Loading...
HomeMy WebLinkAboutFile Documents.722 Midland Park Pl.0146.2019 (11).ARBKConstruction Management plan Address 722 Midland Park Aspen, Co 81611_____________________ Permit Applied for: Building Permit________________________________________________________________________ Property Owner’s name: Midland Park Properties____(970) 925-4153_______dwillcox4153@msn.com______________________ Contractor: High Profile Roofing________(970) 485-4367________eli@highprofileroofing.com__________________ Site Supervisor: Enrique Avilez ________ (970)376-7660 ______________________________________________ Description of the work:  Tear-of existing roofing materials and removal from job-site, to be disposed at local landfill  Supply and install High temp ice and water shield over entire roof surface  New GAF Timberline High Definition shingles over entire roof  New 24ga Painted metal flashing Public Notification plan:  Project desired start date 5/21/2019, and will continue until 100% completed  Roofing materials to be stacked on roof by supplier’s equipment  Parking provided by owners no street blockage needed  Dump truck to be used for disposal of debris, to be parked at designed areas Dates of Construction:  to start as soonest building permit is issued and trying to be 100% completed by 5/24/2019 Hours of construction:  Monday to Friday from 8:00 am to 5:00 pm  Possible Saturday work depending on weather