Loading...
HomeMy WebLinkAboutFile Documents.619 N 4th St.0026-2021-BROF11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 1/10 Close Window Print This Page Expand All | Collapse All 0026-2021-BROF Number 0026-2021-BROF Record Type Roofing/Re-Roofing 619 N 4TH ST Owner Lilly Culver Original Number 21-1014 Status Closed - Final Type Roofing/Re-Roofing Reason for Cancel or Compl. Review Fail Applicant JACOB WEEMS No STORM KING ROOFING LLC Bluebeam Project Id 264-462-323 Project HPC-ZON-EH-UTIL Review Master Building Permit Eng Review Eng-CMP Rev, Permit Contractor STORM KING ROOFING LLC Parks-Prkng-San Review Valid Business License on Account Conditional Inspections Imported Conditional Final Insp Required Submissions Documents Resubmitted Action Items Hold Reason 2021 Conditional Flat Fee Formula Applicant is a Nonprofit?No Conditional Tiered Fee Formula Discount All Fees (%) Conditional Tiered SqFt Fee Formula Fee Discount Reason CO Status if Applicable Issued Queue Scoring Queue Designation 0 Queue Score 0 Milestone Current Days in City Hands 0 Last Date Received from Applicant Milestone - Total Days in Applicant Hand 0 Milestone - Total Days in City Hands 17 Dates 4/28/2021 Close/CO Issuance Date 6/30/2021 5/3/2021 Expiration Date 12/25/2021 5/3/2021 6/10/2021 Duration Remaining (Days)33 6/28/2021 Additional Information Description • Remove and properly dispose of the existing asphalt shingles to the plywood deck. • Inspect the existing decking for damage or deterioration. Replacement of damaged or deteriorated decking will be performed on a time and material basis. • Furnish and install full coverage High Temp Ice & Water Shield per manufacturers specifications. • Install Versashield membrane to provide Class “A” Fire Rated roof assembly per manufacturers specifications. • Furnish and install Drexel 22 Ga. Kynar Pre-finished 1.5” Snap Lock Standing Seam metal roofing and associated accessories per the manufacturer’s specifications. (Color to be Drexel Midnight Bronze) • Fabricate and install 24 Ga. Kynar pre-finished flashings per plans and manufacturers specifications. (Color to be Drexel Midnight Bronze) • Install 26’ of 6” Half-Round Gutters at entry eaves of Cabin per manufacturers specifications. (Color to be Drexel Midnight Bronze) • Install 24’ of Pre-finished steel 4” Round Downspouts per manufacturers specifications. (Color to be Drexel Midnight Bronze) • Furnish and install approx. 70 L.F. of heat tape in the gutters and downspouts per manufacturers specifications. • Additional heat tape has been added to accommodate for power source locations. Census Code RF - Roof Address Aspen Internal? Account Approved Covid-19 Plan Hold All Reviews Create Fees Create Fees 2 Re-Review All Reviews Price Book Milestone Current Days in Applicant Hand New Application Date Application Complete Date Application Accepted Date Override Expiration Date Issue Date Last Activity Date 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 2/10 • Price excludes required exterior circuits and wiring of the heat tape to J-boxes and/or controllers. • Install 26’ TRA 2-Pipe Snow Fence per roof plan and manufacturers specifications. This includes 1 row of snow fence at eaves of South entry side. Use of Building Single Family No Use Class Residential Job Location Address 619 N 4TH ST, ASPEN : 273512111004 Lot 16 Site Address Display on Map Legal Description Subdivision: HALLAM ADDITION Block: 99 Lot: 16 THRU:- Lot: 20 NORTH 44' OF SAID LOTS Historic Property?No Historic District?No HPC - Planning - Zoning Details Zone District R-6 HPC Certificate of Appropriateness?No Deed Restricted?No Roofing Project Details $24,624.00 5,500 Reason for Valuation Change 656 Scope of Work Details No No Located Within City Mall Boundaries?No Impacts City Trails/Parks?No Adjacent to City Open Space?No Building Description Code Editions 2015 IRC Energy Code Compliance Building Type (IRC)One family Fire Sprinkler Existing? Construction Type VB Fire Sprinkler Required? Occupancy Group (IBC) Fire Sprinkler Type Fire Alarms Installed? Financials $271.51 Total Payments $271.51 $72.41 Total Balance $0.00 System Information Created By Jacob Weems, 4/26/2021 6:37 AM Last Modified By Lilly Culver, 6/30/2021 11:37 AM Number 0026-2021-BROF VIP Form Tool VIP Submitted 4/28/2021 10:12 AM VIP Form Template Permit Application VIP Foreign Language VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":"a2E6A000000UwvKUAS","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Uwv {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] Action Items View/Print Permit Link Attachment Contacts JACOB WEEMS Account STORM KING ROOFING LLC Type Applicant Active Contractor License Count 1.00 Number 0035900 Account STORM KING ROOFING LLC Type Contractor Active Contractor License Count 1.00 Number 0035901 Requires Asbestos Test? Permit Comments Eden Address Valuation Lot Size Sq. Ft. Sq Ft of Building Work Area Affects Parking/Alleys/Loading?Work Affects Tree/Drip Line? Total Fees Fees Due at Current Status 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 3/10 Submissions Contact Sheet Signed.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required Site Plan.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required Alley Side Photo.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required Entry Photo.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required Asbestos Checklist Signed.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required Code__VersaShield_FireResistant_Roof_Deck_Protection__ICC_ESR2053 Marked Up.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required 619 N 4th Street Roof Assembly.pdf File Actions Submission Date 4/27/2021 2:10 PM Status Description Required 619 N 4th Street Roofing CMP.pdf File Actions Submission Date 4/27/2021 2:26 PM Status Description Required signed__Certification of HOA Compliance - 619 4th.pdf File Actions Submission Date 4/28/2021 10:10 AM Status Description Required signed__Valuation Affadavit.pdf File Actions Submission Date 4/28/2021 10:10 AM Status Description Required Covid Plan 619 N 4th Street Cabin.pdf File Actions Submission Date 4/28/2021 1:07 PM Status Description Required Roof-Reroof Checklist (PDF).pdf 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 4/10 File Actions Submission Date 5/3/2021 8:19 AM Status Description Required Milestones Review Round 1 - 0026-2021-BROF Status Approved Due Date Created Date 5/3/2021 Reviews REV-018500 Milestone Review Round 1 - 0026-2021-BROF Status Approved Type Building Due Date Completed Date 5/25/2021 9:29 AM Owner Alias JHahn On Hold Created Date 5/3/2021 REV-018501 Milestone Review Round 1 - 0026-2021-BROF Status Approved Type Engineering CMP Due Date Completed Date 5/3/2021 3:18 PM Owner Alias MHorv On Hold Created Date 5/3/2021 Inspections INS-0004210-21 Status Pass/Accepted Type Building - Midway Point Subtype Requested Date 6/22/2021 2:00 PM Scheduled Start Date 6/22/2021 Completed Date 6/23/2021 Owner Last Name Feder Permit Inspection Round Midpoint Inspection Closed TRUE INS-0004539-21 Status Pass/Accepted Type Building Subtype Final Building Requested Date 6/25/2021 2:45 PM Scheduled Start Date 6/25/2021 Completed Date 6/25/2021 Owner Last Name MILLER Permit Inspection Round Final Inspection Closed TRUE Fees 0059034 Type Use Tax Deposit - Pitkin County Amount $12.31 Waived/Refunded Amt Discount $ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0059035 Type Roof/Repair Con Mit Fee Amount $35.10 Waived/Refunded Amt Discount $ Amount Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0059036 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 5/10 Type Roofing Plan Review Amount $164.00 Waived/Refunded Amt Discount $ Amount Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart Paid in Full Fee Paid Date/Time 0059037 Type Roof/Repair Con Mit Fee Amount $35.10 Waived/Refunded Amt Discount $ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 0059038 Type Roofing & Re-Roofing Permit Fee Amount $25.00 Waived/Refunded Amt Discount $ Amount Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time Payments PY-009221 Related To 0026-2021-BROF Amount $72.41 Created Date 6/10/2021 Payment Source R-0008781 Receipt - Amount Remaining R-0008781: $0 PY-008736 Related To 0026-2021-BROF Amount $199.10 Created Date 5/3/2021 Payment Source R-0008365 Receipt - Amount Remaining R-0008365: $0 Activity History Email: Letter of Completion 619 N 4th St - 0026-2021-BROF - Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/30/2021 Days in Applicant's Hands Comments To: office@stormkingroof.com CC: BCC: Attachment: 619 N 4th St - 0026-2021-BROF _ LOC Final.pdf Subject: Letter of Completion 619 N 4th St - 0026-2021-BROF - Issued Body: Good Morning, Please find attached your issued Letter of Completion for the completed project at 619 N 4th St. If you have any questions please let us know. Kind regards, Lilly Culver Email: Building Permit 0026-2021-BROF - 619 N 4TH ST, ASPEN : 273512111004 - Issued Type Billable Assigned To Lisa Guida Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/10/2021 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 6/10 Days in Applicant's Hands Comments To: office@stormkingroof.com CC: BCC: Attachment: APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20210503.pdf, 619 N 4TH ST - 0026-2021-BROF - Issued.pdf Subject: Building Permit 0026-2021-BROF - 619 N 4TH ST, ASPEN : 273512111004 - Issued Body: Dear JACOB WEEMS, Please find attached your issued building permit 0026-2021-BROF for 619 N 4TH ST, ASPEN : 273512111004 and City use tax exemption letter & Covid-19 site safety plan approval notice (if applicable) Below is a link to your plans and information regarding inspections. Please print these 24x36 in color and keep them on site at all times. As a reminder these drop box links do expire so please download the plans as soon as you get them. https://www.dropbox.com/sh/ledto813umvjlzl/AADjm9qDDf2Y_LFvEZHYhRoza?dl=0 If you have any questions please let us know. Kind regards, Lisa Guida City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, and/or applicable building code regulations which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Permit Fees Due Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/25/2021 Days in Applicant's Hands Comments To: office@stormkingroof.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due Body: If you have not already paid the fees due on your permit 0026-2021-BROF, at 619 N 4TH ST, ASPEN : 273512111004 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Parking Reservation permits: Parking Department, 130 S Galena St, 1st Floor • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $72.41 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email: Permit Fees Due Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/30/2021 Days in Applicant's Hands Comments To: office@stormkingroof.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due Body: If you have not already paid the fees due on your permit 21-1014, at 619 N 4TH ST, ASPEN : 273512111004 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 7/10 If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Parking Reservation permits: Parking Department, 130 S Galena St, 1st Floor • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $199.10 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen, CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning and/or applicable building code regulations, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Your Building Permit Application Has Been Received... Here's What to Expect Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/29/2021 Days in Applicant's Hands Comments To: office@stormkingroof.com CC: BCC: Attachment: --none-- Subject: Your Building Permit Application Has Been Received... Here's What to Expect Body: Dear JACOB WEEMS: I have received your permit application. I will be your Permit Coordinator. The City of Aspen permit process works as follows: Completeness Review: I will be reviewing your permit application for completeness in the next 5 business days. I will follow up with you directly if I need any additional information. Submittal Fees: Once your permit is deemed complete, I will provide you with a list of all permit submittal fees that are due. Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review: Your permit will be placed in our review queue on the date that the submittal fee payment is received. Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval. You can see the status of all reviews by going into your permit on the portal, clicking on ‘Related,’ and scrolling down to ‘Reviews.’ Comment Response: Once you have addressed all agency comments, both in writing and on your plans, you will resubmit all documents via the portal. Just go into your permit, scroll down to the bottom of the page, and use the ‘Add more’ button. You must notify me when you have uploaded your files for me to know that you have resubmitted. You can use the portal’s Chatter feature (see below). Issuance: Once all agencies have approved your permit, you will be notified that it is time to pay your permit issuance fees. Once you do so, your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission. At that time, it will be put into the permit work queue. I may need to meet with you—either in person, over the phone, or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project’s scope. If you need to contact me about your permit, I encourage you to use the Chatter feature on your permit on the applicant portal. When you use Chatter, I get an email, but it also gets attached to the permit record in the back office. So, anyone looking at the permit can see the conversations. This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the ‘Share an update…’ box, type @, then start typing my name. My name will appear. Just click on it then add your message. Please let me know if you have any questions. Regards, Lauren Litchet City of Aspen Community Development 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 8/10 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning, and/or applicable building code regulations which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen, CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contain in the email are based on current zoning and/or applicable building code regulations, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/28/2021 Days in Applicant's Hands Comments Notes & Attachments 619 N 4th St - 0026-2021-BROF _ LOC Final Type File Last Modified Lilly Culver Description Download 619 N 4TH ST - 0026-2021-BROF - Issued Type File Last Modified Lisa Guida Description Download CMP Photo Type File Last Modified Jacob Weems Description Download Permit Application 2021-04-28 16:12:58.pdf Type File Last Modified Jacob Weems Description Download LOC_Letter__20210628.docx Type File Last Modified Lilly Culver Description Download Building_Permit__20210610.docx Type File Last Modified Lisa Guida Description Download APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20210503.pdf Type File Last Modified Mike Horvath Description Download Signature-Sign Below-0053s000002RcQlAAK-4/28/2021 10:12 AM.png Type Attachment Last Modified Jacob Weems Description View file Properties 0023235 Permit History 6/30/2021 11:37 AM User Lilly Culver Action Changed Status from Ready for Closure to Closed - Final. 6/28/2021 9:20 AM User Lilly Culver Action Changed Owner from Lauren Litchet to Lilly Culver. 6/28/2021 7:12 AM User MITCH MILLER Action Changed Status from Issued to Ready for Closure. 6/28/2021 7:11 AM User MITCH MILLER Action Changed Expiration Date from 12/22/2021 to 12/25/2021. 6/25/2021 7:12 AM 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 9/10 User MITCH MILLER Action Changed Expiration Date from 12/21/2021 to 12/22/2021. 6/24/2021 2:46 PM User Jacob Weems Action Changed Expiration Date from 12/20/2021 to 12/21/2021. 6/23/2021 7:18 AM User Steve Feder Action Changed Expiration Date from 12/19/2021 to 12/20/2021. 6/22/2021 7:30 AM User Steve Feder Action Changed Expiration Date from 12/18/2021 to 12/19/2021. 6/21/2021 2:10 PM User Jacob Weems Action Changed Expiration Date to 12/18/2021. 6/10/2021 9:38 AM User Lisa Guida Action Changed Issue Date to 6/10/2021. Changed Status from Ready for Issue to Issued. 6/10/2021 9:17 AM User Jacob Weems Action Changed Total Payments from $199.10 to $271.51. 5/25/2021 10:21 AM User Lilly Culver Action Changed Status from Final Review Complete to Ready for Issue. 5/25/2021 10:00 AM User Denis Murray Action Changed Status from Final Review to Final Review Complete. 5/25/2021 9:30 AM User Justin Hahn Action Changed Status from Permit Review to Final Review. 5/3/2021 9:56 AM User Lauren Litchet Action Changed Number from 21-1014 to 0026-2021-BROF. Changed Status from Complete Pending Submittal Fees to Permit Review. 5/3/2021 8:22 AM User Jacob Weems Action Changed Total Payments to $199.10. 4/30/2021 2:44 PM User Lauren Litchet Action Changed Status from Application Completeness Review to Complete Pending Submittal Fees. 4/30/2021 2:43 PM User Lauren Litchet Action Changed Total Fees to $271.51. Changed Create Fees from false to true. 4/30/2021 2:43 PM User Lauren Litchet Action Changed Status from New Application to Application Completeness Review. 4/29/2021 8:11 AM User Lauren Litchet Action Changed Owner from PC - Comm Dev to Lauren Litchet. 4/28/2021 10:12 AM User Jacob Weems Action Changed Owner from Jacob Weems to PC - Comm Dev. 4/28/2021 10:12 AM User Jacob Weems Action Changed Status from Draft Application to New Application. 4/26/2021 6:43 AM User Jacob Weems Action Changed Valuation to $24,624.00. 4/26/2021 6:37 AM User Jacob Weems Action Changed Bluebeam Project Id to 264-462-323. 11/22/21, 2:05 PM 0026-2021-BROF ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOVGW/p?retURL=/apex/DRE2_MUSW_Permit2_c?id=a034o00000FOVGW&sfdc.override=1 10/10 4/26/2021 6:37 AM User Jacob Weems Action Changed Number to 21-1014. Created. Copyright © 2000-2021 salesforce.com, inc. All rights reserved.