HomeMy WebLinkAboutFile Documents.624 E Cooper Ave.0010-2020-TSTR (8)Mezzaluna Temp Structure Building Comments
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
Provide a written statement from
the business acknowledging that
they accept the responsibility
and associated liability for snow
removal from the structure and
will maintain it in a safe and
secure manner. We are having
to rely on these maintenance
agreements because we are not
getting engineered roof snow
loads for these structures.
A0_624 E. Cooper - Mezzaluna Patio PERMIT 11.24.20.pdf (7)
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
5% of your dining surfaces and
seating is required to be
accessible. Identify required
accessible seating, show the
required 30"x48" approach
clearance at accessible seating,
and call out table height at
accessible tables (28-34" high).
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
Are you proposing to heat this
enclosure? No heat is shown,
please confirm.
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
Provide your detail for this
connection to the existing I beam
and a statement from the
building owner that they are
okay with that connection.
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
Is this one of your two required
exits for the existing space?
Please confirm whether you will
still have 2 compliant exits from
the existing restaurant.
Provide a written statement from the
business acknowledging that they accept
the responsibility and associated liability
for snow removal from the structure and
will maintain it in a safe and secure
manner. We are having to rely on these
maintenance agreements because we are
not getting engineered roof snow loads
for these structures. 8'-0"REMOVABLE
PANEL
5% of your dining surfaces and
seating is required to be
accessible. Identify required
accessible seating, show the
required 30"x48" approach
clearance at accessible
seating, and call out table
height at accessible tables
(28-34" high).
REMOVABLE
PANEL
Are you proposing to heat this
enclosure? No heat is
shown, please confirm.
3'-1"ER AVE.ADO 81611EXIT 47'-0"2X6 FRAME WALL
16" O.C. WRAP
&ATTACH AT
ISLAND
AFFIX AT 'EXISTING
WALL
LEADGER INTO
EXISTING STEEL
I BEAM FLANGEB
Provide your detail for
this connection to the
existing I beam and a
statement from the
building owner that
they are okay with that
connection.
EXIT
EXIT
E
IS
Is this one of your two
required exits for the
existing space?
Please confirm
whether you will still
have 2 compliant exits
from the existing
restaurant.
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
Clearly show the required 36"
wide accessible route through
the space and compliance with
IBC 1029.12. The accessible
route needs to connect all exits
(doubles as your required aisle)
and all accessible seating. We
have to have a compliant
normal/non-covid seating plan to
establish your maximum
"baseline" occupant load of the
space that any health order in
effect are applied to.
Subject: PlanCheck
Page: 2
Author: justinh
Color:
File Name: A0_624 E. Cooper - Mezzaluna Patio PERMIT
11.24.20.pdf
Confirm that both exits from the
enclosure will have a clear width
of 32", elevations make these
dimensions look more like rough
opening than clear width of the
door.
If you are pursuing an occupant
load over 50 for the enclosure
you'll either need to provide
compliant panic hardware for
each door or signage and door
hardware that complies with IBC
1010.1.9.3 exception 2.
SEATING PLAN
15'-3"47'-0"EXIT
EXIT
3'-1"8'-0"8'-0"3'-1"
EXITREMOVABLEPANEL
8'-0"REMOVABLEPANEL
REMOVABLEPANEL
REMOVABLEDOOR
REMOVABLEDOOR
2x6 FRAME WALL@ 16" O.C.1/2" EXTERIOR SHEATHING &BOARD & BATTENOVER TOP
EXISTING BRICKISLANDS (3 TOTAL)
Clearly show the required 36" wideaccessible route through the space andcompliance with IBC 1029.12. Theaccessible route needs to connect allexits (doubles as your required aisle)and all accessible seating. We have tohave a compliant normal/non-covidseating plan to establish yourmaximum "baseline" occupant load ofthe space that any health order ineffect are applied to.
TING PLAN
15'-3"
EXIT3'-1"
REMOVABLE
DOOR
2x6 FRA
@ 16" O
1/2" EXT
SHEATH
BOARD
OVER TOConfirm that both exits from the
enclosure will have a clear width of 32",
elevations make these dimensions look
more like rough opening than clear width
of the door.
If you are pursuing an occupant load over
50 for the enclosure you'll either need to
provide compliant panic hardware for
each door or signage and door hardware
that complies with IBC 1010.1.9.3
exception 2.