Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
resolution.council.009-21
RESOLUTION #009 (Series of 2021) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT AMENDMENT BETWEEN THE CITY OF ASPEN AND ARTAIC GROUP LLC AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT AMENDMENT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council an amendment to the Owner-Construction Manager as Advisor agreement between the City of Aspen and Artaic Group LLC, a true and accurate copy of which is attached hereto as "Exhibit A"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves the amendment to the Owner-Construction Manager as Advisor agreement between the City of Aspen and Artaic Group LLC, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said contract amendment on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 26th day of January, 2021. Torre, Mayor I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held June 26, 2021. Nic7reVkining, City Clerk DocuSign Envelope ID:B85A3353-1286-46BD-BFD4-E094B6EA3068 Exhibit A -Part 2 Contract amendment with Artaic Group Additional Services Authorization(ASA)#01 Project:Burlingame Ranch Phase 3 Affordable Housing Development Agreement:AIA C132 Standard form of agreement between Owner and Construction Manager as Adviser Owner.City of Aspen Construction Manager:Artaic Group,LLC Owner and Construction Manager are parties to the above referenced agreement executed on 3/10/2020,for the above referenced Project and agree to amend the Agreement as follows: 1. Scope:Artaic Group shall perform the services referenced as"Part 2"Construction Administration,in the referenced agreement. Additionally,Artaic Group has subcontracted the services of CAIRN Consulting to provide Quality Assurance services including: a. Weekly OAC attendance b. Contractor and Modular Manufacturer coordination meeting participation as necessary c. Modular factory and site coordination assistance,including shipping&receiving logistics d. Modular factory quality control observation e. 'Ready-to-ship'inspection management f. Observe modular receipt at site and document any potential freight damage as contractor takes possession g. Assist with freight damage claims h. Set,Structural Stitch,MEP Stitch,and temporary dry in activity observation I. Observation reports will be provided for factory and site activities j. Factory visits at a frequency per the attached k. Site visits at a frequency per the attached 2. Schedule:Artalc Group's fee is based on the schedule assumptions detailed per the attached. 3. Fee:Detailed schedule of values is attached. a. Project Management Fee(Artaic):$400,498 b. Modular Quality Assurance(Subcontract):$132,000 TOTAL FEE:$532,498 c. Reimbursable Expense Allowance:$39,606 4. Attachments: a. Exhibit A:Part 2 Construction Administration Fee Details Except as expressly amended above,the Contract shall remain unmodified. CLIENT: CONSULTANT: City of Aspen Artaic Group, LLC Sara Ott By: By: A gkvv, W(Lf,-(4 W Signature: ��`� o' Signature: aA4,,) Title: City Manager Title: IQ I Como ©voomo©m000m©voomm©o®o�m ��00000mm®®mmm®®m®mmm®o ��0000000mmmmmm000momoo �mmmmmmmmo©0000000000©o®o ©v©o®®®m000m©mtmomm®o®o�m ��mmmmtm®®mmmmmmmm0mmo0o ��mmmmmmmomoommmmm®moon REVISED PROPOSAL REVISED PROPOSAL �000moomommm®®®®®®©mmm.®mo ®';REVIIED PROPOSAL ©mmmm®®m000m mm©om®®m®o�m ��mmmmm��mmmm®®®mmt®®®moo ��®®®®®®®mtmt�mtmtmtmtmt�m�mt�o �mmmmmmmm��m00000000000ao �ommmmmmm��mmom©m�mmm®opo REVISED PROPOSAL ©000®®®m000m©000mm©o®o�m REVISED PROPOSAL ��memt����mt�emteemtmteeeem.e�� ©voomm©m000m©000momo®opo