon re,ie„ of the lithricxmr's nrincn
procedural and qualm control manuals and periodic auditing of fabrication practices h,
an appo,cd spacial impaction again\.
J.
( bmpierimt or rahrication.IPon ;omplct ion ol'fi,Fri:ation. the apo., d fabricator
,hall oh,oa cerlifcat, ofnnnplimne to till haildinu oRiei.1 talon, that the a,,,k
performed in acmrdan:c ,sill life apPro,ed :oa, ru,00n docunwat, .
G. Building Depanmem ResDnnsibilirira
1.
Appro,e special -inspection program. I he building department shall apprise all
SNOW ia,pecmr, and special -inspection rnluiremans.
..
F.nfarre special inspection. Aork reyuaine,pee.1 in,pooion and the Inanition;
ol,peetor :hall monitor the performance of,N6.1 inspectors. Iiia Her feppro,al. in
addhoon it, that of the special Inspector. must be obtained prior to placement ofconcrete,
.o, Grin; of ,tmaural steel. or other similar m;neriak
J.
Re\ien inspection reports. rhe building o0 oal alma lJ fell, ,pcCml-in,pe;tion
progress and Boal ,pons.
4.
perform final lospeclwtr. the Funding otlicial ,hondd pedom, l,e fn,i wapetlon and
appros al for a proi c;t 1113( See 1023.11 atter The final ,pec al io,pcct inn rep,n has been
re, i,ned and appro, oda
Project Address:
permit \umber.
AC'ASOII' LFDGVF,\TS
I ha, c read and to comph nith the conditions of this agreement.
?Spec I Inapemion leen
SignaturePrinted \ane Date
U, ncr
Sia t - \ane
uveJ Dan,D
hngine r�J r homer
SI_•aa.ure: Printed\ me. Date
61AYN K]�f�-lYKe r
t�f- K/• j � 1'lIBY/Iii 6 • Z 2•.,
r/
�•1:' I �jl� S.
_
8.
( ., tr
do nal... grind \amu IJme:
HS Building Groups,
Thomas J. Sherlock 10.22.2018
„- ._.... ._.
Siena'urr pdmul\,no: Date:
M,namrc printed Name Doc:
ir;1c n t
Bien M, printed Nna, Date'
1111' Of A4'F♦
PI I KlA ('(ll'\ f 1 _