Loading...
HomeMy WebLinkAboutFile Documents.993 Moore Dr.0192.2019 (28).ARBKWoody Creek Engineering, LLC PO Box 575 Woody Creek, CO 81656 970.429.8297 (o) 970.309.7130 (c) 993 Moore Drive MEMO Asbuilt Drainage 20210308 Memorandum To: Engineering Staff From: Josh Rice, P.E. CC: WCE Project Number: 0049 Date: March 8, 2021 Re: 993 Moore As-built Drainage Analysis The drainage system was generally built per plan except for a portion of Pipe A (Southern Main), and a portion of Pipe B (Western Main), the North Silva Cell Outlet and the East Silva Cell Outlet. We have analyzed Pipe A and Pipe B minimum conveyance capacities versus required capacities. The as-built drainage system operates as designed. 1. Pipe A Capacity: Pipe A was designed with a minimum slope of 2%. All of Pipe A meets the requirements except for the short run of pipe from Inlet 2 to the main. This section of pipe has a slope of 1.75%. The only inflow to the pipe is from Inlet 2. Per the approved report, Inlet 2 captures 0.005 cfs of run- off. The minimum pipe slope as depicted by the as-built survey is a 4” PVC @ 1.75% (see Fig- ure 1 for calculation). The pipe has a carrying capacity of 0.346 cfs when flowing 80% full. 2. Pipe B Capacity: Pipe B was designed with a minimum slope of 2%. The total runoff conveyed by Pipe B is 2.652 cfs. The minimum pipe slope as depicted by the as-built survey is a 10” PVC @ 1.17% (see Fig- ure 2 for calculation). The pipe has a carrying capacity of 3.31 cfs when flowing 80% full. 1/11/20183/9/2021 Page 2 March 8, 2021 Re: 993 Moore Drive As-built Drainage Analysis 993 Moore Drive MEMO Asbuilt Drainage 20210308 Figure 1. Pipe A Capacity Page 3 March 8, 2021 Re: 993 Moore Drive As-built Drainage Analysis 993 Moore Drive MEMO Asbuilt Drainage 20210308 Figure 2. Pipe A Capacity