Loading...
HomeMy WebLinkAboutFile Documents.993 Moore Dr.0192.2019 (19).ARBK Page 1 of 4 12/16/2019 P.O. Box 7627, Avon, CO 81620 | P: 970.306.4233 | F: 866.403.3485 | www.activeenergies.com Solar Installation Information Vendor: Active Energies Solar LLC PO Box 7627 Avon, CO 81620 (970-306-4233/info@activeenergies.com) Site: Harland Leeds Residence 993 Moore Drive Aspen, CO 81611 System Layout: Single Panel: 5.42ft tall X 3.25ft wide Panel Arrangement: 12 columns of 7 & 2 columns of 3 + 2 panels, oriented in the portrait position, mounted flush (rail-less) on the east facing garage roof, and 24 panels with RM5 ballast mounted in landscape on central flat roof, and 18 panels with RM5 ballast mounted in landscape on north flat roof HCE electric meter at SW corner of Garage with Production meter and disconnect co-located. Minimum Designed Temperature: -40°F Maximum Ambient Design Temperature: 140°F All AC wiring to be completed by project Colorado licensed master electrician All DC wiring to be overseen by NABCEP certified installer Calculations Inverters & Combo panel (located outside SW corner of External Disconnect & PV Meter Page 2 of 4 12/16/2019 P.O. Box 7627, Avon, CO 81620 | P: 970.306.4233 | F: 866.403.3485 | www.activeenergies.com 48.96kW System Size (STC) • 136 Solaria PowerXT all black solar panels @ 360 watts • 136 SolarEdge P370 Optimizers • 4 SolarEdge SE11400H-US inverters o Inverter 1 (4 strings of 12/12/9/9: 8-16 allowable) o Inverter 2 (3 strings of 10/10/10: 8-16 allowable) o Inverter 3 (3 strings of 10/10/10: 8-16 allowable) o Inverter 4 (3 strings of 12/11/11: 8-16 allowable) • Fixed array tilt angle: 7.18º, 5º • Array azimuth: 90º, 180º (where 180º is south) • Estimated annual power production: 65,429kWh Maximum PV System Voltage: 690.7 Voc = 47.7V/module 47.7V x 1 module = 47.7V No Temperature correction factor 690.7(A) Maximum PV Source Circuit (String) Current: 690.8 (A)(1) Isc = 9.56A 9.56A x 1.25 = 11.95A Maximum PV Output Circuit (Array) Current: 690.8 (A)(2) SE11400H-US inverter limit 30.5A combined string Inverter Output Circuit Current: 690.8 (A)(3) 47.5A @ 240V for SE11400H-US inverter Page 3 of 4 12/16/2019 P.O. Box 7627, Avon, CO 81620 | P: 970.306.4233 | F: 866.403.3485 | www.activeenergies.com Conductor Sizing Pass Thru Box from Optimizers to Inverter (combined strings per inverter): SE11400H-US inverter limit 30.5A combined string 30A x 1.25 = 38.1A #8 THHN-2 Table 310.16 55A (90ºC column, see note 240.4(D)) Conduit fill adjustment Table 310.15 (B)(3)(a) No Conduit Fill Adjustment Inverter to Combiner panel: SE11400H-US inverter Nameplate maximum continuous Output Current: 47.5A @ 240V 47.5A x 125% = 59.4A 210.19 (A)(1) #6 THWN-2 Table 310.16 65A (75°C Column) 60A 2pole breaker in panel No temperature correction factor No conduit fill adjustment Combiner panel to PV Production Meter: 4x 60A breakers in combiner panel (1 per inverter) 1x 250A main Breaker Nameplate maximum continuous Output Current: 59.4A x 3 = 178.2A @ 240V CU 250kcmil Table 310.16 255A (75°C Column) No temperature correction factor No conduit fill adjustment Overcurrent Protection Device 250A two pole breaker Per Manufacturer Specification Conductors may be oversized for voltage drop Page 4 of 4 12/16/2019 P.O. Box 7627, Avon, CO 81620 | P: 970.306.4233 | F: 866.403.3485 | www.activeenergies.com DC Grounding Electrode Conductorsolid bare #6 Cu, per NEC 250.66(C) Line Diagram Harland Leeds Residence 993 Moore Drive Aspen, CO 81611 48.96kW Utility Interactive Photovoltaic System Modules: 136 x Solaria PowerXT 360W Voc = 47.7V Isc = 9.56A Optimizers: 136 SolarEdge P370 Inverter 1 (3 strings of 12/12/18: 8-18 allowable) Inverter 2 (3 strings of 10/10/10: 8-18 allowable)Inverter 3 (3 strings of 10/10/10: 8-18 allowable)Inverter 4 (3 strings of 12/11/11: 8-18 allowable)Inverters: 4x SolarEdge 11400H-US Operating Voltage: 240V Operating Current: 30.5A Max System Voltage: 480V Max Output Current: 15.1A Tilt Angle: 7.18°, 5° Array Azimuth: 90°, 180° Production: 65,429kWh/yr Notes: - See Calculation Sheet for conductor sizing. - All conductors are copper unless otherwise noted. - Inverter listed (UL-1741) to de- energize upon loss of utility voltage per NEC 705.40. - Inverter has integral ground-fault protection per NEC 690.41 - 240V 1 Phase combiner Panel rating of 250A (bus rating 250 amp and 250A Main disconnect) to accommodate 4x 60A (PV) breakers - 1000A 240V 1 Phase Service - Load Side Tap for Power sources from installations per 2017 NEC 705.12(B)(2)(2) Array 1 12/12/9/9 4 Arrays 136 PowerXT 360w Solar Panels 136 SolarEdge P370 DC Optimizers 42/30/30/34 modules/optimizers per inverter 25 26 27 33...13 14 15 24... Net Meter On SW side of Garage ~5' 2" PVC/ EMT 3x 250 kcmil CU 1 #4 G THWN-2 SolarEdge SE11400H-US Inverter w/ Integrated Disconnect NEMA 3R Max AC Output: 47.5A @ 240V With ARC Fault Protection & Rapid Shutdown compliant – on SW exterior wall of Garage 3 inverters total Production Meter within 10' of net meter ~10' 1 1/4" PVC/ EMT 8 #6 THWN-2 1 #8 G THWN-2 60 A Combiner Panel – Co-Located w/ inverters 250A main breaker w/ 250A busbar 4x 60A breakers (1 for each inverter) 60 A 60 A 6 #10 PV Wire 1# 6G Bare Cu Conductors in Free Air 250A Fusible disconnect Array 2 10/10/10 1 2 3 12... 21 22 23 30...11 12 13 20... 1 2 3 10... 21 22 23 30...11 12 13 20... 1 2 3 ... Array 3 10/10/10 10 Inv.1 Inv.2 Inv.3 AC Disco adjacent to net meter ~100' 8/3 FMC w/ G 1000A main breaker w/ 1000A busbar TAP Internal MSP (garage) 6 #10 PV Wire1# 6G Bare Cu Conductors in Free Air 6 #10 PV Wire 1# 6G Bare CuConductors in Free Air ~65' 8/3 FMC w/ G ~65'8/3 FMC w/ G 34 35 36 42... CT Net meter, exterior, on pedestal 60 A 24 25 26 34...13 14 15 23... 1 2 3 ... Array 4 12/11/11 12 Inv.46 #10 PV Wire 1# 6G Bare Cu Conductors in Free Air ~65' 8/3 FMC w/ G ~5' 2" PVC/ EMT 3x 250 kcmil CU 1 #4 G THWN-2 ~5' 2" PVC/ EMT 3x 250 kcmil CU 1 #4 G THWN-2