Loading...
HomeMy WebLinkAboutFile Documents.222 Cleveland St.0181.2019 (11).ARBKCITY OF Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam 0 Print and Summary Ciry of Aspen Engineering Conrtmttion Management %an •0000000192 I On Augurt 5, 201910:19 pm First Name Tom Hegarry last Name GZO Sheet Metal and Roofing s Email gzol@comcastnet s Phone 9703799977 IP Address 73.78.215.207 Score Obtained 90.0 out of 105.0 (85.7%) Passed Designation You passed! Your Certificate is attached. Please print and submit with your CMP. Completion 8 minutes, 9 seconds Time Administrator processing Remarks User Account Guest hUpSV/Cmpaspen.com/submission- Link confirmed/! id=e47ac2c81989bbd5516ada9162e5c94c Section 1/4 CITY OF Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam Correct answers are worth 5 points. O True (Score 0) Once a CMP is approved, the she is exempt from any O False new orchanged (Score 5) regulations added to the CMP Score ENObt S s tred/Iotat a. Make contractors O jump through hoops (Scoreo) > b. Have a document stating how the > O construction site will mitigate its effect on > the neighborhood (Score 5) > c. Make it more The City requires a O diffculttedo CMP in order to: construction (Score 0) d. Have a document that allows the contractor do O whatever it takes to complete the construction (Score 0) U Scare 5/5 Obtained/Total The best description a. The contractor of the City must do what the enforcement policy O City tells him, no for CMP issues is: matter what (Score 0) O b. The City will always give a verbal warning and a correction notice before Issuing a red tag (Score O) CITY OF Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam c. The City will work with Me contractor to fix any issues, but Q may issue a verbal warning, correction notice, or red tag when appropriate. (Scare 5) d. The City will N automaticaity side with neighbors in any dispute (Score 0) Score s S Obtained/roML s Section 2/4 g TO Calculate Add all square disturbance area, footage, interior a ad s you must: exterior, that wilt be physically disturbed O by construction activities, even if it is to be revegetated after construction (Score 5) Add all square tentage, interior and O exterior, that will be finished with impervious materials (Score 0) Add all square footage within the O footprint ofthe house (Score 0) Add all square footage of the neighborhood that O wilt be disturbed by any parking, noise, or fumes from Me construction site (Score 0) n CITY Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam i� The project Description should be: Public Notification includes: �+J Score 0/5 Obuined/ront Be as short as 0 possible (Score 0) Provide an overview of the construction project including background information, proposed development type and general Q information, the Proposed effect an public utilities and the extent of excavation and method of stabilization employed. (Scare 5) Include the contact 0 information (Score 0) Be at least 600 words and detail the 0 structural engineering of the building (Score 0) Score S/S Obtained/rood Notifying all neighbors within 3O0'ofthe construction site no 0 less than 10 days prior to one start of construction win a project description and schedule (Score 0) 0 Updatingthe neighborhood on a monthly basis (Score 0) n Posting a protect 0 signinavisibte location (Score 0) O Alloftheabove (Score 5) IScore CITY OFA PEN 5/5Obtained/Total 7 AM - 5 PM Mon- o Sat Overview (Score 0) Introduction > 7 AM - 5 PM Mon- o Fri, 9-5 Sat Paperwork > (Score 0) Site and ROW The Adowabte > Construction hours 0 9-5 Mon -Sun are: (Score 0) Noise Suppression > Additional Requirements O 7:30 AM-5:30 PM Mon -Fri, 9.5 Sat (Score 5) Course Review Final Exam Score 5/5 Obtained/Total Q True (Sore 0) The work hours are completety non- 0 False flexible (Scare Si m Score 0/5 Obtained/Total O True Some holiday no (Score 5) work days are in effect throughout the entire City, 0 False while some depend (Score 0) an where Me construction site is located Score 5/5 Obouned/fotal O ^ CITY OF Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam Must maintain site lines or provide signage shoving that neighboring businesses are still open (Score 5) Is allowed to completely block access to O neighboring businesses as long as access is open from the other side (Score 0) When working near > other businesses, a Can work 24 Ins/day construction sire: without City > Oapproval if neighboring businesses are > closed for offseason (Score 0) Should schedule Large deliveries during the O neighboring businesses' large sale events (Stereo) Score 5/5Obtained/Total. Which sentence Construction fence best describes must be at least 6- construction Q high chain link with fencing as required a mesh windscreen. by the CMP? (Score O) An approved sound fence can be used in 0 lieu of chain link fence (Score 0) 0 Depending on construction activities, a fence may not have W fully enclose the n CITY OF Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam entire property (Score 01 O Alloftheabow (Score 5) Score SR Obtained/rotal Section 5/4 b Q True You must provide a (Score 5) copy of all necessary drawings with the CMP O False > submittal even if (Score 0) the drawings are > already in Me main permitset G Score 5/S > Obtained/foral > Clearly marked 0 property line (Score 0) Construction and/or 0 sc u el fence Line with access points (Score 0) Which of these items is not All neighbors within necessary O 300' names and on a general siteplan: addresses (Score 5) Delivery, material 0 storage, and parking areas (Score 0) V Score 5/5 Obtained/Total If you have a site Turn in one site plan where the Location Mat shows the first of key elements 0 stage of the such as access construction points, storage (Score 0) areas, and site offices will change throughout the 0 CIT Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam Turn in a site plan far each Week of the construction (Score 0) Turn in a site plan to cover each general 0 phase of the construction construction process you should: (Score 5) ENDon't turn in a site O plan because it WILL always be changing (Score0) x U Score S/5 Obtained/rotal Any time x construction activity O WILL block any part of a street, sidewalk, or x alley (Score 0) Any time materials O WILL be stored in City ROW (Score 0) When is a Temporary Right of Way Encroachment Any time traffic flow, needed? vehicular or O pedestrian, will be effected by construction activity (Score 0) O ARoftheabove (Score 5) 0, Score 5/5 Obtained/rotat When must you Any time you WILL depict the extent of have arty suit excavation and stabilization (e.g. detail any method O micropites, soil nails, of stabilization to layback six )as be employed in your part of your CMP7 construction process (Score 5) n Q Any time you will have large piles of dirt onsite for more than 2 weeks (Score 0) Any time you will be Q re -vegetating over Y4 an acre (Score 0) CITYOFASPEN Any time you will be O storing dirt in the Rightof Way Overview (Score 0) Introduction ? Score SR Obtained/fotal Paperwork Section 4/4 A Site and ROW s Noise Suppression a o True (Scare 0) Additional Requirements All construction sites are required to O False have 24 hr noise (Score S) Course Review monitoring. Final Exam Score 5h Obtained/rotal Which statement O 65 db all year long best describes the (Score 0) noise limits for construction in Aspen? 70 db in the summer throughout the city, 0 70 db in the winter on the Mall, 80 db a0 other times (Score 5) 70 db in the O summer, 80 db all other times (Score 0) O 80 db AL year tong (Score 0) C+J Score 5/5 Obtained/roSal CITY OFA$PEN Overview Introduction I > paperwork > Site and ROW > Noise Suppression > Additional Requirements Course Review Final Ez Any neighbor within 300'requestsit (Score 0) Any type of reinforced earth O stabiliaaton wut be A construction site performed is required to have a (Score 5) sound engineer/consultant model the site and There are 3 or more specify noise Q houses within 300' mitigation measures ofthe site W keep the noise (Score 0) below the atlowable Limit when: Over 400 square it O ofthesitewiLLbe disturbed (Score 0) Score 0/5Obtained/fonal Which statement ALL measurements aboutconstruction will be taken with site noise decibelreader on measurement is not O "Slow"response true: using the "A' weighting scale (Score 0) An measurements are taken from the O property Line of the construction site (Swre 0) At project inside a muLtimnit building, noise measurements O will be taken from the H. ceiling, or floor of neighboring units. (Score 0) ALL measurements are taken from the O 2nd floor of neighboring house (Score 5) n ► 04, CITY OFASPEN Overview Introduction paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam U Score 5/5 Obtamed/rotat Manufacturing activities that are in O excess of 80 db require an Extended Impact Permit (Score 0) Cutting stone is an example of Manufacturing Which of the Onshe following (Score 0) statements about Manufacturing s Onsite are true: ALL manufacturing O activities are limited W a 90 day duration s (Score 0) O Alleftheabow (Score 5) U Score 5/5 Obtained/Fotal Cer"cate Information Name j Tom Hagerty ao $heat Metat Company Name j and Roofing Email Address = 9201®comuMnet Phone Number Q 9705799977 3 PRINT n CITY OF Overview Introduction Paperwork Site and ROW Noise Suppression Additional Requirements Course Review Final Exam CITY OF ASPEN 130 S. Galena Street Aspen. CO 81611 Phone: 970.920.5000 Email: Email for Info Copyright 2019 City of Aspen Engineering I AR Rights NReserved i powered by Vick+Co n