HomeMy WebLinkAboutFile Documents.100 N 8th St.0135.2019 (10).ARBKBUILDING PERMIT FEE ESTIMATE
Project Address:100 N 8th St #18
Permit Number:TBD
Fee Description Submittal Fees Issuance Fees Total Fees Due
Building Plan Review 134.88$ 134.88$
Engineering Plan Review -$ -$
Parks Plan Review -$ -$
Zoning Plan Review 162.50$ 162.50$ 325.00$
Construction Mitigation Plan
Review -$ -$ -$
Utility Plan Review 55.00$ 55.00$
Aspen Energy Code Payment -$
City Use Tax Deposit -$ -$
County Use Tax Deposit 32.00$ 32.00$
Building Permit Fee 207.50$ 207.50$
GIS Fee -$ -$
IMPACT FEES (IF BLANK, NOT YET CALCULATED)
School Lands Dedication Fee -$ -$
Housing Fee-in-Lieu -$ -$
Parks Impact -$ -$
TDM -$ -$
Parking To Be Determined
Pedestrian Amenity To Be Determined
-$
TOTAL PERMIT FEE 352.38$ 402.00$ 754.38$
Pay ONLY submittal fees at time of permit submission.
Fee estimate does not include Water or Sanitation tap fees or REMP payments due.
The permit and impact fees calculated here are estimates only and may not be the final fees charged.
By using this estimator you acknowledge that it is only an estimate and actual fees due may be different.
This fee estimate is based on unverified information provided by applicant. Fees may change after review by City staff.
Your final fees due will be determined at the issuance of permit.
PROJECT DETAILS
Valuation 12,800.00$
Project Gross Area (ft2)53.00
Affected Area (Exterior) (ft2)0.00
CMP Area (ft2)53.00
Zoning Review Type Minor Residential
Added Residential Floor Area 0.00
Added Commerical Net Leasable 0.00
Housing FTEs Generated (No
more than .1 FTE may be offset
with a fee-in-lieu payment)0