HomeMy WebLinkAboutFile Documents.800 E Hopkins Ave.0070-2021-BRES (4)ADDRESS: 640 Z�- / P(c-Q-)s A/ 14q PERMITNUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEEToFN
OR PIDIN REVIEW QUESTIONS
Name �%�//` Lazso Phone y/n f �ry-�/o7() E-man SAw /bN�:/uc. came
FOR INSPECTION
Name C'2//r F}11..50nI Phone E-mail r
OWNER
Name ,{kt,,,r4cs 44 LP— -/%(*J4-. ph., cell phone iiid".-fa/'%'-QT�O
r
As landingpI Auref/ars tit -4a state 20 MP i9l('11
Add°e'ss&LA nt.A-9 m r
Name_ E79)K 2727F& Phone Call Plane (®/63. Si 10
_ _
Armes p0 �� 877 tin 6,tta/i
irkzn�OeiKfsnte dlGca
t ZIP
nadare'ss 50W ho/Bc:/ 19 COmOQ4A,
APPLICATION BOq (ON IACT
Name , [CRR✓ Phone ten Phone 970
.a.Ians AE•O.IG an —stark— ZIP
nadare'sa FYBCKE
ARCHITEcr OR DESIGNER OF RECORD
Name 41 Phone Cell phone
A8tl"e
un ware zlv
A24Address
Name K 1- Phone Call Phone
Ademe
City shi ZIP
E mail
Address
STRUCTUAL ENGJNEER OF RECORD
Name AIM PM1one - Call Pbnne
Addrei City state ZIP
Email
Adtlress
GENERAL CONTRACTOR
Name it/ICL�iL60�t)- soNS .3Jna' R$FviAG Plem, fNrpMne
m `CPU nPB/G0a
Aeare.: �D atr/i- clw C��.+1a'Apfiz�96s state
Ndd�e'ss sgw%iO/5'e./l/G n.
I hereby certify that l have read and examined this application and know the same to be true and correct All provisions of laws and ordinances
governingthlstype of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate
or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the
approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applica tale codes.
Additionally, I understand that I am responsible for ensuring that all sub -permits associated wtth my project are submitted to the City in compliance
with the approved Master plan set. I understand that the City does not review subyermits for compliance with the master plan set
Carl--"
y i�-a�
Date
❑ Check if you area tested owner builder (single-family homes only). you must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by: Date: - Affidavit on file
CITY
OF
ASPENDclnher:DgD
130 S. GALENA
ST
I ASPEN
CO 81611
1.
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFIDAVIT
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspenare required to includes certification of
compliance with building permit valuation requirements.. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a. permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical,. plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time.
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuationis underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings,tile, cabinets and
countertops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting; tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is public document.
Owner Signature: Date:
Owner Printed Name:
or,
Authorized Agent Signature: Date:
Authorized Agent. Printed Name: 15�ROe-F{"2Sa�
CITY
OF ASPEN,a�.,,,,o,9
130 S. GALENA
ST
I ASPEN
CO 81611
ADDRESS&a2a-- � 4�4 PERMITNUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT °#
ASBESTOS VERIFICATION AND CHECKLIST «n�Pu 9N
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the airfor days,
weeks, or even months before settling out of theair. The fiberscan easilybecome airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos maycause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airbome asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1999 "ban" an asbestos -containing materials Is commonly misundersno ml. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule" and remanded it to the EPA. Thus, much of the original 1989 EPA ban
on the U.S.. manufacturing, importation, processing, or distribution in commerce of many asbestos -containing product categories was
set aside d DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above theantrigger levels contains asbestos.
ASBESTOS CHECKLIST '..
❑Yes❑No
Residential: Will you be removing more than 32 sq it, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes[No
Commercial: Will you beremoving more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials,. etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOntme, or http://w .cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies.. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:.
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app; their. issuedpermit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information Is true and complete.
Owner'4/0wn''r '9rd 2-GE'. .Phone# /a? -B(o7—Sd�fo
Applicant (print name) zeAle y�ncsoern� a Phone# g70-6/8-9,626
Applicant Signature �-�-X' < Date
Please call the. City ofAspen Environmental Health Department at 920-5039 atanytime if you have questions
about asbestos, interpreting yourtest results, or other matters.
CITY OF ASPENAueast2017 130 S. GALENA ST I ASPEN CO 81611
ADDRESS: E. PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT s
ZONING COMPLIANCE VERIFICATION POLICY o= sptn
Applicability: All development projects must comply with the City's zoning regulations, including. height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi -family, lodging, and mixed -use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway. -
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the processto still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the.
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer...
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location. of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured andif natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and. general
contractor, with a written description of the measurementmethods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building. envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathingor weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showinglocation of measurements may be necessary.
CITY OF ASPENa,--g 130 S. GALENA ST I ASPEN CO 81611
PERMIT NUMBER: ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT
sit r
ZONING COMPLIANCE VERIFICATION POLICY
CIMOrASPEN
4-Plans and elevations mustinclude height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set..
7-The report must include the signature,date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.,
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shownon the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to. verify zoning compliance, which may include but is not
limited to additional survey work or a. site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical inthe
construction process to minimize disruption to the construction schedule.
Acknowledgment:
6RUF ZA,6Sr)rtI
I (contractor name) / 64P. t , understand this policy. I. agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. l understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature:
Date:.
CITY OF
ASPEN,.,,,-,
130 S. GALENA
ST
I ASPEN
CO 81611