HomeMy WebLinkAboutFile Documents.117 S Spring St.0025-2020-BCOM (10)DATE 03-19-2020 MASTER
PROPERTY INFORMATION
PROJECT DETAITS DEFINITIONS
tnzo
F
=l!lr!6
Proiect Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Bullding Work Area: Total square footaSe of interior area undergoing change or
Unlt 5q Ft: Gross square footage, not FAR, of permitted unit.
Lot Slze: Total surveyed square footage of property.
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed
New Sq Ft: Total added square footage for additions to net livable or net leasable space.
Building Footplint: Grade floor square footage of the permitted structure.
Hardscape Area: Square footage of impervious lot surface.
Zone Disrict: Underlying zone district of permitted parcel.
Date
SUBMITTAT FEES ISSUANCE FEES ISSUANCE FEES
BUILDING PERMIT APPLICATION
t[l!xr
CITYOFASPEN
urr*A and B pARcEgDr 273707332008 and 273707332@9
TRACT
oR suBDlvtsro
owNER1{AME 117 South Spring Street Holdings, LLC cnr.626-705-4138
Broa(
John R. Louderback
toT
i rlo ud e rback @ ao l. c-o m
s1,;ol jrlouderback@aol.com
ceu 626-705-4138 EMArr
ffif;n'il8$^ql Tenant finish lor a hair & nail salon, includinglqw ventilation equipment, new hair wash stations, new tankless sas
water heaters, minor reconfiguring ol interior spaces and minor reconliguring of lighting.
NOTICE: This permit becomes null and wid if work
or construction authorized is not commenced within
180 days. or if construction or work is suspended or
abandoned for a period of 180 days at any tlme after
work is commenced.
$231,300
1,542
1,7@UN|T Sq FT
Yes
No
PROJECT
VALUANOil
SO FT OF
BUII.DING
WORI(AREA
Etr
so FT oF soil.
DISTURBANCE N/A
BUIlDING
FOOTPR!]t'T N/A
ZOI{E
DISTRICT c-1
HARDSCAPE
AREA N/A
Bidets
Tenant Finish
Demolition
Change Order
_Laundry Bar, Utility Sink
Clothes Washer
_Floor Sink
_Floor Draina Water Heater (Pan Req)
NEwsqFT N/A Gas Outlets
Water Treatment
Willthere be
any roof/wall
penetrations?
Water Effi clent Landscaplng. Projects that trigger a major
engineering review. Projects in\rolving interior
alterations affecting 50% or more
of exisiting gross square footage
. Use of BuildinglE CommericallE Multi-FamilvlE Sinsle FamilvlE Mixld-Use 'lo_
lmportant Review Triggers
MaJor Engineerlng Rwiew. Projects involving less than 50%
hardscape area and work affecting
75% or greater of unit sq ft. Projects involving greater than
50% hardscape area and work
affecting 50% or greater of unit
sqft. Projects involving 1,00Or sq ft of
soil disturbance area
HflT ry/A
Class of Work Fixture Counts
New
Addition
Alteration
Reoair
IFFR
_Lavatory (Wash Basin)
Shower
_Kitchen Sink (+Disposal)
EnO
PC
Zoning
HPC
Building
Fire
Ensineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
Io lssue
lssuance
Building
Review
Building
Permit Fee Park lmpact
Engineering
Review
ZoninB
Review (50%)
School Lands
Dedication
Zoning
Review (50%)
cMP (s0%)TDM lmpact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
cMP (s0%)Gls Housing Cash in Lieu
Park Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
2019N I LLL
lpsrpgss 117 South Spring Street, First Floor
3
PERMlT NUMBER:
COM M U N ITY DEVELOPM ENT DEPARTM ENT
04/28/2020
04/28/2020
ADDRESS: 117 South Spring Street, First Floor PERMIT NUMBER:
COM M U N ITY DEVELOPM ENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM CITYOFASPEN
3
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
117 South Spring Street, First Floor
ADDRESS
AandB 27 37 07 332408 and 27 37 07 *2OOgU'{]IT PARCEL ID #
l, the property ownet certify as follows: (pick one)
tr This property is not subject to a homeowners association or other form of private covenant.
tr This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
tl This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature Date 03-19-202A
Owner Printed Name John R.Manager
117 South Spring Street Holdlngs, LLC
OR
Owner's Attorney Signature
Owner's Attorney Printed Name
Date
130 S. GAL2018 P
04/28/2020
ADDRESS:117 South Spring Street, First Floor PERMIT NUMBER:
TAND USE QUESTIONS
ADD:TTONALSCOPE OF WORK QUESTTONS
COM MU N ITY DEVELOPM ENT DEPARTM ENT
SCOPE OF WORK CHECKLIST C|TYOFASPEN
lf you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
Part of an approved COA Land Use Review
Work affects net leasable, net livable, or
non-unit space
Work involves lot splitting or combining a lot
Work involves exterior of structure
Work involves Landmark Parcel or Historic District
Located in.100-year flood plain or within 100' of high
water mark
Work involves changes in occupancy to structure
Changes to elevator or stair configuration
Changes to the use of existing structure or space
fItrtrtrEI Chan8ing the number of residential units
l-I Cha.trges to.number or location ofl-I onslte parKrng
Work adds, removes, or changes
plumbing ffxtures
Disturbs 1,000 sq ft or more of soil within
12 months
Work occurs in public right of way
Work affects trees or occurs within the
dripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
utrtr
Does your permit involve any of the following?
utrE
Exterior lighting added or changed
Work involves roof penetrations
ITY OF ASPEN^u'ust2ol,L6LIN
T
04/28/2020
04/28/2020
COM M U N ITY DEVELOPM ENT DEPARTM ENT
BUILDING DESCRIPTION FORM - IRC & IBC CITYOFASPEN
tFfrl
PERMIT NUMBER:
UNIT DESCRIPflON AS PROPOSED
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (lnclude Mechanical & Storagel
TypeOfConstruction EVAtrVBtr lV tl lllA tr lllB tr llA tr llBtr lA E lB
Required Special lnspections E High-Strength Bolting E Epory Anchors
E Permanent Micropiles E Sprayed Fire-Resistants El Other
Energy Code Compliance E Prescriptive Table EI Othertr RESCheck UA Alternative g co tvt cEE[ffiilElil-ative
E Other (Please Explain)
Code Editions
Exterior Energy Use TotalApproved On-Site
(Existing + New)
Pool 0
Btl$il"'^&%%,rlt u
tr
tr
F_
H-
t_It<50)
Fire Sprinkler System I fxistingt NO lRequired?
Fire Alarms lnstalled EI YesI No
Snowmelt o Spa o
R-
s_
E Structual Steel Welding
tr 2015 IRC
(As Adopted and Amended)
E 201s IBC
(As Adopted and Amended)
tr 201s IEBC
(As Adopted
and Amended)
trA_ trB
E B(A
E One Family E Two Family
E Townhouse
tre trtrMtr
trU
["j I rvp" tr NFPA 13 tr NFPA 13 R tr NFPA 13 D
Attached Garase Detached Garaee Caroort
Parking Spaces- o Parking Spaces-3- Parking Spaces 0
# Bedrooms 0 # Full Baths 0 Deck Area 0
# 3/4 Baths 1 # 1/2 Baths 1
# Kitchens l(k't',ffi) # Wood Fireplaces 0
# Gas Appliances '@*) # Gas Logsi _
ADU BUILDING DESCRIPTION
# Living Rooms_
# Kitchens
# Full Baths
# 3/4 Baths
# U2 Baths
# Bedrooms
# Other Rooms (List)_
trIls there an ADU?Yes
No
Gross Area 6f lf nil; 1'7oo
Occupant Load: _
Gross Area of Building:3,400
# Stories Above Grade 1 # Stories Below Grade 0
g35srnsn1 N/A
Main Level Business
fnd Pl6s; N/A
l1d pls6r N/A
Additional
ct'January 201t 130 S. GALE A
Reviewed By:
-Date:
!I 9-M
04/28/2020
COM M U N ITY DEVELOPMENT DEPARTM ENT
VALUATION AFFIDAVIT CITYOFASPEN
)
ADDRESS: 117 South Spring Street, First Floor PERMIT NUMBER:
AFFIDAVIT POIICY
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that is a public document.
Owner Signature:Date.03-19-2020
Owner Printed Name:B.Manager
117 South Spring Street Holdings, LLG
ot,
Authorized Agent Signature:
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
l, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2015 adopts the 2015 lnternational Residential Code (lRC) and
lnternational Building Code (lBC) with certain amendments. These codes define building valuation as follows:
R108.3 Building permit naluations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. lt in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
cl')EN,"nu",rr*130 S. GALENA ST ASPEN. CO 81611
Authorized Agent Printed Name
Date:_
04/28/2020
ADDRESS: 117 South Spring Street, First Floor PERMIT NUMBER:
COM M U NITY DEVELOPM ENT DEPARTM ENT liillZONING COMPTIANCE VERIFICATION POLICY
\{
CITYOFASPEN
Applicability: All development projects must comply with the Cityt zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, allcommercial, multi-family,lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
ln addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. lndependent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Suruey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
sffucture compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
orfinished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setback, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
CITY OF ASPEN o**,0,,L30 S. GAr
04/28/2020
04/28/2020