Loading...
HomeMy WebLinkAboutFile Documents.722 Midland Park Pl.0146.2019 (17).ARBKWIP 300HT High-Temperature Protection Self-Adhering Roofi ng Underlayment WIP 300HT is a high-tensile-strength rubberized asphalt underlayment specifi cally designed to withstand temperatures up to 250°F (121°C). Ideal for use under metal including copper, zinc and COR-TEN® (consult technical department for installation instructions), WIP 300HT can also be used under synthetic tiles and asphalt shingles. This strong, skid-resistant membrane is available in either black or white and provides superior protection from water penetration caused by wind-driven rain and ice dams. Features and Benefi ts • Protects the roof structure from water seepage caused by ice dams and wind-driven rains • Resists temperatures up to 250°F without degradation of the adhesive • Seals around roofi ng nails, staples and screws • Bonds directly to the roof substrate for fast and easy installation without the need for additional adhesives • Split-release fi lm provides easier, faster installation • Resists cracking, drying and rotting, providing long-term waterproofi ng performance and low lifecycle cost • Concealed waterproofi ng system will not detract from the architectural aesthetics of the primary roofi ng system • Exposed rubberized asphalt bead along the membrane edge ensures watertightness of lap seams Standards • UL Classifi ed • ICC-ES ESR #2206 • 2009 International Building Code™ • State of Florida Approved Product FSA# FL6782 • Meets ASTM D1970 Storage WIP 300HT roofi ng underlayment rolls should be stored on end, under cover and in areas where the temperature is between 40° and 100°F (4.4° and 38°C). Do not double-stack pallets. Warranty Carlisle WIP products are backed by Carlisle’s industry-leading warranty. Visit our website for warranty details. 300 HT WATER & ICE PROTECTION HIGH-TEMPERATURE PROTECTION WIP 300HT High-Temperature Protection Self-Adhering Roofi ng Underlayment Metal Roof Underlayment Under water-shedding metal roof systems or low-slope metal roofs with a minimum ½" slope, start at the low point and apply WIP 300HT over the full surface of the roof deck. Review the metal roofi ng manufacturer’s instructions for limitations and precautions. Beginning at the eaves, apply underlayment from the low point to the high point of the roof, running the roll horizontally. Limitations • WIP 300HT should be installed when air, roof deck and membrane temperatures are at or above 40°F (4.4°C). • WIP 300HT should not be left exposed to sunlight for more than 60 days for black membrane or 120 days for white membrane. • WIP 300HT membrane should not be folded over the roof edge unless protected by a gutter or other fl ashing materials. • The primary roof system must be ventilated to prevent excessive moisture build-up in the interior structure. • Use caution during the installation of the membrane as it may become slippery when wet or covered with frost. • WIP 300HT must not to be used in contact with fl exible PVC material. Installation WIP 300HT underlayment is applied when the roof deck is dry and the substrate temperature is 40°F (4.4°C) or higher. At temperatures below 40°F, nailing or priming should be used to temporarily hold the membrane in place while adhesion develops. WIP 300HT is designed to be covered with the primary roofi ng system and should not be exposed to sunlight for more than 60 days. White underlayment offers exposure time of 120 days. Moisture Substrate must be free of any moisture. If moisture is present, it may inhibit adhesion. New Construction Prepare the roof deck by removing all loose objects, dirt, dust and debris. Re-roofi ng Remove all old materials from the roof deck in the area to be covered with WIP 300HT underlayment. Replace water-damaged sheathing and sweep roof deck thoroughly. Priming Priming is not required on clean, dry wood or metal surfaces but concrete masonry, exterior gypsum board and polyisocyanurate insulation should be primed using the appropriate primer or adhesive. Adhesives such as CCW-702 and CAV-GRIP™ are appropriate and required when temperatures are below 40°F. Valleys, Hips & Ridges Cut WIP 300HT roofi ng underlayment into manageable lengths. Align over the center of the valley, hip or ridge. Remove release fi lm. Press the middle of the membrane fi rst before working toward the edges. For open valleys, cover WIP 300HT roofi ng underlayment with metal valley liners. Eaves & Rakes Cut WIP 300 HT underlayment into 10–15' pieces. Remove 2–3' of release fi lm and align the edge of the membrane, sticky side down, so it overhangs the drip edge by 3⁄8" (10 mm). Continue to remove release fi lm and press as you move across the roof. Use a hand roller and/or hand pressure to press into place. Overlap end laps a minimum of 6". WIP roofi ng underlayment should reach a point 2' inside the interior wall line. Local codes may require additional courses. If additional courses are required, the top lap must be at least 3½". Drip Edges At the rake edge, apply WIP 300HT underlayment fi rst and place drip edge on top. At the eave, apply drip edge fi rst and place WIP underlayment on top of the drip edge so that it overhangs drip edge by 3⁄8" (10 mm). For standard installation details, follow the WIP detail drawings. For non-standard installation instructions, contact your local Carlisle Residential representative. PRODUCT SPECIFICATIONS PHYSICAL PROPERTIES Surface Black/White Engineered Polyolefi n Composite Film with Factory-applied Anti-skid Coating Membrane Rubberized Asphalt PRODUCT CHARACTERISTIC UNITS RESULTS Roll Length feet 66 Roll Weight lbs 55 Roll Size sq/ft 198 Roll Width inches 36 TYPICAL PERFORMANCE PROPERTIES TEST METHOD RESULTS Thickness ASTM D1970 40 mils Low Temperature Flexibility ASTM D1970 -45˚F Adhesion to Plywood at 75˚F ASTM D1970 35 lbs/ft Lap Seam Adhesion at 75˚F ASTM D1970 21 lbs/ft Sealability Around Nail ASTM D1970 Pass Slip Resistance ASTM D1970 Pass Thermal Stability ASTM D1970 Pass Moisture Vapor Permeance ASTM D1970 0.02 perms Water Absorption ASTM D1970 0.5% Tensile Strength Machine Direction ASTM D412 250 psi Tensile Strength Transverse Direction ASTM D412 1390 psi Elongation at Break Machine Direction ASTM D412 250% Elongation at Break Transverse Direction ASTM D412 170% PACKAGING INFORMATION Boxes (rolls) per pallet 25 P.O. Box 7000 / Carlisle, PA 17013 / Phone: 800.479.6832 / Fax: 717.245.7053 / www.carlislemetalproducts.com Carlisle, WIP and CAV-GRIP are trademarks of Carlisle. COR-TEN is a registered trademark of U.S. Steel. 121311 © 2011 Carlisle.