City of Aspen Engineering Construction Management Plan #0000000407 | On September 8,
2021 8:14 pm
First Name Thomas Hegarty
Last Name GZO Sheet Metal and Roo ng
Email gzo1@comcast.net
Phone 970-379-9977
IP Address 96.79.235.229
Score Obtained 105.0 out of 105.0 (100.0%)
Designation
Passed
You passed! Your Certi cate is attached. Please print and submit with
your CMP.
Completion Time 6 minutes, 1 second
Home /Submission Con rmed
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
City of Aspen Engineering Construction Management Plan #0000000407 | On September 8,
2021 8:14 pm
Administrator
Remarks
Processing
User Account Guest
Link https://cmpaspen.com/submission-con rmed/?
id=f17314edf60810a01078df768e95d388
Section 1/4
Correct answers are worth 5 points.
Once a CMP is approved, the site is
exempt from any new or changed
regulations added to the CMP
True
(Score 0)
False
(Score 5)
Score Obtained/Total 5/5
The City requires a CMP in order to: a. Make contractors jump through hoops
(Score 0)
b. Have a document stating how the
construction site will mitigate its effect on the
neighborhood
(Score 5)
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
c. Make it more dif cult to do construction
(Score 0)
d. Have a document that allows the contractor
do whatever it takes to complete the
construction
(Score 0)
Score Obtained/Total 5/5
The best description of the City’s
enforcement policy for CMP issues
is:
a. The contractor must do what the City tells
him, no matter what
(Score 0)
b. The City will always give a verbal warning
and a correction notice before issuing a red tag
(Score 0)
c. The City will work with the contractor to x
any issues, but may issue a verbal warning,
correction notice, or red tag when appropriate.
(Score 5)
d. The City will automatically side with
neighbors in any dispute
(Score 0)
Score Obtained/Total 5/5
Section 2/4
To Calculate disturbance area, you
must:
Add all square footage, interior and exterior,
that will be physically disturbed by
construction activities, even if it is to be
revegetated after construction
(S 5)
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
(Score 5)
Add all square footage, interior and exterior,
that will be nished with impervious materials
(Score 0)
Add all square footage within the footprint of
the house
(Score 0)
Add all square footage of the neighborhood
that will be disturbed by any parking, noise, or
fumes from the construction site
(Score 0)
Score Obtained/Total 5/5
The Project Description should be:
Be as short as possible
(Score 0)
Provide an overview of the construction project
including background information, proposed
development type and general information, the
proposed effect on public utilities and the
extent of excavation and method of
stabilization employed.
(Score 5)
Include the contact information
(Score 0)
Be at least 600 words and detail the structural
engineering of the building
(Score 0)
Score Obtained/Total 5/5
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Score Obtained/Total 5/5
Public Noti cation includes: Notifying all neighbors within 300’ of the
construction site no less than 10 days prior to
the start of construction with a project
description and schedule
(Score 0)
Updating the neighborhood on a monthly basis
(Score 0)
Posting a project sign in a visible location
(Score 0)
All of the above
(Score 5)
Score Obtained/Total 5/5
The Allowable Construction hours
are:
7 AM – 5 PM Mon-Sat
(Score 0)
7 AM – 5 PM Mon-Fri, 9-5 Sat
(Score 0)
9-5 Mon-Sun
(Score 0)
7:30 AM-5:30 PM Mon-Fri, 9-5 Sat
(Score 5)
Score Obtained/Total 5/5
The work hours are completely True
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
p y
non- exible (Score 0)
False
(Score 5)
Score Obtained/Total 5/5
Some holiday no work days are in
effect throughout the entire City,
while some depend on where the
construction site is located
True
(Score 5)
False
(Score 0)
Score Obtained/Total 5/5
When working near other
businesses, a construction site:
Must maintain site lines or provide signage
showing that neighboring businesses are still
open
(Score 5)
Is allowed to completely block access to
neighboring businesses as long as access is
open from the other side
(Score 0)
Can work 24 hrs/day without City approval if
neighboring businesses are closed for
offseason
(Score 0)
Should schedule large deliveries during the
neighboring businesses’ large sale events
(Score 0)
Score Obtained/Total 5/5
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Score Obtained/Total 5/5
Which sentence best describes
construction fencing as required by
the CMP?
Construction fence must be at least 6’ high
chain link with a mesh windscreen.
(Score 0)
An approved sound fence can be used in lieu of
chain link fence
(Score 0)
Depending on construction activities, a fence
may not have to fully enclose the entire
property
(Score 0)
All of the above
(Score 5)
Score Obtained/Total 5/5
Section 3/4
You must provide a copy of all
necessary drawings with the CMP
submittal even if the drawings are
already in the main permit set.
True
(Score 5)
False
(Score 0)
Score Obtained/Total 5/5
Which of these items is not
necessary on a general site plan:
Clearly marked property line
(Score 0)
Construction and/or sound fence line with
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Construction and/or sound fence line with
access points
(Score 0)
All neighbors within 300’ names and addresses
(Score 5)
Delivery, material storage, and parking areas
(Score 0)
Score Obtained/Total 5/5
If you have a site where the
location of key elements such as
access points, storage areas, and
site of ces will change throughout
the construction process you
should:
Turn in one site plan that shows the rst stage
of the construction
(Score 0)
Turn in a site plan for each week of the
construction
(Score 0)
Turn in a site plan to cover each general phase
of the construction
(Score 5)
Don’t turn in a site plan because it will always
be changing
(Score 0)
Score Obtained/Total 5/5
When is a Temporary Right of Way
Encroachment needed?
Any time construction activity will block any
part of a street, sidewalk, or alley
(Score 0)
Any time materials will be stored in City ROW
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Any time materials will be stored in City ROW
(Score 0)
Any time traf c ow, vehicular or pedestrian,
will be effected by construction activity
(Score 0)
All of the above
(Score 5)
Score Obtained/Total 5/5
When must you depict the extent of
excavation and detail any method
of stabilization to be employed in
your CMP?
Any time you will have any soil stabilization
(e.g. micropiles, soil nails, layback etc…) as
part of your construction process
(Score 5)
Any time you will have large piles of dirt onsite
for more than 2 weeks
(Score 0)
Any time you will be re-vegetating over ½ an
acre
(Score 0)
Any time you will be storing dirt in the Right of
Way
(Score 0)
Score Obtained/Total 5/5
Section 4/4
All construction sites are required
to have 24 hr noise monitoring
True
(Score 0)
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
to have 24 hr noise monitoring. (Score 0)
False
(Score 5)
Score Obtained/Total 5/5
Which statement best describes the
noise limits for construction in
Aspen?
65 db all year long
(Score 0)
70 db in the summer throughout the city, 70 db
in the winter on the Mall, 80 db all other times
(Score 5)
70 db in the summer, 80 db all other times
(Score 0)
80 db all year long
(Score 0)
Score Obtained/Total 5/5
A construction site is required to
have a sound engineer/consultant
model the site and specify noise
mitigation measures to keep the
noise below the allowable limit
when:
Any neighbor within 300’ requests it
(Score 0)
Any type of reinforced earth stabilization will
be performed
(Score 5)
There are 3 or more houses within 300’ of the
site
(Score 0)
Over 400 square ft of the site will be disturbed
(Score 0)
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
(Score 0)
Score Obtained/Total 5/5
Which statement about
construction site noise
measurement is not true:
All measurements will be taken with a decibel
reader on a “Slow” response using the “A”
weighting scale
(Score 0)
All measurements are taken from the property
line of the construction site
(Score 0)
At a project inside a multi-unit building, noise
measurements will be taken from the wall,
ceiling, or oor of neighboring units.
(Score 0)
All measurements are taken from the 2nd oor
of a neighboring house
(Score 5)
Score Obtained/Total 5/5
Which of the following statements
about Manufacturing Onsite are
true:
Manufacturing activities that are in excess of
80 db require an Extended Impact Permit
(Score 0)
Cutting stone is an example of Manufacturing
Onsite
(Score 0)
All manufacturing activities are limited to a 90
day duration
(Score 0)
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
All of the above
(Score 5)
Score Obtained/Total 5/5
Certi cate Information
Name Thomas Hegarty
Company Name GZO Sheet Metal and Roo ng
Email Address gzo1@comcast.net
Phone Number 970-379-9977
CITY OF ASPEN
130 S. Galena Street Aspen, CO 81611
Phone: 970.920.5000
Email: Email for Info
PRINT
Overview
Introduction
Paperwork
Site and ROW
Noise Suppression
Additional Requirements
Course Review
Final Exam
Copyright 2021 City of Aspen Engineering | All Rights Reserved | Powered by Vick+Co