Loading...
HomeMy WebLinkAboutresolution.council.048-20 RESOLUTION 4048 (Series of 2020) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT BETWEEN THE CITY OF ASPEN AND MURRAYSMITH, INC AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a contract for Maroon Creek Pipeline Rehabilitation Plant Project, between the City of Aspen and, a true and accurate copy of which is attached hereto as Exhibit "A", NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that a contract for Maroon Creek Pipeline Rehabilitation Plant Project between the City of Aspen and Murraysmith, Inc., a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 23' day of June 2020. Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk, do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, June 23rd, 2020. l Nicole Henning, City Clerk ;�►o �RRI CITY OF ASPEN STANDARD FORM OF AGREEMENT v 2009 CITY OF ASPEN PROFESSIONAL SERVICES City of Aspen Contract No.: 51149-2020. AGREEMENT made as of 1 st day of July, in the year 2020. BETWEEN the City: Contract Amount: The City of Aspen c/o Ryan Loebach 130 South Galena Street Total: $196,990 Aspen, Colorado 81611 Phone: (970)920-5079 If this Agreement requires the City to pay And the Professional: an amount of money in excess of $50,000.00 it shall not be deemed valid Murraysmith, Inc until it has been approved by the City c/o Joel Price, PE Council of the City of Aspen. 850 W. South Boulder Road, Suite 200 City Council Approval: Louisville, CO 80027 Phone: (970) 567-8020 Date: ,lune 23, 2020 Joel.Price@murraysmith.us Resolution No.: 048 of 2020 For the Following Project: Maroon Creek Pipeline Rehabilitation—from Headgate to Penstock Exhibits appended and made a part of this Agreement: Exhibit A: Scope of Work. Exhibit B: Fee Schedule. The City and Professional agree as set forth below. Agreement Professional Services Page 0 1. Scope of Work. Professional shall perform in a competent and professional manner the Scope of Work as set forth at Exhibit A attached hereto and by this reference incorporated herein. 2. Completion. Professional shall commence Work immediately upon receipt of a written Notice to Proceed from the City and complete all phases of the Scope of Work as expeditiously as is consistent with professional skill and care and the orderly progress of the Work in a timely manner. The parties anticipate that all Work pursuant to this Agreement shall be completed no later than December 1", 2021. Upon request of the City, Professional shall submit, for the City's approval, a schedule for the performance of Professional's services which shall be adjusted as required as the project proceeds, and which shall include allowances for periods of time required by the City's project engineer for review and approval of submissions and for approvals of authorities having jurisdiction over the project. This schedule, when approved by the City, shall not, except for reasonable cause,be exceeded by the Professional. 3. Payment. In consideration of the work performed, City shall pay Professional on a time and expense basis for all work performed. The hourly rates for work performed by Professional shall not exceed those hourly rates set forth at Exhibit B appended hereto. Except as otherwise mutually agreed to by the parties the payments made to Professional shall not initially exceed the amount set forth above. Professional shall submit, in timely fashion, invoices for work performed. The City shall review such invoices and, if they are considered incorrect or untimely, the City shall review the matter with Professional within ten days from receipt of the Professional's bill. 4. Non-Assignability. Both parties recognize that this Agreement is one for personal services and cannot be transferred, assigned, or sublet by either party without prior written consent of the other. Sub-Contracting, if authorized, shall not relieve the Professional of any of the responsibilities or obligations under this Agreement. Professional shall be and remain solely responsible to the City for the acts, errors, omissions or neglect of any subcontractors' officers, agents and employees, each of whom shall, for this purpose be deemed to be an agent or employee of the Professional to the extent of the subcontract. The City shall not be obligated to pay or be liable for payment of any sums due which may be due to any sub-contractor. 5. Termination of Procurement. The sale contemplated by this Agreement may be canceled by the City prior to acceptance by the City whenever for any reason and in its sole discretion the City shall determine that such cancellation is in its best interests and convenience. 6. Termination of Professional Services. The Professional or the City may terminate the Professional Services component of this Agreement, without specifying the reason therefor, by giving notice, in writing, addressed to the other party, specifying the effective date of the termination. No fees shall be earned after the effective date of the termination. Upon any termination, all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, reports or other material prepared by the Professional pursuant to this Agreement shall become the property of the City. Notwithstanding the above, Professional shall not be relieved of any liability to the City for damages sustained by the City by virtue of any breach of this Agreement by the Professional, and the City may withhold any payments to the Professional for the purposes of set-off until such time as the exact amount of damages due the City from the Professional may be determined. Agreement Professional Services Page 1 7. Independent Contractor Status. It is expressly acknowledged and understood by the parties that nothing contained in this agreement shall result in, or be construed as establishing an employment relationship. Professional shall be, and shall perform as, an independent Contractor who agrees to use his or her best efforts to provide the said services on behalf of the City. No agent, employee, or servant of Professional shall be, or shall be deemed to be, the employee, agent or servant of the City. City is interested only in the results obtained under this contract. The manner and means of conducting the work are under the sole control of Professional. None of the benefits provided by City to its employees including, but not limited to, workers' compensation insurance and unemployment insurance, are available from City to the employees, agents or servants of Professional. Professional shall be solely and entirely responsible for its acts and for the acts of Professional's agents, employees, servants and subcontractors during the performance of this contract. Professional shall indemnify City against all liability and loss in connection with, and shall assume full responsibility for payment of all federal, state and local taxes or contributions imposed or required under unemployment insurance, social security and income tax law, with respect to Professional and/or Professional's employees engaged in the performance of the services agreed to herein. 8. Indemnification. Professional agrees to indemnify and hold harmless the City, its officers, employees, insurers, and self-insurance pool, from and against all liability, claims, and demands, on account of injury, loss, or damage, including without limitation claims arising from bodily injury, personal injury, sickness, disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out of or are in any manner connected with this contract, to the extent and for an amount represented by the degree or percentage such injury, loss, or damage is caused in whole or in part by, or is claimed to be caused in whole or in part by, the wrongful act, omission, error, professional error,mistake,negligence, or other fault of the Professional, any subcontractor of the Professional, or any officer, employee, representative, or agent of the Professional or of any subcontractor of the Professional, or which arises out of any workmen's compensation claim of any employee of the Professional or of any employee of any subcontractor of the Professional. The Professional agrees to investigate,handle,respond to, and to provide defense for and defend against, any such liability, claims or demands at the sole expense of the Professional, or at the option of the City, agrees to pay the City or reimburse the City for the defense costs incurred by the City in connection with, any such liability, claims, or demands. If it is determined by the final judgment of a court of competent jurisdiction that such injury, loss, or damage was caused in whole or in part by the act, omission, or other fault of the City, its officers, or its employees, the City shall reimburse the Professional for the portion of the judgment attributable to such act, omission, or other fault of the City, its officers, or employees. 9. Professional's Insurance. (a) Professional agrees to procure and maintain, at its own expense, a policy or policies of insurance sufficient to insure against all liability, claims, demands, and other obligations assumed by the Professional pursuant to Section 8 above. Such insurance shall be in addition to any other insurance requirements imposed by this contract or by law. The Professional shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to Section 8 above by reason of its failure to procure or maintain insurance, or by reason of its failure to procure or maintain insurance in sufficient amounts, duration,or types. Agreement Professional Services Page 2 (b) Professional shall procure and maintain, and shall cause any subcontractor of the Professional to procure and maintain, the minimum insurance coverages listed below. Such coverages shall be procured and maintained with forms and insurance acceptable to the City. All coverages shall be continuously maintained to cover all liability, claims, demands, and other obligations assumed by the Professional pursuant to Section 8 above. In the case of any claims-made policy,the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage. (i) Workers' Compensation insurance to cover obligations imposed by applicable laws for any employee engaged in the performance of work under this contract, and Employers' Liability insurance with minimum limits of ONE MILLION DOLLARS ($1,000,000.00) for each accident, ONE MILLION DOLLARS ($1,000,000.00) disease - policy limit, and ONE MILLION DOLLARS ($1,000,000.00) disease - each employee. Evidence of qualified self-insured status may be substituted for the Workers'Compensation requirements of this paragraph. (ii) Commercial General Liability insurance with minimum combined single limits of TWO MILLION DOLLARS ($2,000,000.00) each occurrence and TWO MILLION DOLLARS ($2,000,000.00) aggregate. The policy shall be applicable to all premises and operations. The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (including coverage for contractual and employee acts), blanket contractual, independent contractors, products, and completed operations. The policy shall contain a severability of interests provision. (iii) Comprehensive Automobile Liability insurance with minimum combined single limits for bodily injury and property damage of not less than ONE MILLION DOLLARS ($1,000,000.00) each occurrence and ONE MILLION DOLLARS ($1,000,000.00) aggregate with respect to each Professional's owned, hired and non- owned vehicles assigned to or used in performance of the Scope of Work. The policy shall contain a severability of interests provision. If the Professional has no owned automobiles, the requirements of this Section shall be met by each employee of the Professional providing services to the City under this contract. (iv) Professional Liability insurance with the minimum limits of ONE MILLION DOLLARS ($1,000,000) each claim and ONE MILLION DOLLARS ($1,000,000) aggregate. (c) The pohe ^r Commercial General Liability and Comprehensive Automobile Liability policies required above shall be endorsed to include the City and the City's officers and employees as additional insureds. Commercial General Liability and Comprehensive Automobile Liability shall be primary insurance, and any insurance carried by the City, its officers or employees, or carried by or provided through any insurance pool of the City, shall be excess and not contributory insurance to that provided by Professional. No additional insured endorsement to the policy required above shall contain any exclusion for bodily injury or property damage arising from completed operations. The Professional shall be solely responsible for any deductible losses under any policy required above. Agreement Professional Services Page 3 (d) The certificate of insurance provided to the City shall be completed by the Professional's insurance agent as evidence that policies providing the required coverages, conditions, and minimum limits are in full force and effect, and shall be reviewed and approved by the City prior to commencement of the contract. No other form of certificate shall be used. The certificate shall identify this contract and shall provide that the coverages afforded under the policies shall not be canceled, terminated or materially changed until at least thirty(30) days prior written notice has been given to the City. (e) Failure on the part of the Professional to procure or maintain policies providing the required coverages, conditions, and minimum limits shall constitute a material breach of contract upon which City may immediately terminate this contract, or at its discretion City may procure or renew any such policy or any extended reporting period thereto and may pay any and all premiums in connection therewith, and all monies so paid by City shall be repaid by Professional to City upon demand, or City may offset the cost of the premiums against monies due to Professional from City. (f) City reserves the right to request and receive a certified copy of any policy and any endorsement thereto. (g) The parties hereto understand and agree that City is relying on, and does not waive or intend to waive by any provision of this contract, the monetary limitations (presently $350,000.00 per person and $990,000 per occurrence) or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, Section 24-10-101 et seq., C.R.S., as from time to time amended, or otherwise available to City, its officers, or its employees. 10. City's Insurance. The parties hereto understand that the City is a member of the Colorado Intergovernmental Risk Sharing Agency (CIRSA) and as such participates in the CIRSA Proper- ty/Casualty Pool. Copies of the CIRSA policies and manual are kept at the City of Aspen Risk Management Department and are available to Professional for inspection during normal business hours. City makes no representations whatsoever with respect to specific coverages offered by CIRSA. City shall provide Professional reasonable notice of any changes in its membership or participation in CIRSA. 11. Completeness of Agreement. It is expressly agreed that this agreement contains the entire undertaking of the parties relevant to the subject matter thereof and there are no verbal or written representations, agreements, warranties or promises pertaining to the project matter thereof not expressly incorporated in this writing. 12. Notice. Any written notices as called for herein may be hand delivered or mailed by certified mail return receipt requested to the respective persons and/or addresses listed above. 13. Non-Discrimination. No discrimination because of race, color, creed, sex, marital status, affectional or sexual orientation, family responsibility, national origin, ancestry, handicap, or religion shall be made in the employment of persons to perform services under this contract. Professional agrees to meet all of the requirements of City's municipal code, Section 15.04.570, pertaining to non-discrimination in employment. Agreement Professional Services Page 4 14. Waiver. The waiver by the City of any term, covenant,or condition hereof shall not operate as a waiver of any subsequent breach of the same or any other term.No term,covenant, or condition of this Agreement can be waived except by the written consent of the City, and forbearance or indulgence by the City in any regard whatsoever shall not constitute a waiver of any term,covenant, or condition to be performed by Professional to which the same may apply and, until complete performance by Professional of said term, covenant or condition,the City shall be entitled to invoke any remedy available to it under this Agreement or by law despite any such forbearance or indulgence. 15. Execution of Agreement by City. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. Notwithstanding anything to the contrary contained herein, this Agreement shall not be binding upon the City unless duly executed by the Mayor of the City of Aspen (or a duly authorized official in his absence) following a Motion or Resolution of the Council of the City of Aspen authorizing the Mayor (or a duly authorized official in his absence)to execute the same. 16. Illegal Aliens—CRS 8-17.5-101 & 24-76.5-101_ (a) P=ose. During the 2006 Colorado legislative session, the Legislature passed House Bills 06-1343 (subsequently amended by HB 07-1073) and 06-1023 that added new statutes relating to the employment of and contracting with illegal aliens. These new laws prohibit all state agencies and political subdivisions, including the City of Aspen, from knowingly hiring an illegal alien to perform work under a contract, or to knowingly contract with a subcontractor who knowingly hires with an illegal alien to perform work under the contract. The new laws also require that all contracts for services include certain specific language as set forth in the statutes. The following terms and conditions have been designed to comply with the requirements of this new law. (b) Definitions. The following terms are defined in the new law and by this reference are incorporated herein and in any contract for services entered into with the City of Aspen. "Basic Pilot Program" means the basic pilot employment verification program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, that is administered by the United States Department of Homeland Security. "Public Contract for Services"means this Agreement. "Services" means the furnishing of labor, time, or effort by a Contractor or a subcontractor not involving the delivery of a specific end product other than reports that are merely incidental to the required performance. (c) By signing this document, Professional certifies and represents that at this time: (i) Professional shall confirm the employment eligibility of all employees who are newly hired for employment in the United States; and Agreement Professional Services Page 5 (ii) Professional has participated or attempted to participate in the Basic Pilot Program in order to verify that new employees are not illegal aliens. (d) Professional hereby confirms that: (i) Professional shall not knowingly employ or contract new employees .without confirming the employment eligibility of all such employees hired for employment in the United States under the Public Contract for Services. (ii) Professional shall not enter into a contract with a subcontractor that fails to confirm to the Professional that the subcontractor shall not knowingly hire new employees without confirming their employment eligibility for employment in the United States under the Public Contract for Services. (iii) Professional has verified or has attempted to verify through participation in the Federal Basic Pilot Program that Professional does not employ any new employees who are not eligible for employment in the United States; and if Professional has not been accepted into the Federal Basic Pilot Program prior to entering into the Public Contract for Services, Professional shall forthwith apply to participate in the Federal Basic Pilot Program and shall in writing verify such application within five (5) days of the date of the Public Contract. Professional shall continue to apply to participate in the Federal Basic Pilot Program and shall in writing verify same every three (3) calendar months thereafter, until Professional is accepted or the public contract for services has been completed, whichever is earlier. The requirements of this section shall not be required or effective if the Federal Basic Pilot Program is discontinued. (iv) Professional shall not use the Basic Pilot Program procedures to undertake pre-employment screening of job applicants while the Public Contract for Services is being performed. (v) If Professional obtains actual knowledge that a subcontractor performing work under the Public Contract for Services knowingly employs or contracts with a new employee who is an illegal alien, Professional shall: (1) Notify such subcontractor and the City of Aspen within three days that Professional has actual knowledge that the subcontractor has newly employed or contracted with an illegal alien; and (2) Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the new employee who is an illegal alien; except that Professional shall not terminate the Public Contract for Services with the subcontractor if during such three days the subcontractor provides.information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. Agreement Professional Services Page 6 (vi) Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment made in the course of an investigation that the Colorado Department of Labor and Employment undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. (vii) If Professional violates any provision of the Public Contract for Services pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City of Aspen may terminate the Public Contract for Services. If the Public Contract for Services is so terminated, Contractor shall be liable for actual and consequential damages to the City of Aspen arising out of Professional's violation of Subsection 8-17.5-102, C.R.S. (ix) If Professional operates as a sole proprietor, Professional hereby swears or affirms under penalty of perjury that the Professional (1) is a citizen of the United States or otherwise lawfully present in the United States pursuant to federal law, (2) shall comply with the provisions of CRS 24-76.5-101 et seq., and (3) shall produce one of the forms of identification required by CRS 24-76.5-103 prior to the effective date of this Agreement. 17. Warranties Against Contingent Fees, Gratuities, Kickbacks and Conflicts of Interest. (a) Professional warrants that no person or selling agency has been employed or retained to solicit or secure this Contract upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Professional for the purpose of securing business. (b) Professional agrees not to give any employee of the City a gratuity or any offer of employment in connection with any decision, approval, disapproval, recommendation, preparation of any part of a program requirement or a purchase request, influencing the content of any specification or procurement standard, rendering advice, investigation, auditing, or in any other advisory capacity in any proceeding or application, request for ruling, determination, claim or controversy, or other particular matter, pertaining to this Agreement, or to any solicitation or proposal therefore. (c) Professional represents that no official, officer, employee or representative of the City during the term of this Agreement has or one (1) year thereafter shall have any interest, direct or indirect, in this Agreement or the proceeds thereof, except those that may have been disclosed at the time City Council approved the execution of this Agreement. (d) In addition to other remedies it may have for breach of the prohibitions against contingent fees, gratuities, kickbacks and conflict of interest, the City shall have the right to: 1. Cancel this Purchase Agreement without any liability by the City; 2. Debar or suspend the offending parties from being a Professional, contractor or subcontractor under City contracts; Agreement Professional Services Page 7 3. Deduct from the contract price or consideration, or otherwise recover, the value of anything transferred or received by the Professional; and 4. Recover such value from the offending parties. 18. Fund Availability. Financial obligations of the City payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. .If this Agreement contemplates the City utilizing state or federal funds to meet its obligations herein, this Agreement shall be contingent upon the availability of those funds for payment pursuant to the terms of this Agreement. 19. General Terms. (a) It is agreed that neither this Agreement nor any of its terms, provisions, conditions, representations or covenants can be modified, changed, terminated or amended, waived, superseded or extended except by appropriate written instrument fully executed by the parties. (b) If any of the provisions of this Agreement shall be held invalid, illegal or unenforceable it shall not affect or impair the validity, legality or enforceability of any other provision. (c) The parties acknowledge and understand that there are no conditions or limitations to this understanding except those as contained herein at the time of the execution hereof and that after execution no alteration, change or modification shall be made except upon a writing signed by the parties. (d) This Agreement shall be governed by the laws of the State of Colorado as from time to time in effect. Venue is agreed to be exclusively in the courts of Pitkin County, Colorado. 20. Electronic Signatures and Electronic Records This Agreement and any amendments hereto may be executed in several counterparts, each of which shall be deemed an original, and all of which together shall constitute one agreement binding on the Parties, notwithstanding the possible event that all Parties may not have signed the same counterpart. Furthermore, each Party consents to the use of electronic signatures by either Party. The Scope of Work, and any other documents requiring a signature hereunder, may be signed electronically in the manner agreed to by the Parties. The Parties agree not to deny the legal effect or enforceability of the Agreement solely because it is in electronic form or because an electronic record was used in its formation. The Parties agree not to object to the admissibility of the Agreement in the form of an electronic record, or a paper copy of an electronic documents, or a paper copy of a document bearing an electronic signature, on the grounds that it is an electronic record or electronic signature or that it is not in its original form or is not an original. 20. Successors and Assigns. This Agreement and all of the covenants hereof shall inure to the benefit of and be binding upon the City and the Vendor respectively and their agents, representatives, employee, successors, assigns and legal representatives. Neither the City nor the Vendor shall have the right to assign, transfer or sublet its interest or obligations hereunder without the written consent of the other party. Agreement Professional Services Page 8 21. Third Parties. This Agreement does not and shall not be deemed or construed to confer upon or grant to any third party or parties, except to parties to whom Vendor or City may assign this Agreement in accordance with the specific written permission, any right to claim damages or to bring any suit, action or other proceeding against either the City or Vendor because of any breach hereof or because of any of the terms, covenants, agreements or conditions herein contained. 22. Attorney's Fees. In the event that legal action is necessary to enforce any of the provisions of this Agreement, the prevailing party shall be entitled to its costs and reasonable attorney's fees. 23. Waiver of Presumption. This Agreement was negotiated and reviewed through the mutual efforts of the parties hereto and the parties agree that no construction shall be made or presumption shall arise for or against either party based on any alleged unequal status of the parties in the negotiation, review or drafting of the Agreement. 24. Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion. Vendor certifies, by acceptance of this Agreement, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from participation in any transaction with a Federal or State department or agency. It further certifies that prior to submitting its Bid that it did include this clause without modification in all lower tier transactions, solicitations, proposals, contracts and subcontracts. In the event that Vendor or any lower tier participant was unable to certify to the statement, an explanation was attached to the Bid and was determined by the City to be satisfactory to the City. 25. Integration and Modification. This written Agreement along with all Contract Documents shall constitute the contract between the parties and supersedes or incorporates any prior written and oral agreements of the parties. In addition, vendor understands that no City official or employee, other than the Mayor and City Council acting as a body at a council meeting, has authority to enter into an Agreement or to modify the terms of the Agreement on behalf of the City. Any such Agreement or modification to this Agreement must be in writing and be executed by the parties hereto. 26. Authorized Representative. The undersigned representative of Vendor, as an inducement to the City to execute this Agreement, represents that he/she is an authorized representative of Vendor for the purposes of executing this Agreement and that he/she has full and complete authority to enter into this Agreement for the terms and conditions specified herein. Agreement Professional Services Page 9 IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized officials, this Agreement of which shall be deemed an original on the date fust written above. CITY OF ASPEN,COLORADO: PROFESSIONAL: *oaum[S ) --� ] By: <-)a(o— (--? I d By: V oEt.. La IN MMS IN—] Title: ►" IQ �_ Title: &Z12ALa,_ GIN��►L Date: 21328 Date: 6''�l'Zb20 Approved as to form: o , Ci Attorney's Office Agreement Professional Services Page 10 e EXHIBIT A PROFESSIONAL SERVICES AGREEMENT Agreement Professional Services Page 11 EXHIBIT A SCOPE OF WORK MAROON CREEK PIPELINE REHABILITATION FROM HEADGATE TO PENSTOCK CITY OF ASPEN, COLORADO General This Scope of Services has been separated into six different tasks for clarity and is described in detail below. Background The City of Aspen (City) owns and operates two raw water transmission pipelines that convey surface water from diversions at two creeks, Castle and Maroon Creek, to the City's Water Treatment Plant (WTP) and on Maroon Creek a diversion to the Hydroelectric Plant (HP) and the WTP. The Castle Creek and Maroon Creek pipelines were constructed in approximately 1964 and 1973, respectively. While both pipelines include a variety of pipe materials and diameters, a majority of the Castle Creek pipeline is 30-inch RCP and a majority of the Maroon Creek pipeline is 39-inch RCP, PCCP with shorter section of DIP. The City performed manned visual inspections on both pipelines in 2012 and in 2015. These inspections found that both pipelines were in fair condition, with most deficiencies being located at pipe joints. However, the inspections only included approximately 20% of the Maroon Creek pipeline total length and approximately 75% of the Castle Creek pipeline total length. These inspections were limited by a lack of access points and steep sections of pipe that were not accessible. Project Understanding and Assumptions For this scope of work, the City is interested in prioritizing the rehabilitation of an approximately 6,200-foot section of the Maroon Creek Pipeline (MCP) from the headgate to the tee and valve at the penstock to the HP. The penstock will need to be rehabilitated from MCP to 100-feet of the penstock downstream of the valve connection. The existing site features and access vaults/manholes will be surveyed to verify location in the field on a design survey. It is our understanding that the existing easement along the MCP is 40-feet wide based on conversations with the City. We will verify this easement width at the proposed access manhole City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8,2020 1 locations and recommend any additional temporary easements for construction. This will require title work and easement verification for each of the proposed manhole locations. Murraysmith and team of subconsultants will investigate this section of MCP to determine locations for proposed access manholes to be installed. These locations will be identified by deflections (horizontal and vertical) in the MCP and maximum spacing of 750-feet between access manhole. Based on the information we have to date and assuming the existing access points are sufficient for rehabilitation access, we have assumed a minimum of six (6) additional access manhole locations will be sufficient to rehabilitate the MCP via trenchless technologies. Portions of this section of MCP have been assessed in various years including 2012, 2015, 2017, and 2018. We understand that a small section of this line was repaired as late as February 2020. This section of line is being prioritized due to the recent repairs and the need to protect the influent source water for the HP. We will utilize the pipeline assessment along with the survey information to develop bid documents to include access manholes and rehabilitation. Due to the length and known existing access points, we will combine the access manhole and rehabilitation design into one task to expedite the design and construction process. We will review and map this section of line for locations of Weko-seals, horizontal and vertical bends, visual structural deficiencies, offsets, and grouting separation at joints. This comprehensive review will allow us to prioritize the critical sub- sections to be rehabilitated along the entire 6,200 linear feet of pipe. For the purpose of this contract we have split the contract up into two phases. Phase I will provide survey, assessment, design and bidding. Phase II will provide construction services and will be provided as a separate contract in 2021. Phase I will be contracted for 2020. All items addressed in this scope of work pertain to Phase I. Phase I Scope of Work This scope of work describes engineering services to be provided by the Consultant. Work will be performed by major work tasks, which are outlined as follows: ■ Baseline Design Task: o Task 1— Project Management and Coordination o Task 2— Mapping and Assessment o Task 3 —Design and Permitting ■ Additional Task: o Task 4—Bidding Support o Task 5—Construction Support, Record Drawings, and Closeout o Task 6—Contingency Design Task A more detailed discussion of proposed work tasks is provided below. City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8, 2020 2 G:\PDX_BD\Clients\Aspen,City of,CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docx _ Task 1 — Project Management and Coordination This task includes the administration and coordination of the Consultant's staff, subconsultants, and the interface with the City's project manager and other City staff. Consultant will actively manage all project work to meet the project budget and schedule. For the purposes of this scope and budget, an 8-month design and bidding schedule is anticipated. The following subtasks are included: Project Administration ■ Perform general administration and project management throughout Design and Bidding phases to ensure successful completion of all tasks and elements of the Project within the established scope, schedule and budget. ■ Process and submit monthly billings with a summary of project status by task and subtask, including a summary of invoicing from subconsultants retained for this project. ■ Provide progress reporting with monthly billings including review of work efforts completed, forecasted work for the next monthly period, percent completion, and any encountered or projected challenges or issues. ■ Maintain the overall project schedule including adding staff subconsultants and other resources as needed to meet scheduled milestones. ■ Perform in-house QA/QC reviews of all deliverables prior to submitting review packages to the City. Project Design Meetings Key Project Design Meetings under this subtask include coordinating schedules, developing agendas and preparing presentation materials for key project meetings during the design phase, and includes the following five (5) meetings: ■ Project Kick-off and Field Investigation —City Offices and Onsite ■ Pipeline Assessment Site Meeting -City Offices and Onsite ■ Pipeline Assessment Review Meeting—Web or Conference Call ■ 60% Design Completion —Web or Conference Call ■ 90% Design Completion - City Offices and Onsite to confirm final design Consultant may attend meetings via web or teleconference if agreed upon with City staff prior to the meeting. Meeting agendas and supporting information will be distributed through the City PM in advance of meeting. Meeting minutes will be distributed to meeting attendees and other interested parties within five business days of the subject meeting date. Task 2 — Mapping & Pipeline Assessment Preliminary engineering services will be completed under this task. Work will include data gathering, design survey in coordination with probe and assessment, and preparation of easement legal descriptions. Anticipated subtasks are outlined as follows: City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8, 2020 3 G:\PDX_BD\Clients\Aspen,City of,CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docz ■ Parcel Research and Base Drawing Setup to establish property lines, right-of-way lines, and existing easements based on existing site features ■ Locate existing Headgate, Manhole/Valves (4) based on the Figure 1 — Reference from 1973 Design Plans. Per Western Colorado RTVRN GPS Network (COA1) ■ Subterranean and Grade Survey as a combined effort between C&L and Peak Surveying ■ Titlework and Easements ■ Pipeline Assessment and Reporting It is assumed that the City will obtain the necessary right-of-entry from the landowners for the field work. Titlework and Access Verification. Prepare legal descriptions for permanent easements and temporary construction purposes for the proposed access locations, as detailed below. ■ Legal descriptions and exhibit maps will be prepared as necessary for anticipated temporary or permanent access to the project area. ■ Existing easement dimensions will be determined during design. ■ Title Commitment Preparation for six (6) proposed access manhole locations. Pipeline Inventory, Assessment, and Reporting In addition to the previous reports and assessment performed to date, we will produce a pipeline assessment report to compliment the work that has been performed to date by others. This supplemental pipeline assessment will be performed via manned entry and with a AMP probe assessment. Item includes manned entry inspection through entire proposed pipe length to acquire dimensional data, location and approximate degree of bends and any other pertinent data for future rehabilitation adequate/safe passage by the AMP probe. Manned entry needed for tether to be pulled through for Amp probe. Anticipated subtasks are outlined as follows: ■ Site visit and mobilization meeting ■ Pipeline Dewatering prior to manned entry ■ Pipeline Assessment Report submittal o Report will include pictures of documented locations of critical longitudinal cracking, sags, offsets, weko-seals, and bend locations o Pipeline Assessment Report will be used to compile with previous assessments in an effort to develop a comprehensive design alternative for rehabbing the entire 6,000 linear feet. ■ The probe will provide the subterranean Survey database to locate the alignment of the existing pipeline. This probe will identify sags and offsets which will be confirmed with a manned entry inspection. ■ A topographic survey will establish at grade points to be compiled in combination with the subterranean probe survey. An asbuilt map and plan of the 6,000 linear feet of pipeline will be developed as part of this survey effort to use for design and locate ideal access manhole installation points. City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8,2020 4 G:\PDX_BD\Clients\Aspen,City of,CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docx ■ Recommended method of rehabilitation and optimal proposed manhole location based on pipeline assessment report. ■ Traffic control or permitting not included for dewatering or assessment Task 3 — Design and Permitting Prepare final construction drawings, technical specifications, and contract documents for bidding and construction of proposed six (6) access manholes along the MCP and rehabilitation of the pipeline from headgate to the penstock. Murraysmith will produce plans and specifications for City review at the 60%and 90%completion levels, incorporating City review comments from each prior submittal. Plan and profile drawings will be provided at an appropriate scale. Construction drawings and special technical specifications will be in accordance with City standards, policies and procedures. Front end and Technical specifications will be based on City standard and Construction Standards Institute (CSI) formats. The engineer's estimate of probable construction costs will be updated at each design submittal stage. Subtasks include: Permitting City of Aspen and Pitkin County Provide assistance with City of Aspen and Pitkin County floodplain and grading permit requirements. Roaring Fork Engineering will support a majority of this effort. Environmental—Army Corps Permitting Preliminary assessment of proposed manhole locations and access routes to determine if the Project will include the discharge of fill material into potential Waters of the U.S. This work includes the work needed to submit an authorization request to the U.S. Army Corps of Engineers (USACE) Grand Junction Regulatory Office for Clean Water Act Section 404 (Section 404) authorization for the Project. SWCA's work would include: 1) Conducting a field delineation of wetland and non-wetland waters at up to five discrete work areas along the Maroon Creek Pipeline. This work will be done in accordance with the USACE Grand Junction Regulatory Office's requirements for this type of evaluation. 2) Developing a wetland delineation report which presents the results of the field delineation.The report would include a narrative description of the methods and results, detailed mapping, photographs, and wetland determination data forms. 3) Preparation of a preconstruction notification (PCN) for the Project. While the Project appears to qualify for Nationwide Permit 3: Maintenance (NWP 3), the fact that the pipeline is more than 50 years old triggers a need to submit PCN to the USACE under General Condition 20. Following submittal of the PCN to the USACE, SWCA expects that authorization would be received within 45 days, pending review and input by the State Historic Preservation Officer (SHPO). This task does not include mitigation design, onsite meetings with USACE, or other tasks that are not expected, but which may be required if the USACE determines that additional analysis or coordination is required. City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8,2020 5 G:\PDX_BD\Clients\Aspen,City of,CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docx 60% Design Submittal Provide 60% design submittal, including construction drawings, draft front end and technical specifications, contract documents and engineer's estimate of probable construction costs, including. ■ Electronic scalable set of plans (11"x17" PDF format). ■ Hard copy plans- one full size set (22"x34"). • Front End and Technical specifications for Contract Documents (Word and PDF format). ■ Engineer's estimate of probable construction costs (Excel & PDF format). 90% Design Submittal and FERC Letter Amendment Provide final 90% design submittal including construction drawings, final draft front end and technical specifications, contract documents and engineer's estimate of probable construction costs, including: ■ Electronic scalable set of plans (PDF and DWG format). Signed hard copy plans -One Full size set (22"x34"). ■ Front End Specifications completed in coordination with the City (Word and PDF format). ■ Technical specifications for Contract Documents (Word and PDF format). ■ Engineer's estimate of probable construction costs (Excel & PDF format). ■ FERC Letter Amendment to include the 90% design package for approval. City to coordinate the permit approvals. Murraysmith assumes a 2 to 3-page memo including assessment reports with 90% design documents will suffice for permitting with FERC. If additional materials and permitting documentation is required, we will negotiate these services separate of this contract on a time and materials basis. Contingency Design Task, Bidding and Construction Support Task: Task 4, 5 and 6 are considered additional task that may be used for budgeting purposes during the design and construction for 2021. Task 4 — Bidding Support Bidding Assistance Under this task, Murraysmith and Roaring Fork Engineer will provide support to the City during bidding and construction. Murraysmith: ■ Provide assistance during project bidding (assumption: one pre-bid meeting and two addenda). ■ Construction Set for Contractor and NTP. City: City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8,2020 6 G:\PDX—BD\Clients\Aspen,City of,CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docx ■ Advertise the project. ■ Manage printing and/or electronic distribution of construction contract documents. ■ Receive, open and review bids. ■ Notify bidders of intent to award. ■ Manage the contract execution with the successful bidder and provide notice to proceed. ■ Perform the day-to-day construction management and observation activities, if required. ■ Pay for permit and easement fees Task 5 — Construction Support, Record Drawings, and Closeout Construction Support Murraysmith and Roaring Fork: ■ Participation in pre-construction meeting. ■ Assist City with submittal and shop drawing review and preparation of review comments. (assumption: review up to 10 submittals plus up to six (6) re-submittals) ■ Provide consultation for construction contract administration issues. ■ Interpretation of construction contract plans and specification as requested by the Contractor or the City. (assumption: 10 RFIs) • Review Change Order documentation as required. ■ Participation in weekly construction meetings. Murraysmith to participate remotely. ■ Six (6) site visits will be made by the Consultant during the construction phase, including on-site construction observation during waterline tie-ins. Roaring Fork: ■ Participation and lead weekly construction meetings and site visits—two site visits a week. ■ Substantial completion walkthroughs ■ Final completion walkthrough Prepare record drawings of reported construction based on the Contractor's field plan mark-ups, and City and Consultant staff field notes. Provide electronic AutoCAD and PDF files, and one set of full-size record drawings. Task 6 — Contingency Design Task Cultural Resources Assessment& Report This task consists of conducting a cultural resources assessment for the pipeline and surrounds at up to five discrete work areas along the Project.This assessment includes desktop and field survey methods and would result in the development of a report that would be attached to the PCN. While Task 2 could be delayed until a time where USACE determines that a cultural resources report is needed to compete the NWP 3 authorization process,that approach could result in delays in obtaining USACE authorization for the Project. Please note that there is potential that SHPO could determine that the Project will result in adverse effects to the pipeline and may require additional research as part of the Project's authorization. City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8,2020 7 G:\PDX_BD\Clients\Aspen,City of,C0\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docx Potholing & Surveying at Proposed Access Manholes In order to confirm exact location and conditions in the field of the pipeline alignment, it may be necessary to pothole some of the critical locations that need to be confirmed from the subterranean survey data. We have included it as an optional budget item should we find more information is important to help minimize risk and provide more accurate and competitive bids for the project. Additional Pipeline Inspection Daily Rate If additional pipeline assessment is required to determine more information for rehabilitation alternatives, C&L will provide additional detailing of the pipeline with pictures and reports for the daily rate outline in the detailed fee estimate assigned to Task 6.3. Geotechnical and Geological Services At this time we have assumed geotechnical testing will not be required for the base design fees. If during the design this is deemed necessary, we will engage Kumar and Associates to provide geotechnical test holes will be performed at each of the proposed access manhole locations. We have assumed up to six (6) borings will be required for this project. City of Aspen MURRAYSMITH Maroon Creek Pipeline—Rehabilitation June 8, 2020 8 G:\PDX_BD\Clients\Aspen,City of,CO\Maroon and Castle Creek Rehab RFP\Aspen Maroon Creek Pipeline-6000 linear feet\Murraysmith-Maroon Creek Rehab-Scope of Work_Rev3.docx C Y a M N u1 1'II N CL U W .� � oo � v1Oi v1Oi � m� n � v�iror00vm �uNiM�: •�-f���� �`25�25� ^. ` � V O L'u c *' O v W w�n vz to of .,y yl Vf V1 V1 �r N Vf V1 IAN/A N N N N N N �- yy N N N N W U5 ^Y,4/ Q O V V 00 00 a N a M y n N Ol ISA 00 N y V�j .` 4 4 b Of b L E 0 LL � O V 00 61 uj i 1t v � h Ll ul y u, _,1 y a ZR -.2 C O C .a C c c d w .. v -W v v � c z "� ✓� o w m � c'Ui y �ie aa � m � d � � Fa � V a � m t�Y�� to F t. �➢ � �f � �6 � a� Av vi41 JeyL1�YN eygi eyy1�ei „IygV yNq IyyV�yNp N jFi N N W 1�A it F- � ���� ar' t EXHIBIT B PROFESSIONAL SERVICES AGREEMENT Fee Schedule Agreement Professional Services Page 12 murraysm��h EXHIBIT B 2020 SCHEDULE OF CHARGES Personnel: Labor will be invoiced by staff classification at the following hourly rates,which are valid from January 1, 2020 through December 31,2020.After this period,the rates are subject to adjustment. Billing Classifications 2020 Rates Billing Classifications Principal Engineer VI $270 Construction Manager VIII $227 Principal Engineer V $260 Construction Manager VII $219 Principal Engineer IV $250 Construction Manager VI $203 Principal Engineer III $239 Construction Manager V $188 Principal Engineer II $230 Construction Manager IV $178 Principal Engineer 1 $222 Construction Manager III $162 Professional Engineer IX $212 Construction Manager II $150 Engineering Designer IX $204 Construction Manager 1 $133 Professional Engineer VIII $202 Inspector VII $188 Engineering Designer VIII $193 Inspector VI $172 Professional Engineer VII $191 Inspector V $156 Engineering Designer VII $184 Inspector IV $145 Professional Engineer VI $182 Inspector III $129 Engineering Designer VI $175 Inspector 11 $117 Professional Engineer V $171 Inspector 1 $100 Engineering Designer V $164 Technician IV $155 Professional Engineer IV $161 Technician III $139 Engineering Designer IV $161 Technician II $120 Professional Engineer III $157 Technician 1 $101 Engineering Designer III $157 Administrative III $110 Engineering Designer II $143 Administrative II $101 Engineering Designer 1 $132 Administrative 1 $89 Project Expenses: Expenses incurred that are directly attributable to the project will be invoiced at actual cost.These expenses include the following: CADD Hardware/Software $18.00/hour Modeling and GIS Hardware/Software $10.00/hour Mileage Then-current IRS Rate Postage and Delivery Services At Cost Printing and Reproduction At Cost Travel, Lodging,and Subsistence At Cost Outside Services: Outside technical, professional,and other services will be invoiced at actual cost-plus 10 percent to cover administration and overhead. 2020OR/SW WA/ID/CO MURRAYSMITH Confidential CONFIDENTIAL EMERGENCY RESPONSE RATE SCHEDULE—C&L WATER SOLUTIONS To That Trade Contractor Agreement Between the City of Aspen and C & L Water Solutions, Inc. 303-791-2521' Superintendent per hour 1 105.00/157.50ot 105.00/157.50ot Project Manager 1 150.00 Flat 150.00 Flat Foremanper hour 5 87.00/130.5.50ot 87.00/130.50ot Pipe Layer/Truck Driver per hour 5 63.00/94.50ot 63.00/94.50ot Operatorper hour 5 70.00/105.00ot 70.00/105.00ot Laborerper hour 5 48.00/72.00ot 48.00/72.00ot Admin/R.O.W. Permit 1 65.00 LS 65.00 LS 1 hour perproject) Low Boy Transport 1 185.00 HR 185.00 HR Truck, Trailer, or Combination 2 145.00 HR 145.00 HR Transport Rubber Tired Backhoe—Cat 430 5 68.00 HR 68.00 HR Rubber Tired w/Vibratory Plate 4 83.00 HR 83.00 HR Compactor-Model—CVP-40 Skid Steer-Model—S850 Bobcat 1 42.00 HR 42.00 HR Skid Steer wBroom 1 45.00 HR 360.00 Day Wheel Loader- Large Model—L150 1 155.00 HR 155.00 HR Volvo 7-CY Excavator- Small (Zero Swing 1 68.00 HR 68.00 HR Preferred) Model—Link Belt 80 Excavator-Medium Model—Cat 318 1 130.00 HR 3200.00 week Excavator—Medium Link Belt 145 130.00 HR 3200.00 week Excavator- Large Model—Volvo 1 145.00 HR 4800.00 week EC360 C & L Water Solutions, Inc. Page 1 of 3 CONFIDENTIAL 11 MIND 11=110 Vibratory Compactor- Model—RT-85 1 26.50 HR 26.50 HR Compaction Wheel for Excavator 1 250.00 Job Dump Truck- 10 Wheel 5 50.00 HR 50.00 HR Pickup Truck- 1 Ton and Less 4 35.00 HR 35.00 HR Pickup Truck-2 Ton 5 45.00 HR 45.00 HR Generator-Greater than 30 KW 1 20.00 HR 20.00 HR Trash Pump—3"with hoses 6 15.00 HR 122.50 per ea 8 hr da Trash Pump—4"with hoses 4 19.00 HR 155.00 per ea 8 hr da Trash Pump -6 Inch ( 8" owned) this 2 110.00 HR 870.00 per ea requires fusing of pipe for by-pass without piping 8 hr day without piping Other Equipment: Leak Locator machine only) 1 102.00 HR 102.00 HR Shoring Boxes 18 240.00 Day 240.00 HR Shore Cans 3 1 240.00 Day 240.00 HR Jumping Jack Compactors 1 6 12.00 HR 12.00 HR Spoils Vac Trailer w/Truck 1 97.50 HR 97.50 HR Page 2 of 3 CONFIDENTIAL Erosion Control 5.00 per LF Inlet Protection 75.00 EA inlet Steel Plates 5'x10',8x8,8xl6 15 49.00 per day 49.00 per da Plugs 6", 8", 10", 1211, 15" 24 30.00 per day 30.00 per da 8", 10", 12" or larger Sewer Main re- Quote upon line 3 mm Fiberglass UV CIPP request Manhole Rehabilitation, Grout or Quote upon inserts request Rehabilitation of sewer tap connections Quote upon LMK Shorties, epoxy, grout, depends request on the need. Page 3 of 3 R' 4e� � � mac• � P.Q.Box 1746 Rifle,CO 81650 Phone(970)625-1954 Fax(970)579-7150 www.pcoksmvcyblem.com Since 2007 PEAK SURVEYING, INC 2020 SCHEDULE OF HOURLY RATES Total project charges are based on hourly rates plus other job related expenses as follows: PERSONNEL CHARGES Principal $140.00 Project Manager $100.00 Drafting/Field Technician $85.00 1-Man Survey Crew $120.00 2-Man Survey Crew $150.00 Expert Testimony $275.00 *Overtime performed at the request of the client or requested by the client's schedule will be billed at 1.5 times these rates. REIMBURSABLE EXPENSES Photocopies $0.20/ea Mylar Sepias $20.00/ea Vehicle Mileage $0.60/mi ATV/Snowmobiles $100.00/day Out of town living expenses, commercial carrier, vehicle and equipment rental, outside consultant fees, and miscellaneous expenses will be charged at invoice cost plus 10%. PAYMENT Accounts are DUE ON RECEIPT. Peak Surveying, Inc reserves the right to discontinue work when an account becomes past due. Finance charges in the amount of 1.5% per month (18% Annual Rate) will be assessed on all accounts not paid by the 31st day after invoice date. Client/Client Owner agrees to pay reasonable collection and attorney's fees in the event of nonpayment. Cash or checks payable to Peak Surveying, Inc and mail to: Peak Surveying, Inc PO Box 1746 Rifle, CO 81650 ROARING FORK ENGINEERING 2020 Rate Sheet Labor Category Rate Principal Engineer $195/hour Senior Project Manager $170/hour Project Manager $155/hour Senior Project Engineer $140/hour Project Engineer $125/hour Design Engineer 2 $117/hour Design Engineer 1 $110/hour Design Engineer $95/hour Inspector (PE) $143/hour Inspector(EIT) $101/hour Other Direct Costs Mileage $0.58/mile Printing 8.5x11 (black &white) $0.10/sheet Printing 8.5x11 (color) $0.20/sheet Printing 11x17 B&W $0.30/sheet Printing 11x17 color $0.40/sheet SWCA I Standard Rate Schedule 2020 LABOR CATEGORIES AND BILLING RATES Principals&Project Management Staff Project Manager III........................................ $89.00 Project Manager IX....................................... $153.00 Project Manager IV........................................ $99.00 Project Manager X......................................... $171.00 Project Manager V......................................... $109.00 Project Manager Xl........................................ $187.00 Project Manager VI........................................ $119.00 Project Manager XII. ................................... $205.00 Project Manager VII....................................... $131.00 Principal-in-Charge................................:...... $285-398 Project Manager VIII...................................... $142.00 Consulting Services Cultural Resources Air Quality Environmental Resources Graphics/Media Production Paleontology GIS/CADD Resources Scientific Resources Technical Writing/Editing Planning Resources Principal Investigator Information Technology Training,,/Facilitating Specialist I...... ......... ......... .......... ............ $67.00 Specialist IX... ............................................ $153.00 Specialist II................................................. $79,00 Specialist X................................................... $171.00 Specialist III................................................. $89.00 Specialist XI................................................. $187.00 Specialist IV.............. . ................. ............ $99.00 Specialist XII................................................ $205.00 Specialist V...........I..................1,............I...... $109.00 Su atter Expert...................................... $210324 Subject M - Specialist VI. .,. $119.00 Specialist VII. '.,. $431.00 Technician L .... ........ ..................... $47.00 Specialist VIII. $142.00 Technician N.................................................. $55.00 Administrative Administrative I............................................. $42.00 Administrative V............................................ $89.00 Administrative II............................................ $53.00 Administrative VI............................................ $101.00 Administrative III......... I....... ......... ............ $66.00 Administrative VII.......................................... $113.00 Administrative IV........................................... $77.00 Administrative VIIII.......................................... $125.00 Direct expenses are subject to a 15% administrative markup and subcontractor expenses are subject to a 20%administrative markup.These rates do not apply to depositions or testimonies at administrative hearings and trials.Such activities fall under our Expert Witness rates,which vary by state. A communication/data fee is invoiced at a rate of 3%of labor to cover such expenses(i.e.:cell phones,data plans,faxes,etc.). Overtime is invoiced at 1.2 times standard rates. Per Diem is billed at the GSA rate in place at the time of billing. Mileage is billed at the IRS mileage rate in place at the time of billing. Last revised 01.17.2020 Page 1 1 Kumar ni NssodiaeInc. Geotechnical and Materials Engineers 5020 County Road 1541(+Aand Environmental Scientists Glenwood Springs, CO 81601 phone: (970)945-7988 fax: (970)945-8454 email: kaglenwood@kumarusa.com An Employee Owned Company www.kumarusa.com Office Locations: Denver(HQ), Parker,Colorado Springs,Fort Collins,Glenwood Springs,and Summit County,Colorado FEESCHEDULE GLENWOOD SPRINGS PROFESSIONAL SERVICES FIELD EXPLORATION Truck-mounted drill rig CME-45B... $170/hour Mobilization...................................................................................................$4.00/mile All-terrain drill rig............................................................................................... Cost+20% Crewtravel ......................................................................................................$80/man/hour Special equipment (backhoe, drill bits, well supplies, etc.) .................................. Cost+20% Field Engineer or Geologist..................................................................................... $90/hour Overtime (over 8 hours/day, Saturday, Sunday and Holidays)................ 1.5 x hourly rate LABORATORY TESTING Fee schedule available on request. CONSTRUCTION OBSERVATION AND MATERIALS TESTING Fee schedule available on request. ENGINEERING (Includes project planning, administration, analysis, consultation, report preparation, field and travel time. Expert witness service has a 50%premium hourly rate.) Principal................................................................................................................ $200/hour Senior Project Manager..........................................................................................$180/hour ProjectManager.................................................................................................... $150/hour Senior Project Engineer/Geologist......................................................................... $120/hour Project Engineer/Geologist.................................................................................... $100/hour Staff Engineer/Geologist......................................................................................... $90/hour CAD/Drafting......................................................................................................... $80/hour WordProcessing ..................................................................................................... $58/hour OTHER DIRECT CHARGES Autoor pickup mileage.......................................................................................... $.70/mile Out of town living expenses, equipment rental, supplies, etc. .............................. Cost+ 20% REMARKS Late fee .of $30.00 or 1.5% per month (whichever is the greater) charged 30 days from invoice date plus collection costs, bank charges and reasonable attorney's fees. Up to 3 copies of report provided for each project. Minimum 2 hour trip charge per day for field engineer or technician. Terms and Conditions on Back Effective May 22,2019