Loading...
HomeMy WebLinkAboutFile Documents.634 W Main St.0018-2019-BROF (7)Permit Application :: Page 1 of 4 Applicant Details Account/Company:UMBRELLA ROOFING INC If you are applying on behalf of a company, please verify your contact information below, and correct it if needed, then hit "Next" Email:deric@umbrella-roofing.com Phone:(970) 309-7823 Mailing Street:PO BOX 1717 Mailing City:CARBONDALE Mailing State/Province:CO Mailing Zip/Postal Code:81623 Mailing Country:United States Permit Contacts This section is for adding contacts related to your permit application so that they may have direct access to this record. If an or is not in the dropdown list below then they will need to to use the system. You canAccountContactRegister skip this section while your contact is being registered and add them to your permit application after submission by navigating to the Permit record and following the instructions at the top of the page. Permit Contacts Account Contact Type Contractor UMBRELLA ROOFING INC DERIC BARTON Applicant Permit Basics 11/06/2019 Permit Application :: Page 2 of 4 If you do NOT see the address you need in the drop down list, please enter To Be Determined into the address field, and in the Description field of the permit that is provided later, enter the address you wish to use. Permit staff will verify the address and work with our GIS staff to update the database if warranted. Address Address: 634 W MAIN ST 1, ASPEN : 273512447001 Description of Work Description: *Remove & Replace Roof - Protection of all grounds as necessary. - Remove existing roof layers down to original wood sheathing.- Inspect wood sheathing for damage. - Install high temp ice & water shield over entire roof surface including two layers in all valleys. - Custom fabricate and install 24ga Kynar coated roof related flashings. (Color TBD) - Strip in all necessary roof related flashings using high temp ice & water shield. - Install Malarkey starter at all eaves and transitions.- Install Malarkey Legacy architectural asphalt shingles over entire roof surface. (Color TBD) - Flash all pipes/roof penetrations using industry best practices.- Install Malarkey hip/ridge cap at all necessary locations. - Clean up and removal of all waste. **Price includes as restroom for duration of project. *Snow Retention - Install RG10 heavy duty powder coated snow guards above alley parking and above walk way on eastside of roof per City of Aspen. - Includes all necessary accessories. - Clean up and removal of all waste. Valuation Valuation:$59,480.00 Reason for Valuation Change: Roofing/Re-Roofing Details Use of Building:Multi-Family Applicant is a Nonprofit?:No Deed Restricted?:No HOA/Covenant:HOA/Covenant Approval Acquired HPC Certificate of Appropriateness?: Located in a PD?: Sq Ft of Building Work Area:4,200 Requires Asbestos Test?:No Affects Parking/Alleys/Loading?:No Work Affects Tree/Drip Line?:Yes Located Within City Mall Boundaries?:No Impacts City Trails/Parks?:No Adjacent to City Open Space?:No Code Editions: 11/06/2019 Permit Application :: Page 3 of 4 Other Code Editions: Open Text Field For Comments: Submissions Permit Required Documents Many permit applications require documents (such as site plans or checklists) to be included. Upload such documents on this page. Learn more about required documents at or, for building andwww.cityofaspen.com/655/Permits associated permits, see www.cityofaspen.com/248/Document-Library Please do submit zip files. All Uploaded files should be in PDF format. To prevent mistakes with filenot overwriting or duplication, wait until you are ready to Submit your application to upload your files. Please follow these steps to successfully upload and verify your documents: 1. Be sure you are using Google Chrome as your browser. Other browsers, such as Firefox, may cause errors when you try to upload. If there is a required document listed in the table below, please upload that document directly to thisalready application by clicking the to the right of the line for the document. file icon 2. To upload additional files not already listed, click “” and in the window that appears, navigate to the fileAdd More location on your computer, select the file you want and click “” to add it to the list of files to upload. Open Should you need to add more than one file at a time, hold down ctrl + click (Windows) or command + click (Mac) to select multiple files on your computer. Next, click “Open” to add them all to the list for upload. 3. AFTER you have added up to files, hit “” below the table to upload your files to the system. It may40Upload take a moment for your upload to complete. Please do not load more than documents at a time. If you need to add40 more than 40 documents, repeat the process by hitting " again.Add More" For a list of required docs, click .here Please wait to upload until you are ready to Submit your permit, to avoid overwriting documents or issues with versioning. Sign 11/06/2019 Permit Application :: Page 4 of 4 Write your Final Signature in the box below, then click “Accept and Save Signature” at the bottom right corner of the box. Then hit “Next” to go to the Submit page. By signing below you agree to this statement: I hereby certify that I have read and examined this application, that I know the same to be true and correct and that I have uploaded all required documents. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Final Signature Submit Finish 11/06/2019