Loading...
HomeMy WebLinkAboutFile Documents.434 E Main St.0007-2020-BREP (3)ADDRESS: 434 E. Main Street DFRMPT RIP IR#RFR COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM CITY OFASPEN All applications for a building permit within the City of Aspen are required to include a certification of cc with applicable covenants and homeowner association policies. The certification must be signed by the owner or attorney representing the property owner. The following certification shall accompany the apt for a permit. ADDRM 434 E. Main Street uNn#HOA MRCUID# I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. This property is subject to a homeowners association or private covenant and the improvements pr posed in this building permit have been approved by the homeowners association or covenant beneficiary. 1 understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. J Owner Signature —P(eirld�-'I" Date 3-16-2020 Owner Printed Name /' 1, ��%4^� CIeL/) r—p(`e,(;deA �,� V Q(2�0. /dC7f OmCOwnP1� W!0 OR Owner's Attorney Signature Owner's Attorney Printed Name ADDRESS: 434 E. Main Street PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFIDAVIT G"!OF ASPEN AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements__. I//un erstand that this document is a public document. Owner Signature: /U� '6/44444N1ate:3-16-2020 Owner Printed Name: (A W 4n to GN- feoloeA+ Ga(e.w Ldr-H pypy¢d✓oer5 AsJnc, 'fin or, Authorized Agent Signature: Date: Authorized Agent Printed Name Steeplechase Construction, Inc 0124 Totterdown Road Aspen, CO 81611 steve@steeplechaseconstruction.com 970-3796286 Cell/970-920-4079 Office NAME/ADDRESS alena Lofts 14 E Main St. spen CO 81611 Estimate DATE ESTIMATE 8/21/2019 1 2019-29 q DESCRIPTION I TOTAL I Lofts - Concrete Decking Project kway - Concrete and Tile Demolition and Disposal 4 Concrete and Tile Landings Demolition and Disposal kway and Landings - New Colored Concrete to match existing color at, Supervision and Administration Contractors Fee Insurance We did not observe any waterproofing in the existing decks or landing, so no new waterproofing is proposed. Permits and Fees not included TOTAL 4,800.00 900.00 10,224.00 2,720.00 1,864.41 372.88 $20,881.29