Loading...
HomeMy WebLinkAboutFile Documents.120 Red Mountain Rd.0194.2018.ARBK0194.2018 Page: 1.COVER GENERAL INFORMATION Checkmark: Unchecked Author: jimp File Name: ARCHITECTURALS.pdf Please provide a Zoning Compliance form signed by the contractor ARCHITECTURALS.pdf (4) Page: A 0.1 FAR EXISTING AND PROPOSED Checkmark: Unchecked Author: jimp File Name: ARCHITECTURALS.pdf We will require existing and proposed plans for any level that is changing. Page: A 1.1 SITE PLAN /FLOOD Checkmark: Unchecked Author: jimp File Name: ARCHITECTURALS.pdf If this new gas fire pit is a permanent feature with a gas line, it will require a new stream margin approval. Page: A 3.2 MAIN LEVEL PLAN Checkmark: Unchecked Author: jimp File Name: ARCHITECTURALS.pdf Is there new deck work going on in the rear? If so, please show existing and proposed drawings of all exterior work. OWNER: EEC EHC LLC13111 NW FWY # 125HOUSTON, TX 77040-6321 Please provide a Zoning Compliance form signed by the contractor 87 S.F. We will require existing and proposed plans for any level that is changing. D T D T P 100-YEAR FLOOD LINE OF SLOPE EXISTING STONE PATIO, NEW GAS FIRE PIT NEW PATIO AT GRADE If this new gas fire pit is a permanent feature with a gas line, it will require a new stream margin approval. W61W60 W66 W60BW56 D19D18 W57 D31D33 D36 W62 D33 W62B C D 1 1 2 3'-4"3 1/2"11'-10 3/8"4"3'-8"10'-8"1'-10"3'-9"14'-1"3 1/2"5'-3"1 1/2"4'-0" 7'-3 5/8"7'-6 1/2"8'-8 5/8"3 1/2"7'-0 5/8"3 1/2"3'-4 1/8" EXISTING PURLIN REMOVE STEEL B STRIP LIGHTING EXISTING STEEL REMAIN, REMOV EXISTING STEEL B REMOVE STRIP L WRAP RIDGE IN REPAIR FLOORING NEW FACING ON FIREPLACE, SEE A PENETRATION SECTION OF DECKPREVIOUSLY REMOVED CHANGE TILE CHANGE LIGHT WRAP STEEL CO APPROVED BUILDINGENVELOPE CHANGE SWING MASTER BEDROOM 1 MASTER BATH LIVING POWDER WALK-IN SHOWER TV / FP BENCH MAIN LEVELPLY 100'-0" MASTERSLAB 99'-1" EXISTING LIFT-AN DECK W66A W66B W LINEN W/C 25'-2"4'-5"3 1/2"19'-8 1/4"19'-9 7/8" Is there new deckwork going on in therear? If so, pleaseshow existing andproposed drawings ofall exterior work. FAR IS NOT CHANGING IN THIS PERMIT THE NEW FIREPIT IS FREESTANDING, PROPANE. SEE REVISED SHEET A 1.1 THIS PERMIT DOES NOT INCLUDE ANY CHANGES TO THE BACK DECK SEE ZONING COMPLIANCE FORM, ATTACHED CC RESPONSES TO COMMENTS, DATED 11.14.18 11/21/18