Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.117 S Spring St.0025-2020-BCOM (4)
117 South Spring Street, 1st Floor Construction Budget DESCRIPTION COST PLUMBING Navien Tankless Water Heaters $4,000.00 3 Hashima Shampoo Bowls $2,000.00 Labor & Materials $6,500.00 Subtotal $12,500.00 ELECTRICAL Light Fixtures $4,000.00 Labor and Materials $12,000.00 Subtotal $16,000.00 HVAC Aerovax Systems $6,100.00 Labor & Materials $4,000.00 Subtotal $10,100.00 DRYWALL/PLASTER/STEEL STUDS Labor & Materials $15,000.00 Subtotal $15,000.00 INTERIOR FINISH Countertops $5,000.00 IKEA Cabinets $7,500.00 Cabinet Install $4,000.00 Whitewater Oak/Cali Floors $6,500.00 Hexagon Tile Crossville $850.00 Coco Mat (by doors)$350.00 Floor Install $10,000.00 Floor Prep $2,700.00 Dooors $1,500.00 Door Hardware $500.00 Paint $10,000.00 Drop Ceiling Tiles $3,000.00 Labor & Materials $7,000.00 Subtotal $58,900.00 PROFESSIONAL CONTRACTORS General Labor & GC costs $35,000.00 Subtotal $35,000.00 TOTAL CONSTRUCTION COSTS $147,500.00 April, 30 2020