Ciry of Aspen Engineering Conrtmttion Management %an
•0000000192 I On Augurt 5, 201910:19 pm
First Name Tom Hegarry
last Name GZO Sheet Metal and Roofing
s Email gzol@comcastnet
s Phone 9703799977
IP Address 73.78.215.207
Score Obtained 90.0 out of 105.0 (85.7%)
Passed
Designation
You passed! Your Certificate is attached.
Please print and submit with your CMP.
Completion 8 minutes, 9 seconds
Time
Administrator processing
Remarks
User Account Guest
hUpSV/Cmpaspen.com/submission-
Link confirmed/!
id=e47ac2c81989bbd5516ada9162e5c94c
Section 1/4
CITY OF
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Correct answers are worth 5 points.
O
True
(Score 0)
Once a CMP is
approved, the she is
exempt from any
O
False
new orchanged
(Score 5)
regulations added
to the CMP
Score
ENObt
S s
tred/Iotat
a. Make contractors
O
jump through hoops
(Scoreo)
>
b. Have a document
stating how the
>
O
construction site will
mitigate its effect on
>
the neighborhood
(Score 5)
>
c. Make it more
The City requires a
O
diffculttedo
CMP in order to:
construction
(Score 0)
d. Have a document
that allows the
contractor do
O whatever it takes to
complete the
construction
(Score 0)
U Scare 5/5
Obtained/Total
The best description a. The contractor
of the City must do what the
enforcement policy O City tells him, no
for CMP issues is: matter what
(Score 0)
O b. The City will
always give a verbal
warning and a
correction notice
before Issuing a red
tag
(Score O)
CITY OF
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
c. The City will work
with Me contractor
to fix any issues, but
Q may issue a verbal
warning, correction
notice, or red tag
when appropriate.
(Scare 5)
d. The City will
N
automaticaity side
with neighbors in
any dispute
(Score 0)
Score
s
S
Obtained/roML
s
Section 2/4
g
TO Calculate
Add all square
disturbance area,
footage, interior a ad
s you must:
exterior, that wilt be
physically disturbed
O
by construction
activities, even if it is
to be revegetated
after construction
(Score 5)
Add all square
tentage, interior and
O exterior, that will be
finished with
impervious materials
(Score 0)
Add all square
footage within the
O footprint ofthe
house
(Score 0)
Add all square
footage of the
neighborhood that
O wilt be disturbed by
any parking, noise,
or fumes from Me
construction site
(Score 0)
n
CITY
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
i�
The project
Description should
be:
Public Notification
includes:
�+J Score 0/5
Obuined/ront
Be as short as
0 possible
(Score 0)
Provide an overview
of the construction
project including
background
information,
proposed
development type
and general
Q information, the
Proposed effect an
public utilities and
the extent of
excavation and
method of
stabilization
employed.
(Scare 5)
Include the contact
0 information
(Score 0)
Be at least 600
words and detail the
0 structural
engineering of the
building
(Score 0)
Score S/S
Obtained/rood
Notifying all
neighbors within
3O0'ofthe
construction site no
0 less than 10 days
prior to one start of
construction win a
project description
and schedule
(Score 0)
0 Updatingthe
neighborhood on a
monthly basis
(Score 0) n
Posting a protect
0 signinavisibte
location
(Score 0)
O Alloftheabove
(Score 5)
IScore
CITY
OFA
PEN
5/5Obtained/Total
7 AM - 5 PM Mon-
o
Sat
Overview
(Score 0)
Introduction
>
7 AM - 5 PM Mon-
o
Fri, 9-5 Sat
Paperwork
>
(Score 0)
Site and ROW
The Adowabte
>
Construction hours
0
9-5 Mon -Sun
are:
(Score 0)
Noise Suppression
>
Additional Requirements
O
7:30 AM-5:30 PM
Mon -Fri, 9.5 Sat
(Score 5)
Course Review
Final Exam
Score 5/5
Obtained/Total
Q
True
(Sore 0)
The work hours are
completety non-
0
False
flexible
(Scare Si
m
Score 0/5
Obtained/Total
O
True
Some holiday no
(Score 5)
work days are in
effect throughout
the entire City,
0
False
while some depend
(Score 0)
an where Me
construction site is
located
Score
5/5
Obouned/fotal
O
^
CITY OF
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Must maintain site
lines or provide
signage shoving
that neighboring
businesses are still
open
(Score 5)
Is allowed to
completely block
access to
O neighboring
businesses as long
as access is open
from the other side
(Score 0)
When working near
> other businesses, a Can work 24 Ins/day
construction sire: without City
> Oapproval if
neighboring
businesses are
> closed for offseason
(Score 0)
Should schedule
Large deliveries
during the
O
neighboring
businesses' large
sale events
(Stereo)
Score 5/5Obtained/Total.
Which sentence
Construction fence
best describes
must be at least 6-
construction
Q high chain link with
fencing as required
a mesh windscreen.
by the CMP?
(Score O)
An approved sound
fence can be used in
0 lieu of chain link
fence
(Score 0)
0 Depending on
construction
activities, a fence
may not have W
fully enclose the
n
CITY OF
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
entire property
(Score 01
O Alloftheabow
(Score 5)
Score
SR
Obtained/rotal
Section 5/4
b
Q
True
You must provide a
(Score 5)
copy of all
necessary drawings
with the CMP
O
False
> submittal even if
(Score 0)
the drawings are
> already in Me main
permitset
G
Score 5/S
>
Obtained/foral
>
Clearly marked
0
property line
(Score 0)
Construction and/or
0 sc u el fence Line
with access points
(Score 0)
Which of these
items is not
All neighbors within
necessary
O 300' names and
on a
general siteplan:
addresses
(Score 5)
Delivery, material
0 storage, and parking
areas
(Score 0)
V Score 5/5
Obtained/Total
If you have a site Turn in one site plan
where the Location Mat shows the first
of key elements 0 stage of the
such as access construction
points, storage (Score 0)
areas, and site
offices will change
throughout the 0
CIT
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Turn in a site plan
far each Week of the
construction
(Score 0)
Turn in a site plan to
cover each general
0 phase of the
construction construction
process you should: (Score 5)
ENDon't turn in a site
O plan because it WILL
always be changing
(Score0)
x U Score S/5
Obtained/rotal
Any time
x construction activity
O WILL block any part of
a street, sidewalk, or
x alley
(Score 0)
Any time materials
O
WILL be stored in City
ROW
(Score 0)
When is a
Temporary Right of
Way Encroachment
Any time traffic flow,
needed?
vehicular or
O
pedestrian, will be
effected by
construction activity
(Score 0)
O
ARoftheabove
(Score 5)
0,
Score
5/5
Obtained/rotat
When must you
Any time you WILL
depict the extent of
have arty suit
excavation and
stabilization (e.g.
detail any method
O
micropites, soil nails,
of stabilization to
layback six )as
be employed in your
part of your
CMP7
construction process
(Score 5)
n
Q Any time you will
have large piles of
dirt onsite for more
than 2 weeks
(Score 0)
Any time you will be
Q re -vegetating over Y4
an acre
(Score 0)
CITYOFASPEN Any time you will be
O storing dirt in the
Rightof Way
Overview (Score 0)
Introduction ? Score SR
Obtained/fotal
Paperwork
Section 4/4 A
Site and ROW s
Noise Suppression a o True
(Scare 0)
Additional Requirements All construction
sites are required to O False
have 24 hr noise (Score S)
Course Review monitoring.
Final Exam Score 5h
Obtained/rotal
Which statement O 65 db all year long
best describes the (Score 0)
noise limits for
construction in
Aspen? 70 db in the summer
throughout the city,
0 70 db in the winter
on the Mall, 80 db
a0 other times
(Score 5)
70 db in the
O summer, 80 db all
other times
(Score 0)
O 80 db AL year tong
(Score 0)
C+J Score 5/5
Obtained/roSal
CITY OFA$PEN
Overview
Introduction I >
paperwork >
Site and ROW >
Noise Suppression >
Additional Requirements
Course Review
Final Ez
Any neighbor within
300'requestsit
(Score 0)
Any type of
reinforced earth
O stabiliaaton wut be
A construction site performed
is required to have a (Score 5)
sound
engineer/consultant
model the site and There are 3 or more
specify noise Q houses within 300'
mitigation measures ofthe site
W keep the noise (Score 0)
below the atlowable
Limit when:
Over 400 square it
O ofthesitewiLLbe
disturbed
(Score 0)
Score 0/5Obtained/fonal
Which statement
ALL measurements
aboutconstruction
will be taken with
site noise
decibelreader on
measurement is not
O "Slow"response
true:
using the "A'
weighting scale
(Score 0)
An measurements
are taken from the
O property Line of the
construction site
(Swre 0)
At project inside a
muLtimnit building,
noise measurements
O will be taken from
the H. ceiling, or
floor of neighboring
units.
(Score 0)
ALL measurements
are taken from the
O 2nd floor of
neighboring house
(Score 5)
n
►
04,
CITY OFASPEN
Overview
Introduction
paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
U Score 5/5
Obtamed/rotat
Manufacturing
activities that are in
O excess of 80 db
require an Extended
Impact Permit
(Score 0)
Cutting stone is an
example of
Manufacturing
Which of the
Onshe
following
(Score 0)
statements about
Manufacturing
s Onsite are true:
ALL manufacturing
O
activities are limited
W a 90 day duration
s
(Score 0)
O
Alleftheabow
(Score 5)
U Score 5/5
Obtained/Fotal
Cer"cate
Information
Name j Tom Hagerty
ao $heat Metat
Company Name j and Roofing
Email Address = 9201®comuMnet
Phone Number Q 9705799977
3 PRINT
n
CITY OF
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam