Loading...
HomeMy WebLinkAboutresolution.council.068-20 RESOLUTION #68 (Series of 2020) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT AMENDMENT BETWEEN THE CITY OF ASPEN AND DHM DESIGN AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT AMENDMENT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a contract amendment between the City of Aspen and DHM Design, a true and accurate copy of which is attached hereto as "Exhibit A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves the contract amendment between the City of Aspen and DHM Design, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said contract change orders on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 1 I th day of August, 2020. Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held August 11, 2020. 1Z A�" - 1 Nicolea ng, City Clerk HHM HISIGN LANDSCAPE ARCHITECTURE I LAND PLANNING I ECOLOGICAL PLANNING I URBAN DESIGN August 11, 2020 Chris Everson, Affordable Housing Project Manager c/o City of Aspen via email to: chris.everson@cityofaspen.com RE: Community Outreach and Conceptual Master Plan Design for the Lumberyard Affordable Housing Development—Contract Addendum 4: Continuing Services Scope of Work and Fee,August-December 2020 Chris: We are glad to continue supporting the City of Aspen on the Lumberyard Affordable Housing Project. Based on the direction of City Council on July 6, 2020, we are submitting our proposal for the continuation of the project work plan for the remainder of 2020. This work plan continues to target the selection of a preferred master plan by the end of the year. The original project team remains intact,with architects Charles Cunniffe Architects, planner Robert Schultz Consulting, civil engineer Roaring Fork Engineering, and PR firm Manifest/Darnauer. To meet the needs to technical research and evaluation, including traffic, noise and survey. Below is a narrative scope of work, aggregate fees by task, and an outline schedule of activities through the end of 2020. We are targeting early November for preferred master plan selection and have based our work plan and associated fees based on that timeline. The overall proposed timeline is responsive to City Council's desire to reduce the total project timeline. For 2020,we have reduced the anticipated schedule by one month and have added initial land use activities to the 2020 work plan. Longer-term the team is working to target ground- breaking in 2024 instead of 2025;that schedule will be developed in greater detail as the project progresses. Similar to our approach to the original scope of work we have estimated our hours for each task;we will access the hours flexibly to be responsive to project needs, but will not exceed the top-set fee without prior authorization from the City. Our team reached the end of the prior work scope with budget remaining;to maintain momentum and schedule we have leveraged that remaining budget to begin work on the first steps of the technical studies and master plan option revisions. This has been accounted for in our fee proposal and timeline.We have provided a summary of the total project contract at the end of this document and have accounted for the remaining fee values,from Addendum 3, in our Addendum 4 fee proposal.The services, deliverables, and fee described below are in addition to the original contract amount and prior contract addenda.We assume that this agreement will become Addendum 4 to the original contract. Prior Scope of Work; Next Steps: The prior contract addendum included tasks described in the master project schedule as"Task 6",with alterations to the original schedule as needed to advance the project responsibly during the ongoing pandemic. Based on council feedback July 6'h,we are narrowing the range of total potential units for the project to target +/-300, and narrowing the site layout to focus on "Option B"of the 7/6 presentation materials.Additionally, our efforts will study reduction of underground parking to understand the balance of unit count, site arrangement, massing, and parking at the targeted numbers. This scope of work also includes continuation of stakeholder, public, neighbor, and technical advisor outreach and communication.We have formatted our scope of work to be responsive to the known public health requirements, and to be flexible in adjusting to unknown,future requirements related to the pandemic. The scope of work for Tasks 7 and 8 is detailed in the following pages. DENVER CARBONDALE DURANGO BOZEMAN WWW.DHMDESIGN.COM 311 Main Street,Suite 102 Carbondale,Colorado 81623 P:970.963.6520 HHM HISIGN New Scope of Work: Tasks 7-8: Task 7—Refined plans and preliminary technical studies-August-September 2020 Refinement of master plan alternatives per council feedback and direction during 7/6 council work session.The team will continue to refine the building and site design and project program,focusing on "Option B"and targeting +/-300 units.The studies will further develop the site and massing diagrams to illustrate responsiveness to council direction.We will study two primary alternatives: (1)will target the higher unit count, mitigating building mass with underground parking. (2)Will evaluate a reduction In underground parking(focusing on at-grade,shared garages)with a reduction in total unit count to mitigate building height and massing.Two overlays will also be carried forward: a modification to the building layout along Sage Way to create a protected, Internal courtyard, and a modification to the building layout and type at the north end of the site to allow for shared-living studio format.An Initial phasing study will be developed for the two primary alternatives. Deliverables:Refined plan diagrams and massing models,presentation graphics similar to those presented at the close of Task 6. Refinement of building and site program for each plan alternative.A series of tables were developed in Task 6 to track unit data and project program.These tables will be revised with updated unit mix for each alternative. Deliverable: Updated project data tables. Character and program Imagery. Using precedent from other excellent housing developments, we will develop packages of imagery related to building character, materials, site amenities, and other unique or innovative program that will begin to tell the story of the project and how it will fit into the community context of Aspen and the ABC neighborhood.These materials will be used initially in neighbor and stakeholder outreach, and presented to council for feedback.We will continue to refine the imagery package for use in the public outreach process in Task 8. Deliverable: Character imagery package. - Land use draft parameters.Our team will begin evaluating the alternatives against the land use code and establishing preliminary land use parameters;this will support an understanding of the land use Implications related to each option. Deliverable:Draft land use review memo. - Technical studies/data evaluation. o Existing conditions site survey, including typical ex conditions collection.This will include surface survey: property boundaries,topography, surface utilities,easements. o Geotechnical soils. Our Intent Is to use a recent study performed on an adjacent property to inform the geotechnical soils conditions at the master plan level.A project-site-specific geotechnical soils investigation will be required later in the process. o Noise. The team will establish a monitoring system to collect noise data specific to the Lumberyard project site. This, along with historical data from the airport,will be used to evaluate the impacts of highway and airport noise on the site and to generate preliminary recommendations for nuisance noise mitigation. o Utilities. Using the unit mixes developed for the refined options, we will coordinate with the relevant utility providers to understand system capacity and identify thresholds related to the Lumberyard development. o Cost, constructability, and phasing. The project team will work with City staff and the City's engaged housing contractors to evaluate, at a conceptual level, order-of-magnitude cost for the project.We will also identify preliminary phasing and constructability options/challenges. o Energy efficiency. As a part of the refinement of architectural massing, we will establish preliminary energy efficiency parameters for the buildings,with the intent of understanding the impacts on massing,footprint, and site arrangement. o Preliminary transportation study. A larger transportation study related to the ABC is underway and sponsored by Pitkin County.We will engage with the consultant responsible for that effort, using the baseline data results to inform the preliminary study for the Lumberyard.We have included time in our scope for coordination with the County traffic study team.Although the Lumberyard study will be project-specific, an understanding of the relationship between the two studies is necessary.The project-specific study will include an evaluation of the impacts of the Lumberyard development to the OHM H [SIGN existing transportation infrastructure, and preliminary recommendations for multi-modal transportation impact mitigation options for review and discussion. o Air quality monitoring. Our team proposes working with the City's Environmental Health department to establish parameters for a planning-level air quality evaluation. Deliverable:technical studies summary report, existing conditions survey,preliminary transportation study. - Stakeholder and TAC engagement. Direct and targeted stakeholder outreach has resumed, with meetings and calls to specific neighbor groups and an email project update to the broader stakeholder and TAC list.We have planned charrettes with selected stakeholders in August,during the design refinement process.The project web site will be updated with current project information. Stakeholder outreach will continue through Tasks 7 and 8. Deliverable:Summary notes from all stakeholder meetings. - Team meetings.Throughout Tasks 7, and 8, DHM will continue weekly check-in meetings with the City project manager and, as the task progresses, include full team meetings as necessary to coordinate the design and technical studies.Additionally,the team will schedule design review and charrette meetings to advance the iterative building and site concepts. Deliverable: Team meeting notes. Task 7 technical studies (transportation, noise, utilities)*:$32,000 Task 7 existing conditions survey:$13,500 Task 7 design/planning team fee:$83,500 Task 7 Reimbursables:$1,000 Task 7 subtotal:$130.000 *The value for this line item Includes the three listed technical studies. Other topics noted in the scope narrative will be covered by the design✓planning/City staff team.All topics noted in the scope narrative will be summarized in the technical studies report. Task 8—Public outreach and preferred alternative selection-October-November 2020 - Stakeholder/neighbor outreach will continue in this phase, with targeted meetings with specific stakeholders/neighbors, and email updates to the broader project database.We have also included scope for team member attendance at up to six community group meetings.These may include the AYPA, NextGen, CCLC, and others. The project web site will also be updated at this time. - Public outreach. Using the refined massing, site study, and character imagery from Task 7, the team will format and facilitate a series of public outreach activities.We recognize that in-person outreach is difficult at this time, and that the availability of in-person outreach in September and October is unknown.We have included scope for team participation in community events as a 'pop-up open house'(up to two and where appropriate), and a public open house series of two meetings. Additionally, regardless of the availability of In-person meetings,there will be members of the community who will be uncomfortable or unable to participate in person, and that online engagement will be necessary.We will host an interactive project webinar—that will also be available for viewing at the public's convenience—and will make the project materials and feedback tools available on the project web site.This online engagement will run for approximately six weeks during the public outreach period. Public outreach and stakeholder engagement will be summarized In an outreach document similar to the prior two outreach summaries. Deliverable: Communications products and a public outreach summary document,open house activities;project web site updates. - Technical studies, continued.We have assumed that the duration of the technical studies will extend into task 8,with early findings informing the evolution of the development alternatives, and the summary report of preliminary technical studies supporting the selection of the preferred master plan. - Council check-in meeting. Following the outreach activities, the DHM team will work with the City project manager to format a presentation to City Council.We will present the refined design alternatives,the results of the stakeholder engagement, results of the preliminary technical studies, and other new information as developed during Tasks 7 and 8.The target outcome of this presentation HHM H [SIGN is to further narrow the direction for refinement and selection of the preferred alternative at the close of Task 8, ideally with a clear preference for the preferred alternative. Deliverable:City Council presentation materials. - Refinements to master plan materials per stakeholder/TAC outreach, public feedback, and council direction.The schedule presumes a short period of refinement and/or additional materials needed by the council to select the preferred master plan,with one or two top alternatives advancing to final selection.We will summarize the results of the outreach and update the presentation materials, advancing one or two site plan alternatives to'final draft master plan'format.The materials will also advance the level of detail in character studies for the site and architecture, allowing the public and council to understand and provide direction on the overall design aesthetic, amenities,and livability(at a master planning level). Deliverable:refined alternative products(site plan, massing, character), and project program materials. - Project next steps 2021 (Land Use Application).To allow the team to continue seamlessly into the Land Use Application in 2021,we will generate a work plan, scope and budget for the development of the land use application.This work plan will Identify the tasks, schedule,and deliverables associated with submitting the land use application in the latter half of 2021. Deliverable: Work plan, schedule, and budget for 2021 land use application. - Land Use Application framework.The team will refine the land use evaluation memo with current project information, and will develop an outline for the land use application in support of the overall project work plan. This will include land use parameters and submittal requirements. If the process to date has resulted in a clearly preferred program, it may be appropriate to schedule a pre-application meeting at the close of Task 8 to formally Identify the land use application requirements. Deliverable: land use application approach summary memorandum. - Council meeting: selection of preferred master plan.The team will present the final master plan alternatives to city council and request selection of a preferred master plan, including building and site design concepts and project program. Deliverable: City Council presentation materials. Task 8 technical studies allowance (transportation, noise, utilities):$11,000 Task 8 design/planning team fee:$87,500 Task 8 Reimbursables:$1,000 Task 8 subtotal. inc/ud/no allowances:$100.000 Fee Summary Task 7. $130,000 Task 8: $ 99,500 Less budget remaining from Task 6: $-30,000 Total Continuing Services Addendum 4:$199,500 Lumberyard fee summary to date(including reimbumables): Original contract: $157,670 Addendum 1: $ 14,968 Addendum 2: $ 36,778 Addendum 3: $ 97,500 Addendum 4: $199.500 Project total through addendum 4: $506,416 Attachments: Task 7&8 project schedule. OHM HISIGN Additional Services: Should additional services become necessary due to phasing and/or major design changes due to reasons beyond the control of this office,this work will be done on an hourly basis. If this work becomes significant we may, at your request, submit a proposal at that time which will identify the extent of any additional work prior to commencement of the work. Acceptance:This agreement may be terminated at any time by the Owner or DHM Design Corporation upon giving (7)days written notice.Work performed up to the date of termination shall be due and payable and shall be included in the final statement.This agreement, unless previously terminated by written notice, shall be terminated by the final payment for the finished work. Please do not hesitate to call with any questions as you review this letter.We look forward to continuing our work with you on this project. Respectfully, DHM Design Jason Jaynes Owner or Authorized Representative Date Managing Principal, dhm design