Loading...
HomeMy WebLinkAboutFile Documents.624 E Cooper Ave.0010-2020-TSTR (8)Mezzaluna Temp Structure Building Comments Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf Provide a written statement from the business acknowledging that they accept the responsibility and associated liability for snow removal from the structure and will maintain it in a safe and secure manner. We are having to rely on these maintenance agreements because we are not getting engineered roof snow loads for these structures. A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf (7) Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf 5% of your dining surfaces and seating is required to be accessible. Identify required accessible seating, show the required 30"x48" approach clearance at accessible seating, and call out table height at accessible tables (28-34" high). Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf Are you proposing to heat this enclosure? No heat is shown, please confirm. Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf Provide your detail for this connection to the existing I beam and a statement from the building owner that they are okay with that connection. Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf Is this one of your two required exits for the existing space? Please confirm whether you will still have 2 compliant exits from the existing restaurant. Provide a written statement from the business acknowledging that they accept the responsibility and associated liability for snow removal from the structure and will maintain it in a safe and secure manner. We are having to rely on these maintenance agreements because we are not getting engineered roof snow loads for these structures. 8'-0"REMOVABLE PANEL 5% of your dining surfaces and seating is required to be accessible. Identify required accessible seating, show the required 30"x48" approach clearance at accessible seating, and call out table height at accessible tables (28-34" high). REMOVABLE PANEL Are you proposing to heat this enclosure? No heat is shown, please confirm. 3'-1"ER AVE.ADO 81611EXIT 47'-0"2X6 FRAME WALL 16" O.C. WRAP &ATTACH AT ISLAND AFFIX AT 'EXISTING WALL LEADGER INTO EXISTING STEEL I BEAM FLANGEB Provide your detail for this connection to the existing I beam and a statement from the building owner that they are okay with that connection. EXIT EXIT E IS Is this one of your two required exits for the existing space? Please confirm whether you will still have 2 compliant exits from the existing restaurant. Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf Clearly show the required 36" wide accessible route through the space and compliance with IBC 1029.12. The accessible route needs to connect all exits (doubles as your required aisle) and all accessible seating. We have to have a compliant normal/non-covid seating plan to establish your maximum "baseline" occupant load of the space that any health order in effect are applied to. Subject: PlanCheck Page: 2 Author: justinh Color: File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf Confirm that both exits from the enclosure will have a clear width of 32", elevations make these dimensions look more like rough opening than clear width of the door. If you are pursuing an occupant load over 50 for the enclosure you'll either need to provide compliant panic hardware for each door or signage and door hardware that complies with IBC 1010.1.9.3 exception 2. SEATING PLAN 15'-3"47'-0"EXIT EXIT 3'-1"8'-0"8'-0"3'-1" EXITREMOVABLEPANEL 8'-0"REMOVABLEPANEL REMOVABLEPANEL REMOVABLEDOOR REMOVABLEDOOR 2x6 FRAME WALL@ 16" O.C.1/2" EXTERIOR SHEATHING &BOARD & BATTENOVER TOP EXISTING BRICKISLANDS (3 TOTAL) Clearly show the required 36" wideaccessible route through the space andcompliance with IBC 1029.12. Theaccessible route needs to connect allexits (doubles as your required aisle)and all accessible seating. We have tohave a compliant normal/non-covidseating plan to establish yourmaximum "baseline" occupant load ofthe space that any health order ineffect are applied to. TING PLAN 15'-3" EXIT3'-1" REMOVABLE DOOR 2x6 FRA @ 16" O 1/2" EXT SHEATH BOARD OVER TOConfirm that both exits from the enclosure will have a clear width of 32", elevations make these dimensions look more like rough opening than clear width of the door. If you are pursuing an occupant load over 50 for the enclosure you'll either need to provide compliant panic hardware for each door or signage and door hardware that complies with IBC 1010.1.9.3 exception 2.