Loading...
HomeMy WebLinkAboutFile Documents.993 Moore Dr.0192.2019.ARBK993Moore_BuildingComments_1 Page: A-123 - MAIN LEVEL FLOOR PLAN -NORTH File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Author: bonniem Subject: PlanCheck Color: Provide specifications for a pool and spa cover listed as ASTM F1346 or revise to show an enclosure barrier per 2015 ISPSC 305. PlanSet.Architecture.993MooreDrive.2017.12.pdf (3) Page: A-503 - TYPICAL WALL ASSEMBLIES File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Author: bonniem Subject: PlanCheck Color: R10 continuous + R10 spray cavity insulation is shown at detail W2. Minimum basement wall value per Table R402.1.2 is R15 continuous or R19 cavity or a combination of R10 continuous and R13 cavity. Page: A-601 - DOOR SCHEDULE File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Author: bonniem Subject: PlanCheck Color: Maximum U-value is .28 per Ordinance 40, 2016. Correct at Exterior Door & Window Notes on A601-603. Page: M.0.001 - MECHANICAL LEGEND & SPEC'S File Name: PlanSet.Mechanical.993MooreDrive.2017.12.pdf Author: bonniem Subject: PlanCheck Color: Balanced mechanical ventilation with simultaneous outdoor airflow and exhaust airflow within 20% of each other is required per Ordinance 40, 2016. Provide additional clarification on how this requirement is to be met. PlanSet.Mechanical.993MooreDrive.2017.12.pdf (1) Page: S-600 - POOL PLAN AND DETAILS File Name: PlanSet.Structure.993MooreDrive.2017.12.pdf Author: bonniem Subject: PlanCheck Color: Provide additional detail on the proposed pool structure. Clarify how vertical and lateral support is to be provided to resist settlement on the slope. R403.1.7.2 PlanSet.Structure.993MooreDrive.2017.12.pdf (1) 1A-301 2 3 4 BREAKFAST105TL - 01 KITCHEN104TL - 01 OUTDOOR LIVING109TL - 03 OUTDOOR LOUNGE110TL - 03 PANTRY103TL - 01 DINING111TL - 01 LIVING112TL - 01 4A-321 2A-322 W11W11 W10W10 W10 1A-3022A-3023A-302 5 112B 112A111B 111A 105B A 112.1 40'-8 1/4"23'-4 1/2"21'-11 1/4"15'-0"17'- 22'-9 1/4" 3'-0" 3 1/2"9'-10"3 1/2"4'-6 7/8"35'-2 7/8"11'-0"6'-2"2'-3 1/4"11'-8 1/4 "5 1/2"9'-6"2'-2"2'-5"5 1/2"2'-1 1/2"4'-1"5 1/2"8 1/4"7'-2 1/2"5 1/2"9'-0"1/2"W10 W10 1A-324 A-4221 A-4211 HOT TUB POOL SLOPE1/4":1'-0"FLUE & AIR INTAKE FOR REC. RM. FIREPLACE BELOW ROOF ABOVE ROOF ABOVE 2'-8 7/8"5'-4"5'-4" BUILT 4'-8 5/256" EGRESS WELL HATCH REQ' LESS THAN 15LBS OF FORCE TO OPEN EQ EQ EQRADON CONTROL SYSTEM TRENCH DRAIN RE: SHEET A-111 F Provide specificationsfor a pool and spacover listed as ASTMF1346 or revise toshow an enclosurebarrier per 2015ISPSC 305. RE: STRUCT EXT CONC. FND. WALL (RE: STRUCT.) FND. WATERPROOFING CRAWL COMPACTED FILL OR GRAVEL(RE: STRUCT.) CONTINUOUS OR R-19 CAVITY REQ'D) R19 BATT INSULATION VAPOR BARRIER R10 FND. INSULATION FILTER FABRIC FND. DRAINAGE BOARD R13 RE: STRUCT.1/2" U.N.O. 3 1/2" CONC. FND. WALL (RE: STRUCT.) FND. WATERPROOFING R10 FND. INSULATION FILTER FABRIC EXT COMPACTED FILL OR GRAVEL(RE: STRUCT.) R19 POLYURETHANE SPRAYFOAM INSULATION 5/8" TYPE 'X' GWB FINISH (RE: SCHEDULE) (R15 CONTINUOUS OR R-19 CAVITY REQ'D) 1/2" GAP BTW CONC. AND WD. FURRING FURRING INT FND. DRAINAGE BOARD R10 3" = 1'-0"W1 TYP. FND WALL 3" = 1'-0"W6 TYP. INT CONC. WALL @ CRAWL SPACEINING WALL 3" = 1'-0"W5 MTL PANEL FND WALL @ 3" = 1'-0"W2 TYP. FND WALL @ CONDITIONED SPACE R10 continuous + R10spray cavity insulation is shown at detail W2.Minimum basementwall value per Table R402.1.2 is R15 continuous or R19cavity or acombination of R10 continuous and R13 cavity.EEDS RESIDENCEEXTERIOR DOOR & WINDOW NOTES 1 FOR GENERAL NOTES SEE COVER SHEET. 2 ALL EXTERIOR DOORS AND WINDOWS BY LOEWEN, U.N.O. 3 RE: SPECS FOR ADDITIONAL INFORMATION. 4 ALL DIMENSIONS SHOWN ARE FOR FRAME SIZE, U.N.O.5 RE: DETAILS AND/OR SHOP DRAWINGS FOR FRAME SIZE AND ROUGH OPENING DIMENSIONS. 6 ALL DIMENSIONS AND MOTOR LOCATIONS TO BE VERIFIED IN SHOP DRAWINGS. 7 U-VALUE FOR ALL GLASS 0.3, U.N.O. 8 ALL GLASS WINDOWS AND DOORS TO INCLUDE NFRC STICKERS. 9 ALL WINDOWS & DOORS TO BE SAFETY GLAZED Maximum U-value is .28 per Ordinance 40, 2016. Correct atExterior Door & Window Notes onA601-603. AB PIPE EXPANSION GUIDE PIPE UNION PIPE ANCHOR FLEXIBLE PIPE CONNECTION PIPE EXPANSION JOINT POINT OF NEW CONNECTION AIR VENT PLUG VALVE CHECK VALVE BALL VALVE BALANCING VALVE BUTTERFLY VALVE PRESSURE REDUCING VALVE STRAINER PRESSURE - TEMP. TAP PRESSURE GAUGE 2-WAY CONTROL VALVE 3-WAY CONTROL VALVE FIRE DAMPER MOTOR OPERATED DA MANUAL BALANCING D TURNING VANES IN 90 ??x??DUCT SIZES ARE NET 1ST NO. IS DUCT WIDT 2ND NO. IS DUCT DEP SECTION THRU SUPPL SECTION THRU RETUR SUPPLY DUCT TURN D RETURN/EXHAUST DU CHANGE OF ELEVATIO FLEXIBLE DUCT CONN R/D (D) DROP (R) RISE SUPPLY REGISTER/DI NECK SIZECFM-S RETURN REGISTER/D NECK SIZECFM-R OUTSIDE AIR REGISTE NECK SIZECFM-O.A. EXHAUST REGISTER/D NECK SIZECFM-E U DOOR UNDERCUT CFM (A) SECTION CUT LINE(B) SHEET SHOWN ON SECTION THRU ROUN ROUND DUCT TURN D 4-WAY CONTROL VALVE FLOW REGULATOR VALVE DIFFERENTIAL BYPASS VALVE NATURAL GAS PRESSURE REGULATOR THERMOMETER MS SHALL BE BRAZED WITH 15% SILL FLOSS. PURGE PIPING WITH D INSULATION SADDLES AS REQUIRED AND PER ANSIAND WIRE ARE NOT ACCEPTABLE. SCHEMATIC ONLY. SIZE PIPING AND DESIGN THE ACTUAL PIPINGUBLE RISERS, SPECIALTIES, AND PIPE AND TUBE SIZES, TO ENSURE NCE WITH WARRANTIES OF CONNECTED EQUIPMENT. NT SYSTEM WITH A VACUUM PUMP TO A VACUUM OF 500 HOURS PRIOR TO CHARGING. ED CONSISTENT WITH THE REQUIREMENTS PER SECTION 604 OF COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25T MORE THAN 50, PER SECTION 604.3 OF THE 2015 IMC. DANCE WITH IMC REQUIREMENTS. TRANSFER DUCTWORK SHALL BE INTERNALLY LINED WITH A VAPOR ESSES SPECIFIED BELOW. OVAL & OUTDOOR AIR DUCTS SHALL BE EXTERNALLY WRAPPED H AN EXTERNAL VAPOR BARRIER. REQUIRED R-VALUES ARE DUCTWORK LOCATED WITHIN THE BUILDING ENVELOPE SHALL BE” LINER) UNLESS SPECIFIED OTHERWISE ON THE PLANS.N ATTICS OR OTHER UNCONDITIONED SPACES SHALL BE” LINER). ALL OTHER DUCTS IN UNCONDITIONED SPACES SHALL BE -1/2” LINER) E INSULATED TO A MINIMUM OF R-6 WITH A VAPOR BARRIER. E WRAPPED WITH 2” THICK INSULATION AND WEATHERPROOFED. SULATED CONSISTENT WITH THE REQUIREMENTS PER SECTION E FIBERGLASS INSULATION WITH VAPOR BARRIER, WHEREVERLD TAPED ALONG BOTH LONGITUDINAL AND RADIAL SEAMS. CEPTABLE. COMPLIANCE WITH A FLAME-SPREAD INDEX NOT MORE THAN 25 T MORE THAN 450, PER SECTION 1204 OF THE 2015 IMC. DANCE WITH IMC REQUIREMENTS.SULATED TO A MINIMUM OF R-3.AB UNDERGROUND SHALL BE TYPE "k" COPPER AND SHALL BESULATION. ND-ALONE CONTROLS CAPABLE OF MEETING THE SEQUENCE OF M.7.001. IDED WITH 7-DAY PROGRAMMABLE AUTOMATIC SPACE (THERMOSTATS) AS SHOWN ON THE PLANS. THE THERMOSTATSG OCCUPANCIES AND PROVIDING SETBACK CAPABILITIES TOTO 55°F OR UP TO 85°F.PROVIDING A DEADBAND OF AT LEAST 5°F BETWEEN HEATING AND RIC SET POINTS IN °F, ADJUSTABLE SETPOINT STOPS, AND SHALL BELOOR ADJACENT TO THE ROOM'S LIGHT SWITCH. H CONTROLS CONTRACTOR AS NECESSARY. OVED BY THE OWNER. NDER ALL SNOWMELT AREAS, MINIMUM R-10. CONFIRMREQUIREMENTS WITH THE STRUCTURAL ENGINEER FOR EACHTRAFFIC AREAS MUST BE TRAFFIC RATED. BUBBLE-TYPELY. NDER ALL RADIANT AREAS, ACCORDING TO CODE AND/OR UTING, DISTANCE AND TERMINATION LOCATIONS SHALL COMPLYION INSTRUCTIONS AND ALL REQUIREMENTS IN CHAPTER 8 OF THEPTED FOR BOILER OR WATER HEATER VENTING. POLYPROPYLENESE WITH APPLIANCE MANUFACTURER. CPVC MUST COMPLY WITH 25.PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED, AND A MINIMUM OF 30" CLEAR WORKING SPACE INFRONT OF ACCESS PANELS TO THE COMPRESSOR, BLOWER ASSEMBLY AND AIR FILTER SECTION OF THEEQUIPMENT SHALL BE PROVIDED BY GENERAL CONTRACTOR. 26.ALL EQUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE WITH CODE APPROVED VIBRATION ISOLATORS. 27.EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND RE-ADJUSTED TO INSURE PROPERFUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, ADEQUACY OF FLOWS AND CAPACITIES,ELIMINATION OF NOISE AND VIBRATION, AND SHALL BE LEFT IN PROPER OPERATING CONDITION. 28.TEST & BALANCING:a.THE ENTIRE HEATING AND VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT CERTIFIED TEST AND BALANCE COMPANY. b.5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ELECTRONIC DISTRIBUTION PREFERRED. c.ALL REQUIRED RE-SHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE MADE BY THE TEST & BALANCE CONTRACTOR.d.ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10% OF THOSE INDICATED ON THE PLANS. 29.FINAL LOCATION OF GRILLES, REGISTERS & DIFFUSERS SHALL BE PER THE ARCHITECTURAL PLANS,ELEVATIONS OR AS PER FIELD REQUIREMENTS (UPON ACCEPTANCE BY ARCHITECT). 30.THE GENERAL CONTRACTOR SHALL FURNISH & INSTALL ALL OF THE REQUIRED ACCESS PANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE EQUIPMENT. EQUIPMENT WITH MANUFACTURER MANDATED SERVICE REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 20 FEET FROM AN ACCESS PANEL. 31.ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S INSTALLATION, OPERATION &MAINTENANCE MANUAL'S RECOMMENDATIONS ESPECIALLY FOR SERVICE CLEARANCES. 32.FILTERS: a.SHALL BE UL RATED AND APPROVED. b.PRESSURE DROPS SHALL NOT EXCEED .10" STATIC PRESSURE. 33.ELECTRICAL CONNECTIONS:a.UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, THERMAL OVERLOADS, LOWVOLTAGE THERMOSTATS, CONTROL RELAYS, CONTROL TRANSFORMERS AND SOLENOID VALVESSHALL BY FURNISHED BY THE MECHANICAL CONTRACTOR.b.UNLESS OTHERWISE SPECIFIED, ALL MOTORIZED DAMPERS SHALL BE LOW VOLTAGE. ALL WIRING ANDPOWER CONNECTIONS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. c.PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT CHARACTERISTICS INDICATED ON THE DRAWINGS. d.IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER THE CONTRACT DOCUMENTS.e.COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER, REGARDLESS OF VOLTAGE, WITHOTHER TRADES, SO THAT ALL SYSTEMS ARE COMPLETE AND OPERATIONAL.f.ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS PROTECTION.g.ALL SINGLE AND THREE PHASE MOTORS, STARTERS AND DISCONNECTS PROVIDED BY MECHANICALCONTRACTOR AND WIRED BY THE ELECTRICAL CONTRACTOR. 34.ACOUSTICAL COMPLIANCE a.AEC IS NOT ABLE TO PROVIDE ACOUSTICAL MODELING OF EXTERIOR EQUIPMENT, NOR PROVIDE DOCUMENTATION SUPPORTING COMPLIANCE WITH THE CITY OF ASPEN NOISE ORDINANCE. ANACOUSTICAL CONSULTANT IS RECOMMENDED TO VERIFY COMPLIANCE. NOISE MITIGATION MEASURES(BY OTHERS) MAY BE REQUIRED. 35.TEMPORARY HEATING DURING CONSTRUCTION:a.MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY HEATING. b.GAS FIRED TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. ALL HEATING AND COOLING MODELING WAS P WITH WINDOWS WITH A SHADING COEFFICIEN IF THE ACTUAL WINDOW SC EXCEEDS THIS VA DEFICIENCIES COULD EXIST. Balanced mechanicalventilation withsimultaneous outdoorairflow and exhaustairflow within 20% ofeach other is requiredper Ordinance 40,2016. Provideadditional clarificationon how thisrequirement is to bemet. 2 3 F 23'-4 1/2"11'-10 1/2"7'-11"6'-6"13'-10"HOT TUB POOL 99'-5"WALL, TYP10" CONC91'-9" TYP1'-0" T/CONCTYP UNO T/FTG 12" DEEP CONC FTG BEGIN SOG TAPER 8S-403 KL A, Inc.&Structural Engineers and Builders215 North 12th Street, Unit ECarbondale, Colorado 81623P: (970) 927 5174 F: (970) 927 5194 Buffalo, WY ○ Carbondale, CO ○ Denver, CO ○ Golden, CO ○ Loveland, CO SCALE: © 2017 KL&A, INC DRAWN BY:CHECKED BY: PROJECT NUMBER: ISSUE: HISTORY: STAMP PER DISCIPLINE 1/4" = 1'-0" POOL PLANAND DETAILS S-600 JML B0464 PERMIT SUBMITTAL 12/12/17 DPD 1/4" = 1'-0"1 POOL FOUNDATION PLAN DATE ISSUE 32 of 32 Provide additionaldetail on the proposedpool structure. Clarifyhow vertical andlateral support is to beprovided to resistsettlement on theslope. R403.1.7.2 Page: 1 File Name: Special Inspection Signature Sheet 12-22-17.pdf Author: bonniem Subject: PlanCheck Color: A fabricator will need to be identified and sign the form prior to permit issuance Special Inspection Signature Sheet 12-22-17.pdf (1) A fabricator will need to be identified and sign the form prior to permit issuance