Loading...
HomeMy WebLinkAboutFile Documents.21 Alice Ln.0052-2021-brof (16)Print and Summary City of Aspen Engineering Construction Management Plan #0000000407 | On September 8, 2021 8:14 pm First Name Thomas Hegarty Last Name GZO Sheet Metal and Roong Email gzo1@comcast.net Phone 970-379-9977 IP Address 96.79.235.229 Score Obtained 105.0 out of 105.0 (100.0%) Designation Passed You passed! Your Certicate is attached. Please print and submit with your CMP. Completion Time 6 minutes, 1 second Home /Submission Conrmed Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam City of Aspen Engineering Construction Management Plan #0000000407 | On September 8, 2021 8:14 pm Administrator Remarks Processing User Account Guest Link https://cmpaspen.com/submission-conrmed/? id=f17314edf60810a01078df768e95d388 Section 1/4 Correct answers are worth 5 points. Once a CMP is approved, the site is exempt from any new or changed regulations added to the CMP True (Score 0) False (Score 5) Score Obtained/Total 5/5 The City requires a CMP in order to: a. Make contractors jump through hoops (Score 0) b. Have a document stating how the construction site will mitigate its effect on the neighborhood (Score 5) Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam c. Make it more difcult to do construction (Score 0) d. Have a document that allows the contractor do whatever it takes to complete the construction (Score 0) Score Obtained/Total 5/5 The best description of the City’s enforcement policy for CMP issues is: a. The contractor must do what the City tells him, no matter what (Score 0) b. The City will always give a verbal warning and a correction notice before issuing a red tag (Score 0) c. The City will work with the contractor to x any issues, but may issue a verbal warning, correction notice, or red tag when appropriate. (Score 5) d. The City will automatically side with neighbors in any dispute (Score 0) Score Obtained/Total 5/5 Section 2/4 To Calculate disturbance area, you must: Add all square footage, interior and exterior, that will be physically disturbed by construction activities, even if it is to be revegetated after construction (S 5) Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam (Score 5) Add all square footage, interior and exterior, that will be nished with impervious materials (Score 0) Add all square footage within the footprint of the house (Score 0) Add all square footage of the neighborhood that will be disturbed by any parking, noise, or fumes from the construction site (Score 0) Score Obtained/Total 5/5 The Project Description should be: Be as short as possible (Score 0) Provide an overview of the construction project including background information, proposed development type and general information, the proposed effect on public utilities and the extent of excavation and method of stabilization employed. (Score 5) Include the contact information (Score 0) Be at least 600 words and detail the structural engineering of the building (Score 0) Score Obtained/Total 5/5 Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam Score Obtained/Total 5/5 Public Notication includes: Notifying all neighbors within 300’ of the construction site no less than 10 days prior to the start of construction with a project description and schedule (Score 0) Updating the neighborhood on a monthly basis (Score 0) Posting a project sign in a visible location (Score 0) All of the above (Score 5) Score Obtained/Total 5/5 The Allowable Construction hours are: 7 AM – 5 PM Mon-Sat (Score 0) 7 AM – 5 PM Mon-Fri, 9-5 Sat (Score 0) 9-5 Mon-Sun (Score 0) 7:30 AM-5:30 PM Mon-Fri, 9-5 Sat (Score 5) Score Obtained/Total 5/5 The work hours are completely True Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam p y non-exible (Score 0) False (Score 5) Score Obtained/Total 5/5 Some holiday no work days are in effect throughout the entire City, while some depend on where the construction site is located True (Score 5) False (Score 0) Score Obtained/Total 5/5 When working near other businesses, a construction site: Must maintain site lines or provide signage showing that neighboring businesses are still open (Score 5) Is allowed to completely block access to neighboring businesses as long as access is open from the other side (Score 0) Can work 24 hrs/day without City approval if neighboring businesses are closed for offseason (Score 0) Should schedule large deliveries during the neighboring businesses’ large sale events (Score 0) Score Obtained/Total 5/5 Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam Score Obtained/Total 5/5 Which sentence best describes construction fencing as required by the CMP? Construction fence must be at least 6’ high chain link with a mesh windscreen. (Score 0) An approved sound fence can be used in lieu of chain link fence (Score 0) Depending on construction activities, a fence may not have to fully enclose the entire property (Score 0) All of the above (Score 5) Score Obtained/Total 5/5 Section 3/4 You must provide a copy of all necessary drawings with the CMP submittal even if the drawings are already in the main permit set. True (Score 5) False (Score 0) Score Obtained/Total 5/5 Which of these items is not necessary on a general site plan: Clearly marked property line (Score 0) Construction and/or sound fence line with Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam Construction and/or sound fence line with access points (Score 0) All neighbors within 300’ names and addresses (Score 5) Delivery, material storage, and parking areas (Score 0) Score Obtained/Total 5/5 If you have a site where the location of key elements such as access points, storage areas, and site ofces will change throughout the construction process you should: Turn in one site plan that shows the rst stage of the construction (Score 0) Turn in a site plan for each week of the construction (Score 0) Turn in a site plan to cover each general phase of the construction (Score 5) Don’t turn in a site plan because it will always be changing (Score 0) Score Obtained/Total 5/5 When is a Temporary Right of Way Encroachment needed? Any time construction activity will block any part of a street, sidewalk, or alley (Score 0) Any time materials will be stored in City ROW Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam Any time materials will be stored in City ROW (Score 0) Any time trafc ow, vehicular or pedestrian, will be effected by construction activity (Score 0) All of the above (Score 5) Score Obtained/Total 5/5 When must you depict the extent of excavation and detail any method of stabilization to be employed in your CMP? Any time you will have any soil stabilization (e.g. micropiles, soil nails, layback etc…) as part of your construction process (Score 5) Any time you will have large piles of dirt onsite for more than 2 weeks (Score 0) Any time you will be re-vegetating over ½ an acre (Score 0) Any time you will be storing dirt in the Right of Way (Score 0) Score Obtained/Total 5/5 Section 4/4 All construction sites are required to have 24 hr noise monitoring True (Score 0) Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam to have 24 hr noise monitoring. (Score 0) False (Score 5) Score Obtained/Total 5/5 Which statement best describes the noise limits for construction in Aspen? 65 db all year long (Score 0) 70 db in the summer throughout the city, 70 db in the winter on the Mall, 80 db all other times (Score 5) 70 db in the summer, 80 db all other times (Score 0) 80 db all year long (Score 0) Score Obtained/Total 5/5 A construction site is required to have a sound engineer/consultant model the site and specify noise mitigation measures to keep the noise below the allowable limit when: Any neighbor within 300’ requests it (Score 0) Any type of reinforced earth stabilization will be performed (Score 5) There are 3 or more houses within 300’ of the site (Score 0) Over 400 square ft of the site will be disturbed (Score 0) Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam (Score 0) Score Obtained/Total 5/5 Which statement about construction site noise measurement is not true: All measurements will be taken with a decibel reader on a “Slow” response using the “A” weighting scale (Score 0) All measurements are taken from the property line of the construction site (Score 0) At a project inside a multi-unit building, noise measurements will be taken from the wall, ceiling, or oor of neighboring units. (Score 0) All measurements are taken from the 2nd oor of a neighboring house (Score 5) Score Obtained/Total 5/5 Which of the following statements about Manufacturing Onsite are true: Manufacturing activities that are in excess of 80 db require an Extended Impact Permit (Score 0) Cutting stone is an example of Manufacturing Onsite (Score 0) All manufacturing activities are limited to a 90 day duration (Score 0) Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam All of the above (Score 5) Score Obtained/Total 5/5 Certicate Information Name Thomas Hegarty Company Name GZO Sheet Metal and Roong Email Address gzo1@comcast.net Phone Number 970-379-9977 CITY OF ASPEN 130 S. Galena Street Aspen, CO 81611 Phone: 970.920.5000 Email: Email for Info  PRINT Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam Copyright 2021 City of Aspen Engineering  |  All Rights Reserved  |  Powered by Vick+Co  Overview Introduction  Paperwork  Site and ROW  Noise Suppression  Additional Requirements Course Review Final Exam