HomeMy WebLinkAboutMaster Permit.229 W Smuggler St.0015-2020-BRES (2) COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalUse of Building Class of Work
New
Repair
________
YesNo
Will there be
NOTICE: This permit becomes null and void if work
work is commenced.
_______________
_______________
_______________ _______________ _______________
_______________
_______________ _______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
IFFRTenant Finish
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Zoning
Review (50%)
CMP (50%)TDM Impact
Review
REMP Pedestrian
CMP (50%) GIS Housing Cash in Lieu
Parks Review Tax Water Tap
Tax
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub
____Shower____Kitchen Sink (+Disposal)____Dishwasher
____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Env. Health
Parks
Landscape
Approved
To Issue
Issuance
Date ApprovedReviewingDepartmentReviewer
NEW SQ FT
Exterior area of the lot where the ground is disturbed
Square footage of impervious lot surface.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
HARDSCAPEAREA
NeedsReview
DEFINITIONSZONEDISTRICT
Major Engineering Review• Projects involving less than 50%
• Projects involving greater than 50% hardscape area and work
• soil disturbance area
• Projects that trigger a major engineering review • Projects involving interior
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
________________________________________________________ _____________________ContractorSignature Date
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
August 2017
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _________ ___________________________
OR
ADDRESS UNIT #PARCEL ID #
January 2018
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
LAND USE QUESTIONS
ADDRESS: ____________________________ PERMIT NUMBER: _______________________________
non-unit space
ADDITIONAL SCOPE OF WORK QUESTIONS
August 2017
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
The 1989 “ban” on asbestos-containing materials is commonly misunderstood.
ASBESTOS INFORMATION
Yes No :
Yes NoCommercial:
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
If you are demolishing the building
ASBESTOS CHECKLIST
Owner______________________________ Phone #___________________________
August 2017
BUILDING DESCRIPTION FORM - IRC & IBC
BUILDING CODE INFORMATION
UNIT DESCRIPTION AS PROPOSED
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
ADU BUILDING DESCRIPTION
B E IRC
IBC
January 2018
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFIDAVIT
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
If, in
denied,
AFFIDAVIT POLICY
January 2019
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Applicability:
through this method.
Timing:
Survey Report:
August 2017
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Review and Acceptance of Report:
Acknowledgment:
August 2017