Loading...
HomeMy WebLinkAboutFile Documents.232 E Main St.0005-2021-BCOM (4)232 E. Main Housing Mitigation Main Level (3,428 Proposed net-leasable – 1,294 Existing) = 2134/1000 = 2.134 2.134 x 3.6 (MU Generation rate) = 7.6824 FTE’s Upper Level 1,389 Proposed net-leasable/1000 = 1.389 x 3.6 = 5.0004 FTE’s 5.0004 x .75 (25% discount for upper level) = 3.7503 FTE’s Total = 3.7503 + 7.6824 = 11.4327 x 60% (per approvals) = 6.85962 = 6.86 FTE’s