HomeMy WebLinkAboutFile Documents.993 Moore Dr.0192.2019 (54).ARBKask]um111HUNIHy i
R\Dial .•]YCv
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
A
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
countertops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature:
Owner Printed Name:
Date:
or, S1atL.,� i�G
Authorized Agent Signature:
Authorized Agent Printed Name: s�..c.lE cirns
CO 81
DIVISION TOTAL BUDGET
DIVISION 1 GENERAL CONDITIONS $1,003,934
DIVISION 2 SITE CONSTRUCTION $774,878
DIVISION 3 CONCRETE $506,773
DIVISION 4 MASONRY $33,053
DIVISION 5 METALS $401,793
DIVISION 6 WOOD AND PLASTICS $981,132
DIVISION 7 THERMAL/MOISTURE PROTECTION $484,517
DIVISION 8 DOORS & WINDOWS $546,568
DIVISION 9 FINISHES $848,716
DIVISION 10 SPECIALTIES $182,430
DIVISION 11 EQUIPMENT $594,178
DIVISION 13 SAUNA, POOL & SPA $272,140
DIVISION 15 MECHANICAL $1,304,753
DIVISION 16 ELECTRICAL $527,720
SUBTOTAL $8,462,585
CONTRACTOR'S P&O @ 9.5%$803,946
TOTAL COST $9,266,531
HARLAND LEEDS RESIDENCE
Preliminary Budget dated 11-17-17
based on 21 month duration
993 Moore Drive, Aspen CO 81611