CONSTRUCTION MANAGEMENT PLAN
for
MEZZALUNA
624 EAST COOPER STREET
ASPEN, COLORADO 81611
2 | Page
Table of Contents :
1.0 GENERAL ................................................................................................. 2
2.0 PROJECT INTRODUCTION ........................................................................ 4
2.1 Project Location…….................................................................................. 4
2.2 Project Disturbance Area ........................................................................ 4
2.3 Project Description ................................................................................. 4
3.0 PROJECT DOCUMENTATION ................................................................... 5
3.1 Permitting................................................................................................ 5
3.2 Public Notification ................................................................................... 5
3.3 Project Sign .............................................................................................. 5
3.4 Contact List .............................................................................................. 6
4.0 PROJECT IMPLEMENTATION .................................................................... 7
4.1 Dates of Construction .............................................................................. 7
4.2 Hours of Construction.............................................................................. 7
4.3 Construction Schedule ............................................................................ 7
4.4 Adjoining Properties………........................................................................ 7
4.5 Project Fencing …………............................................................................ 7
4.6 Natural Environment .............................................................................. 7
4.7 Public Health and Welfare....................................................................... 7
3 | Page
5.0 PROJECT MANAGEMENT ………................................................................ 8
5.1 Parking Management............................................................................... 8
5.3 Emergency Access…................................................................................... 8
5.4 Staging Areas ............................................................................................. 8
6.0 TRAFFIC CONTROL ......................................................................................9
6.1 General .......................................................................................................9
6.2 Haul Routes................................................................................................. 9
6.3 Weight and Size Limitations of Vehicles ..................................................... 9
6.4 Delivery Requirements................................................................................ 9
7.0 PEDESTRIAN PROTECTION ………................................................................. 9
8.0 SEDIMENT AND EROSION CONTROL .......................................................... 9
8.1 Requirements.............................................................................................. 9
9.0 FUGITVE DUST CONTROL............................................................................. 9
9.1 Dust Control Plan......................................................................................... 9
10.0 EMISSIONS.................................................................................................. 9
10.1 General....................................................................................................... 9
10.2 Emissions from Diesel Powered Engines ................................................... 9
11.0 NOISE SUPPRESSION................................................................................... 9
11.1 General........................................................................................................ 9
11.2 Noise Suppression Plan................................................................................ 9
4 | Page
1.0 General
1.1 The purpose for this CMP is to let you know our plans for the
Temporary Exterior Enclosure.
1.2 Total Square Footage of Area Elcosure = Approx. 640 SqFt
1.3 Total Square Footage of Soil Disturbance = Zero – N/A.
1.4 CMP Submission Certificate – Attached.
2.0 Project Location
2.1 Total Disturbance Area = Zero – N/A
2.2 Project Vicinity Map (Enlarged -Attached.)
2.3 The Project consists of a Temporary Exterior Enclosure.
There will be NO effect on Public Utilities.
5 | Page
3.0 Project Documentation
3.1 Permit Types we will be submitting :
Building Permit.
A project update shall be provided to the public on a basis no less
than monthly, via website on-site notices, or other accepted means
of notification (per request of the City of Aspen). The first public
notification shall occur no later than 10 days prior to construction.
ALL properties within 300 Feet by letter.
(3.2 - Notice - Attached.)
3.2 Project Sign will be constructed and posted within 30 days of
Construction. (Appendix A – Project Sign – Attached.)
6 | Page
3.3 The currently planned Project Contacts and Construction Team is as
follows :
Owner : Mezzaluna Aspen
624 East Cooper Street
Aspen, CO 81611
Architect : N/A
Contractor : Rutgers Construction
256 Twining Flats Road, Aspen, CO 81611
Phone : (970) 925-8229
Project Manager : James Guest
Phone : (970) 379-1195
email : james@rutgersconstruction.com
Site Supervisor : TBD
Safety & Traffic Control Officer : TBD
EMERGENCY : Dial 911
Police Department : (970) 920-5400
Fire Department : (970) 925-8484
Pitkin County : (970) 920-5526
City of Aspen : (970) 920-5000
RFTA : (970) 925-8484
Holy Cross : (970) 945-5491
Source Gas : (970) 928-0401
Aspen Consolidated Sanitation : (970) 925-3601
7 | Page
4.0 Project Implementation
4.1 Dates of Construction :
Currently, the work is scheduled to commence around the 7th
December, 2020. It is estimated that the total duration will be 5
working Days, with a desired completion of 11th December 2020.
4.2 Hours of Construction :
Construction hours will be limited to 8:30am – 5:30pm, Monday
through Friday. Construction activities will not be permitted on
Sundays or federally designated holidays. 624 East Cooper Street is
inside of the Commercial Core and Central Resort Areas.
4.3 Construction Schedule : Monday 7th December through Friday 11th
December 2020.
4.4 No excavation – N/A.
4.5 Project Fencing : N/A
4.6 Covid-19 Site Safety Plan Attached.
4.7 N/A – No Tree Issues.
8 | Page
5.0 Project Management
5.1 NO Right Of Way (ROW) will be needed for this permit.
5.2 Continuous access for emergency vehicles (police, fire, and
ambulance) will be maintained on and around the project site.
5.3 We will be requesting approx. 2 parking spaces via Parking Permits.
5.4 Map showing locations of : N/A – Built off site then installed.
5.5 N/A
5.6 Staging and Materials : N/A - Temporary Structure Built Off Site.
5.7 Waste Management / Recycling : N/A - Temporary Structure Built
Off Site. We will be removing ALL Trash via Rutgers Vehicles every
day.
9 | Page
6.0 Traffic Control
6.1 Safety & Traffic Control Officer : N/A
6.2 Project Haul Routes : N/A
6.3 Construction Vehicles / Delivery Vehicles : N/A
6.4 Traffic Control Plan is not needed for this permit.
7.0 PEDESTRIAN PROTECTION - N/A
8.0 Sediment and Erosion Control – N/A
9.0 Fugitive Dust Control – N/A
10.0 Emissions - N/A
11.0 Noise Suppression – N/A
Mezzaluna Aspen
624 East Cooper Street
BUILDING PERMIT
# TBD
JOB SITE PHONE #
970-379-1195
EMERGENCY PHONE #
970-379-1195
970-379-5810
RUTGERS CONSTRUCTION, INC.RUTGERS CONSTRUCTION, INC.
S ORIGINAL STN 3RD STLACET LN
E COOPER
A
V
ELONE P
INE
RDMATCHLESS DRSPRUCE STN 4TH STU
T
E
A
V
E BRENDENCTW HOPKIN
S
A
V
E
E HOPKINS
AVEN GALENA STREGENT
STN 2ND STVINESTDEAN ST
RIOGRA
N
D
E
P
L
S 1ST STN GARMISCH STSOUTHAVE
ALLEY
OA
K
L
N
L
A
C
E
T
C
TCLEVELAND STN MONARCH STS HUNTER STS 3RD STN 1ST STS GALENA STS MONARCH STS WESTEND STS ASPEN STS 2ND STS MILL STS SPRING STS GARMISCH STALLEY N MILL STPARK AVES 4TH STW BLEEKE
R
S
T
N
S
P
R
I
N
G
S
T
BAYST
W MAIN ST
ALLEY
E SNARK
S
T JUSTICEEXWYDALEAVE
E FRANCIS
S
T
E HYMAN A
V
E NEALE AVEALLEY
E BLEEKER
S
T
TRA
I
N
O
R
S
LND
G
ALLEY
S SPRING STOBERMEYERPLACE DR GIBSON
AVERECYCLECIR
DEAN ST N RIVERSIDEAVEALLEY
LIBRARYALLEY
ALLEY
SUMMIT S
T
VINE STW FRANCIS
S
T
W HYMAN A
V
E
E DURANT
A
V
E
E MAIN ST
ALLEY PARK CIRALLEY
E COOPER
A
V
E
ALLEY
ALLEY
W HALLAM
S
T
ALLEY
ALLEY
E BLEEKE
R
S
T
E HOPKINS
A
V
E
ALLEYGILBERT
S
T
ALLEY
DEAN ST
E HALLAM
S
T COWENHOVENCTW COOP
E
R
A
V
E
MINERSTRAIL RD
JUAN ST
QUEE
N
S
T
MIDLANDAVEART PKYPARK
C
I
R
ASPEN MTN R
D WA
LNU
T
S
T
KING
S
T
AJA
X
A
V
E
ASPEN MTNCUTOFF RDRACE STC
O
T
T
O
N
W
O
O
D
L
N
LITTLECLOUD TRL
PU
P
P
Y
S
M
I
T
H
S
T
S RIVERSIDE AVEMA
P
L
E
L
N
WATERS A
V
E
Central Resort Area and Commercial Core Area Map
Central Resort Area
Commercial Core Area
Certificate of Completion
THIS ACKNOWLEDGES THAT
James Guest / Rutgers Construction
HAS SUCCESSFULLY COMPLETED
THE CITY OF ASPEN CONSTRUCTION MANAGEMENT COURSE
2018-11-09
CITY OF ASPEN, ENGINEERING DEPARTMENT DATE