Loading...
HomeMy WebLinkAboutFile Documents.800 E Hopkins Ave.0046-2021-BRES (2)ADDRESS: 800 E. Hopkins PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CRv fAgpEN FOR PLAN REVIEW QUESTIONS Name Erik Larson Phone - - Email FOR INSPECTION QUESTIONS Name Erik Larson Phone (-mail Name Phone Cell Phone ;jma 800 E. Hopkins Ave B3 E,�Aspen f eco ap81611 E-Wilms m.platt@northeastem.edu OWN ER'S AUTHORIZED AGF FT Name Erik Lamon- LaraUn aSaw Home, Inc. Phmw Cdl Fhone n"'ea'la: PO Box 877 ElwGlenwood Springs co ap81602 Sawhorse.inc@comcast.net pddrellss Name Erik LPlosM Phone cell Ph.. - - an"m PO Box 877 Glenwood Springs g CO Z1P81602 EVIL eSawhorse.inc@comcast,net Name N/A Phone cell Prone AspEms City stag Ice Ln AOO a CIVIL ENGINEER OF RECORD Name Ni Phone Can Phone Milm' loss - Chat sub ZIP Ad�arelss IS TRUCE Name N/A Phone Cell Phone "Xin CIN state MP Email Address GENERAL CONTRACTER Name Erik Larson- Larson's Saw Home, Inc. ponK Cell Phone d<'ri� PO Box 877 Glenwood Springs .. ZIP 81602 Acrid sawhorse,inc@comcasst.net I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be Complied with whether specified herein or not. The granting ore permit does not presume to give authority to violate: or cancel the provisions of any other state or local law regulating construction or the performance of construction. it is my responsibility to review the approved plans and any Comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Additionally, I untlenbnd that I am responsible for ensudng that all sub permits associated with my project are submitted to the City in compliance with the approved Master plan set. I understand that the My does not review sub-permksfor Compliance with the master plan set Contractoryi�ia�ai signature �^��I� Date ❑ Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by: Date: Affidavit on file CITY OF ASPENoataboraaap 130 S. GALENA ST I ASPEN CO 81611 ADDRESS: PERMIT NUMBER: j COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM t All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by theproperty owner or attorney representing the property owner. The following certification shall accompany the application for a permit. _ "DRESS 800 E. Hopkins Ave. UNna..B3 �raacEuD# 273718288004 I, the property owner, certify as follows: (pick one) - O This property is not subject to a homeowners association or other form of private covenant. p. This property is subject to a homeowners association or private covenant and the improvements .proposed in this building permit do not require approval by the'homeowners association or covenant beneficiary, LAC This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit havebeen approved by the homeowners association or covenant beneficiary. 1 understand the City of Aspen does not interpret, enforce, or maneg.e the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public. document. Owner Signature © - Date January 28, 2021 Owner Printed Name ` Margie Platt OR Owner's Attorney Signature Date Owner's Attorney Printed Name - ADDRESS: 800 E. Hopkins Ave. 63 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFIDAVIT, AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit,. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define: building valuation as follows: R106.3 Building permit valuations. Building permit valuation shall include Total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permitvalue at time of application. Permit valuationsshall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building. official. Final building permit valuation shall be set by the building official City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, Floor coverings, tile; cabinets and countertops are included in the permit valuation total Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. l understand that this document is a public document. Owner Signature: Date: Owner Printed Name: o, Authorized Agent Signature: 4—� Date;02/02/2021 Authorized Agent Printed Name: Erik Larson CITY OF ASPEN,a-uar.2o=s 130 S. GALENA ST I ASPEN CO 81611 ADDRESS: BOO E. Hopkins Ave. B3- PERM IT NU M B E R: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST�N' iTTYOFASPEN ASBESTOS INFORMATION Asbestos Ise known human carcinogen and is an airborne hazard. once airborne; asbestos fibers can stay suspended in the airfor days, weeks, or even months before settling out of the aicYhe fiberstan easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latentasbestos hazards that could expose people to asbestos inthe future, long after the renovation activity occurred. The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposureto the current and future occupants of the home.' The 1989 "ban" on asbestos -containing materials is commonly misunderstood. In fact, in.1991 the U.S. Fifth Circuit Courtof appeals vacated much ofthe so-called "Asbestos Ban and Phaseout Rule" and remanded it tothe EPA. Thus, much of the original 1989 EPA ban canthe U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos -containing product categories was set aside and DID NOTTAKE EFFECT. Therefore; ALLdemolltion, remodel or renovation projects must determine if disturbed material above In trigger levels contains asbestos. - ASBESTOS CHECKLIST - []Yes © No Residential: Will you be removing mare than 32 sq ft,501inear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks; or steel - examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? - 0YesMN0 Commercial: Will you be removing more than 160 sq ft, 260.linear feet (e.g., pipe insulation), or the wlume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel — examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and -the test report must be submitted with the building permit application. If the building has asbestos, astate certified asbestos.. abatement firm must remove it. After: removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean, This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages,.DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit.. t hereby certify that the above information is true and complete. Harland and Marjorie Platt Owner , Phone#617-504-0203 Erik Larson- Larson's saw Horse, Inc 970-618-8120 Applicant (print name) Phone# _^ 02/02/21 �/�.4/y Applicant Signature Date Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you havequestions about asbestos, interpreting your test results, or other matters. CITY OF ASPEN,lugust2017 130 S. GALENA ST I ASPEN CO 81611JJ PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi -family, lodging, and mixed -use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification.. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed measurement. Additional roof plans showing location of measurements may be necessary. PERMIT NUMBER: - ADDRESS: aZ '�T Aff FIE -&3 COMMUNITY DEVELOPMENT DEPARTMENT Al ZONING COMPLIANCE VERIFICATION POLICY r cmow, 4-Plans and elevations must Include height or setback exemption items unique to the building,. such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas; and other height or setback exemption. items unique to the project. S-The report shall include awritten description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. - 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. - 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved. building. permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited toadditional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions. or amendments to the building permit may be required. A determination of non-compliance shall result in the Issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably: practical in the construction process to minimize disruption to the construction schedule.,. Acknowledgment:. .Erik Larson- Larsons Saw Horse, i(mntmctor name) understand this policy. lagree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complieswith all applicable zoning limitations: Contractor Signatures.—"�- 2/2/21 Date: CITY OF ASPENA ... 1� a l 130 S. GALENA ST I ASPEN CO 81611