Loading...
HomeMy WebLinkAboutFile Documents.210 N Mill St.0016-2019-BROFFax To:Tyler Music Company:ABC SUPPLY Co #481 17808 E24th Dr Aurora, CO 80011 Phone #:806-374-7709 Fax #:806-374-1202 Contractor: General Project Information: Date Quoted: Revised: Job Name: Location: Job #: Tapered System Description:Cricket System Description: Taper Material: ISO - 20 PSI (4' x 4')Cricket Material: ISO - 20 PSI (4' x 4') Tapered Area (sq): 55.5 Cricket Area (sq): 7.8 Taper Slope: 1/4"/ft Cricket Slope: 1/2"/ft Taper Fill: ISO - 20 PSI (4' x 4')Cricket Fill: ISO - 20 PSI (4' x 4') Minimum Start: 1/2"Minimum Start: 1/2" Maximum Thick: 6 3/4"Maximum Thick: 4 1/4" Base Layer: BASE LAYER NOT INCLUDED IN QUANTITIES OR PRICE Overlay: OVERLAY NOT INCLUDED IN QUANTITIES OR PRICE Non Taper Area (sq): 0 Total ISO Truckloads:0.60 Avg. R-Value:19.50 Total PERLITE Truckloads:0.00 Total Sqs. Applied: 119.46 *Price: Total Sqs. Material: 131.04 Valid if shipped by:11/16/2019 *Price does not include tax or fuel surcharge (if applicable) Notes: 10/17/19 10/17/2019 GH-1289238-X1 Aspen, CO 210 N Mill St $8,566.00 CONTRACTOR APPROVALS.ALL SUBMITTALS ARE SUBJECT TO ARCHITECT / -s DESIGN INTENT IMAGE SHOWN ABOVE REFLECTS ABC' IMPORTANT - As a supplier of materials only, ABC Supply Co. does not assume responsibility for errors in design, engineering, quantities or dimensions. Architect and/or contractor shall verify all drain locations, perimeter dimensions, sizes, materials and R-values. Contractor is responsible for verifying this quote to insure that it meets job specifications. All shop drawings must be approved prior to material shipment. 3 Floridian Dr Erlanger, KY 41018-1330 Ph / 800-577-1222 (ext. 223 Fax / 866-389-0866 HuttonGlennProject Manager: E-Mail: glenn.hutton@abcsupply.com (Page 1 of 2) Taper Slope: Contractor:0 Minimum: Contractor Approval: Maximum: Full Size Drawing/Qty: Cricket Slope: Fax Drawing: GH-1289238-X1 210 N Mill St 1/4"/ft 1/2" Aspen, CO 6 3/4" 1/2"/ft Sumps, Base Layers and/or Overlays are NOT included in this quote. (unless noted otherwise) CONTRACTOR APPROVALS.ALL SUBMITTALS ARE SUBJECT TO ARCHITECT / -s DESIGN INTENT IMAGE SHOWN ABOVE REFLECTS ABC' IMPORTANT - As a supplier of materials only, ABC Supply Co. does not assume responsibility for errors in design, engineering, quantities or dimensions. Architect and/or contractor shall verify all drain locations, perimeter dimensions, sizes, materials and R-values. Contractor is responsible for verifying this quote to insure that it meets job specifications. All shop drawings must be approved prior to material shipment. (Page 2 of 2)