Loading...
HomeMy WebLinkAboutFile Documents.971 Ute Ave. (21)CIVIL ENGINEER: - CONTACT: - - COL. C.O. CEILING HEIGHT A.F.F.+13'-11" PROJECT ADDRESS: PARCEL ID: FIRE SPRINKLER SYSTEM INSTALLED: APPLICABLE CODES: ·2009 IRC (International Residential Code) Chapters 1-10 ·2009 IRC appendixes: ·Manufactured homes, F: Radon, J: Existing Buildings & Structures, H:Patio Covers, K: Sound Transmission. ·2009 IPC (International Plumbing Code) ·2009 IMC (International Mechanical Code) ·2009 IFGC (International Fuel Gas Code) ·2009 IECC (International Energy Conservation Code) - Prescriptive Path ·2009 IFC (International Fire Code) ·2014 NEC (National Electrical Code) 971 Ute Aveune, Aspen CO 81611 273718295029 NO R-15 3,682.79 sq ft EXISTING, 3,682.79 sq ft PROPOSED (NO CHANGE) Residential Front - 25', Side and Rear - 10' ZONING: F.A.R. PERMITTED USE: SETBACKS: Tread Terrazzo Thick Tempered TEL. T.C. T.B. T. THK. T.M.E. T.O.C. T.&G. TER. TEMP. To Match Existing Top of Concrete Towel Bar Top of Curb Telephone Tongue & Groove Typical Varies UnfinishedUNF. V.C.T. VAR. U.O.N. UNEXC. U.B.C. T.O. PLY T.O.W. TYP. Veneer Vertical Vestibule Volume Wood West With V.I.F. W.C. WD. W.H. W. W/ V.G.D.F. VOL. VERT. VEST. VEN. Wall Covering Water Heater Vertical Grain Douglas Fir Verify in Field Vinyl Composition Tile Top of Plywood Top of Wall Uniform Building Code Unexcavated Unless Otherwise Noted Top of PlateT.O.P. Wainscot Weight W.P. WW. WR. WT. W.S.P. W.P.M. WSCT. Welded Wire Work Point or Waterproofing Waterproof Membrane Wet Standpipe Water Resistant WithoutW/O REQ. RESIL. REINF. REG. REV. RWD. REMOV. R.O. RM. RET. Rough Opening Redwood Required Removable Room Resilient Retaining Reinforced Register Mounted Mullion Nominal North Number New Not to Scale Miscellaneous Not in Contract S.C.D. S.D. S. S.A.F.F SEP. SHT. S.H. SECT. S.E.D. SCHED. Separation Sprinkler Head Sheet See Civil Drawings Soap Dispenser/Dish See Electrical Drawings Storm Drain, Schedule Section Self-Adhesive Flexible Flashing South S.G.D. S.L.D. SHTG. S.C.D. SL. SIM. S.P.D. SPEC. S.M.D. S.S. SQ. S.LT.D. Stainless Steel Square See Lighting Drawings See Garage Drawings See Plumbing Drawings See Civil Drawings Sheathing Sliding Similar Opposite Opening On Center Overall Plaster Plywood Perimeter Plate Plastic Laminate Outside Diameter (Dim.) Point Paint Quarry Tile Partition Painted Paper Towel Receptacle Per Square Inch Pressure Treated Post Tensioned Paper Towel Dispenser Panel MUL. MISC. MTD. NOM. N.T.S. N.I.C. N. (N) Hardware Hardwood Hanger Height Horizontal Handrail Hour Hot Water Heater Hollow Metal HGT. HDW. HDWD. HGR. H.W.H. HORIZ. HR. H.R. H.M. Floor Drain Fire Extinguisher Cabinet Flat Bar Fixture Floor Srew Finish Flat Head Wood Screw Flat Head Machine OPP. O.A. O.C. O.D. PLAS. PL. Insulation Interior Inch Kitchen Joist Joint Janitor Junction Box Intermediate P.S.I. PNT. PT. P.T. P.T.R. P.T.D. PTN. Q.T. PTD. Laminate Lavatory Pound Linear Light Maintain Material Maximum Machine PNL. INTER. IN. INSUL. INT. KIT. JST. JB JT. JAN. Fluorescent Face of Finish Face of Plywood Face of Stud Footing Furring Future Frame Foot or Feet Fireproof Face of Concrete LB. LIN. LT. LAM. LAV. MAINT. MAT. MAX. MACH. General Gauge Gas Outlet Galvanized Ground Grade Glass Interrupt Ground Fault Galvanized Sheet Garbage Disposal Flashing Inside DiameterI.D. ABBREVIATIONS P.LAM. PLYWD. PERIM. OPNG. NO. or # STOR. STRL. STD. STL. S.V. SYS. SYM. S.W. System Steel Structural Sheet Vinyl Shear Wall Symmetrical Storage StandardReturn Air Recessed Radius Riser Reference Reflected Refrigerator REC. RAD. R.A. R. REFR. REFL. REF. Overlay Mechanical Membrane Minimum Metal Machine Bolt Medicine Cabinet Medium Density Manufacturer M.D.O. MEMB. MECH. M.B. M.C. MIN. MTL. MFR. Gypsum Handicapped Hose Bibb Hollow Core or Header Head Hardboard Metal S.S.D. See Structural Drawing Specification or Special See Landscape Drawings See Mechanical Drawings Revision/Revised/Reversed F.E. F.B. F.D. FIXT. FLR. F.H.W.S. FIN. F.H.M.S. CONSTR. CONN. COND. CONC. CTR. C.W. C.T. CONTR. CLOS. CONT. Center Cold Water Contractor Closet Ceramic Tile Condition Connection Construction Continuous Concrete F.O. Ply F.O.S. FLUOR. F.O.C. F.O.F. FURR. FUT. FTG. FR. FT. F.P.R.F. GALV. G.D. GEN. G. GA. GND. G.S.M. GR. GL. G.F.I. DIA. DIM. DBL. DET. D.F. DWG. DWR. D.W. DN. DR. DISP. E.J. EA. (E) E.I.F.S. E.O.S. ENCL. E.P.B. ELEC. EMER. EL. Dishwasher Edge of Slab Electrical Panel Board Enclosure Exterior Insulation & Elevation Electrical Emergency Existing Finish System Expansion Joint Each Drawing Drawer Drinking Fountain Dispenser Down Door Double Diameter Dimension Detail FLASH. At@ & < A.C. # 0 ACOUS. ALUM. ALT. ADJ. AGGR. ADJAC. BITUM. BD. ARCH. ASPH. APPROX. BM. B.O. BOT BLKG. BLK. C.B. CEM. CER. B.P. BTWN. BLDG. A.D. Catch Basin Cement Ceramic Beam Bottom of Building Paper Between Bottom Building Blocking Bituminous Board Block Diameter or Round Air Conditioning or Asphaltic Concrete Aluminum Approximate Architectural Asphalt Alternate Acoustical Area Drain Adjustable Aggregate Adjacent Pound or Number Angle And H.B. H.C. GYP. HDR. HDBD. HD. EXP. EXT. EXIST. EQUIP. F.A.U. F.A. Forced Air Unit Fire Alarm Equipment Existing Expansion Exterior CLKG. C.M.U. CLR. CLG. CNTR. Column Concrete Masonry Caulking Clean-Out Counter Unit Clear Ceiling C.J. Control Joint EqualEQ. PROJECT DIRECTORYVICINITY PLAN CONTACT: Ryan Doremus STRUCTURAL ENGINEER: LANDSCAPE DESIGN: OWNER/CLIENT: ARCHITECT: Aspen, CO 81611 Thunderbowl Architects 300 Spring St. Suite 201 Email: ryan@thunderbowlarchitects.com Ajax Holdings SHEET NUMBER INTERIOR ELEVATION NUMBERS SYMBOLS 3 A6.1 1 A4.3 DOOR SYMBOL14 1A A 3 A6.1 DETAIL NUMBER SHEET NUMBER WINDOW SYMBOL PARTITION TYPE SHEET NUMBER BUILDING SECTION NUMBER SHEET NUMBER ENLARGED DETAIL NUMBER HOSE BIBB REVISION COLOR FINISH MATERIAL HB JB XX X 1 (N)/(E) CONSTRUCTION JUNCTION BOX Aspen, Colorado 971 UTE AVENUE GENERAL NOTES PROJECT STATISTICS TYPE: OCCUPANCY: OVERALL PROJECT HEIGHT AND AREA: PROJECT SUMMARY: Type V - Non-rated Type R-3 Maximum Height N/A - Area N/A INTERIOR REMODEL OF EXISTING BATHROOMS AND UPDATING KITCHEN CABINETRY AND PLUMBING FIXTURES. - - CONTACT: - CONTRACTOR A5.2 1 2 3 4 FOR ALL DRAWINGS EXCEPT DETAILS DIMENSIONING KEY TICK LEADER DENOTES DIMENSION TO FRAMING DOT LEADER DENOTES DIMENSION TO GRIDLINE/< 2'-2"3'-6" ARROW LEADER DENOTES DIMENSION TO FINISH 3'-5" PERMIT SET APRIL 6TH, 2017 SITE 971 UTE AVENUE ASPEN, COLORADO The work included under this contract consists of all labor, materials, transportation, tools and equipment necessary for the construction of the project leaving all work ready for use. The construction documents are the property of Thunderbowl Architects Inc and its Consultants and are to be used as instruments of service for construction of this project only. Use for any other purpose, without authorization, is not allowed. The plans indicate the general extent of new construction necessary for the work, but are not intended to be all-inclusive. All demolition and all new work necessary to allow for a finished job in accordance with the intention of the drawing is included regardless of whether shown on the drawings or mentioned in the notes. Any errors, omissions or conflicts found in the various parts of the construction documents shall be brought to the attention of the Architect and the Owner for clarification before proceeding with the work. The General Contractor shall maintain a current and complete set of the construction documents on the job site during all phases of construction for use of all the trades and shall provide all the subcontractors with current and complete construction documents as required including specifications and architectural supplementary instructions. The General Contractor shall verify and assume responsibility for all dimensions and site conditions. The General Contractor shall inspect the existing premises and take note of existing conditions prior to submitting prices. No claim shall be allowed for difficulties encountered which could have reasonably been inferred from such an examination. Written dimensions take precedence. Do not scale drawings. See SYMBOLS area of this sheet for dimension standards. All dimensions noted "verify" and "V.I.F." are to be checked by Contractor prior to construction. Immediately report any variances to the Architect for resolution, then coordinate resolution w/ all work of all trades. Coordinate all work with existing conditions, including but not limited to: irrigation pipes, electrical conduit, water lines, gas lines, drainage lines, etc. Notify Architect immediately of any conflicts. Provide adequate temporary support as necessary to assure the structural value or integrity of the building. Protect all existing building and site conditions to remain, including walls, cabinets, finishes, trees and shrubs, paving, etc. Details shown are typical. Similar details apply in similar conditions. Verify all architectural details with structural, civil, landscape and design/build drawings before ordering or installation of any work. All changes in floor materials occur at centerline of door or framed opening unless otherwise indicated on the drawings. Install all fixtures, equipment and materials per manufacturer's recommendations. Verify clearances for flues, vents, chases, soffits, fixtures, etc. before any construction, ordering of, or installation of any items of work. Sealant, caulking and flashing, etc. locations shown on drawings are not intended to be inclusive. Follow manufacturer's installation recommendations and standard industry and building practices. The General Contractor shall remove all rubbish and waste materials of all subcontractors and trades on a regular basis, and shall exercise a strict control over job cleaning to prevent any direct debris or dust from affecting, in any way, finished areas in or outside job site. Contractor shall leave premises and all affected areas clean and orderly, ready for occupancy. This includes cleaning of all glass (inside and outside) and frames, both new and existing. Any survey monuments within the area of construction shall be preserved or reset by a registered civil engineer or a licensed land surveyor. Verify all finish materials with the Architect and the Owner prior to installation. On site mock-ups of building assemblies, finish assemblies, paint and/or stain samples, etc. may be required for approval. Contractor to coordinate utilities shown on architectural drawings with electrical, plumbing, mechanical, and any other consultant drawings. Contractor to coordinate all the trades. Structural observation shall be required by the Engineer for structural conformance to the approved plans. It is the General Contractors responsibility to obtain inspections and special inspections as necessary. All construction to provide a waterproof, weather tight building. Contractor should flash and caulk as necessary to achieve this requirement. S. South - CONTACT: - - Kaegebein Fine Homebuilding CONTACT: Nate Kaegebein - - 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. SHEET INDEX NOT INCLUDED IN THIS SET INCLUDED IN THIS SET DATES ISSUEDSHEETTITLE DELETED FROM SET - MECHANICAL DESIGN: - - CONTACT: -Tel: (XXX) XXX-XXXX Email: Tel: (XXX) XXX-XXXX Email: Tel: (XXX) XXX-XXXX Email: Tel: (XXX) XXX-XXXX Email: Tel: (970) 379-6228 Email: natekaegebein@kfhomebuilding.com Tel: (970) 274-1421 PERMIT SETAPRIL 3, 2017G0.00 COVER Z-001 FLOOR AREA CALCULATIONS D-101 D-102 D-103 EXISTING/DEMO UPPER LEVEL FLOOR PLAN A-101 PROPOSED LOWER LEVEL FLOOR PLAN A-102 PROPOSED MAIN LEVEL FLOOR PLAN A-103 PROPOSED UPPER LEVEL FLOOR PLAN EXISTING/DEMO MAIN LEVEL FLOOR PLAN EXISTING/DEMO LOWER LEVEL FLOOR PLAN D-104 EXISTING/DEMO LOWER LEVEL RCP D-105 EXISTING/DEMO MAIN LEVEL RCP D-106 EXISTING/DEMO UPPER LEVEL RCP A-104 PROPOSED LOWER LEVEL RCP A-105 PROPOSED MAIN LEVEL RCP A-106 PROPOSED UPPER LEVEL RCP Tel: (970) 274-1421 CONTACT: Ryan Doremus (Thunderbowl Architects) Aspen, CO 81611 300 Spring St. Suite 201 Email: ryan@thunderbowlarchitects.com PROJECT SCALE GENERAL INFORMATION SHEET 17007.00 G0.00 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 City of Aspen Received 5/11/17 Building Department Provide an asbestos inspection report including the narrative, lab data, and inspector's certifications. This project was submitted after April 10, 2017, putting it on the 2015 codes. Revise to make all codes be 2015 except for the 2014 NEC. 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"DECK 202.34 sq ft FLOOR AREA 1,696.14.35 sq ft 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"FLOOR AREA 1,307.35 sq ft GARAGE 410.00 sq ft 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"FLOOR AREA 1,763.10 sq ft 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"FLOOR AREA 1,763.10 sq ft 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"FLOOR AREA 1,307.35 sq ft GARAGE 410.00 sq ft 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"DECK 202.34 sq ft FLOOR AREA 1,696.14.35 sq ft PROJECT SCALE FLOOR AREA CALCULATIONS 1/8" = 1'-0" 17007.00 Z-001 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017NEXISTING LOWER LEVEL 1/8" = 1'-0" 1 Z-001 0 4 8 16 Scale: 1/8" = 1'-0" EXISTING MAIN LEVEL 1/8" = 1'-0" 2 Z-001 EXISTING UPPER LEVEL 1/8" = 1'-0" 3 Z-001 PROPOSED LOWER LEVEL 1/8" = 1'-0" 4 Z-001 PROPOSED MAIN LEVEL 1/8" = 1'-0" 5 Z-001 PROPOSED UPPER LEVEL 1/8" = 1'-0" 6 Z-001 N0 4 8 16 Scale: 1/8" = 1'-0"N0 4 8 16 Scale: 1/8" = 1'-0"N0 4 8 16 Scale: 1/8" = 1'-0"N0 4 8 16 Scale: 1/8" = 1'-0"N0 4 8 16 Scale: 1/8" = 1'-0" DECK AREA GARAGE AREA FLOOR AREA PROPOSED FLOOR AREA CALCULATIONS FLOOR AREA LEGEND EXISTING FLOOR AREA CALCULATIONS LOWER LEVEL 1,763.10 sq. ft. MAIN LEVEL 1,307.35 sq. ft. GARAGE 410.00 sq. ft. DECKS/PORCH 202.34 sq. ft. TOTAL 3,682.79 sq. ft. LOWER LEVEL 1,763.10 sq. ft. MAIN LEVEL 1,307.35 sq. ft. GARAGE 410.00 sq. ft. DECKS/PORCH 202.34 sq. ft. TOTAL 3,682.79 sq. ft. City of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"UP BED 101 CARPET ADU BED 103 CARPET ADU BATH 102 STONE ADU KITCHEN 104 STONE CLOSET 113 CARPET ADU CLOSET 105 CARPET BATH 111 STONE MEDIA ROOM 107 CARPET CRAWL SPACE 108 CONCRETE MECH. ROOM 109 CONCRETE LAUNDRY 110 STONE BUNK ROOM 112 CARPET ADU STAIR 106 CONCRETE UP CLOSET 115 CARPET BATH 114 STONE T.O. SLAB EL. = 89'-0 3/4" V.I.F. REF BUILT IN SUMP PUMP LOCATION W/D W/D EXISTING WASHER TO REMAIN EXISTING DRYER TO REMAIN REPLACE EXISTING FIXTURES AND CABINETS REPLACE EXISTING FIXTURES AND CABINETS EXISTING MECH. EQUIPMENT TO REMAIN AREAS OF WORK AREA OF WORK PROJECT SCALE LOWER LEVEL DEMOLITION PLAN 1/4" = 1'-0" 17007.00 D-101 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 LOWER LEVEL DEMOLITION PLAN 1/4" = 1'-0" 1 D-101 0 2 4 8 Scale: 1/4" = 1'-0"NDEMOLITION NOTES 1.FURNISH EQUIPMENT AND PERFORM LABOR REQUIRED TO EXECUTE THE CONTRACT DOCUMENTS. 2.PROTECT EXISTING WORK TO REMAIN INCLUDING DUST CONTROL. 3.THE DRAWINGS DO NOT NECESSARILY INDICATE THE FULL EXTENT OF THE WORK TO BE PERFORMED. INSPECT THE EXISTING CONSTRUCTION CAREFULLY TO DETERMINE THE FULL EXTENT OF WORK TO BE PERFORMED AND THE CHALLENGES INVOLVED. 4.DO NOT ALLOWED DEMOLISHED DEBRIS TO ACCUMULATE ON SITE BEYOND A REASONABLE AMOUNT. MAINTAIN PROGRESSIVE DISPOSE OF DEBRIS IN A LEGAL MANNER. 5.REMOVAL OF ALL HAZARDOUS MATERIALS IS THE RESPONSIBILITY OF THE OWNER. SHOULD THE CONTRACTOR ENCOUNTER ANY HAZARDOUS MATERIALS WHILE EXECUTING DEMOLITION, THEY SHOULD CONTACT THE OWNER IMMEDIATELY. 6.VERIFY ALL SALVAGING REQUIREMENTS WITH THE OWNER PRIOR TO DEMOLITION. 7.NOTIFY OWNER 48 HOURS PRIOR TO ANY UTILITY SERVICE DISRUPTION. 8.COORDINATE EXTENT OF ALL STRUCTURAL DEMOLITION WITH THE STRUCTURAL DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND IMPLEMENTATION OF TEMPORARY SHORING AND BRACING AS REQUIRED. 9.VERIFY EXTENT OF WALL AND ROOF REMOVAL WITH STRUCTURAL ENGINEER. 10.PRIOR TO COMMENCEMENT OF DEMOLITION, EXTENT OF STRUCTURE AND/OR FINISH TO BE REMOVED MUST BE VERIFIED WITH BOTH THE OWNER AND ARCHITECT. 11.PROVIDE NECESSARY EROSION CONTROL PER LANDSCAPING OR CIVIL DRAWINGS. LEGEND SEE A0.00 FOR SYMBOLS NOT SHOWN HERE. (E) CONST. TO BE REMOVED OR NEW MASONRY WALL NEW CONSTRUCTION EXISTING CONSTRUCTION AREA OF WORK AREA OF WORK LOWER LEVEL:185 sq ft TOTAL:880 sq ft UPPER LEVEL:435 sq ft MAIN LEVEL:260 sq ft City of Aspen Received 5/11/17 Building Department 333 sf The walls and ceiling separating the ADU bath and kitchen from the rest of the house must be 1 hour fire rated with an STC rating of at least 50. You will likely be disturbing the existing drywall. Provide listed assemblies to be used to replace the drywall if more than 32sqft is disturbed. 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"W/D W/D UP BED 101 CARPET ADU BED 103 WOOD ADU BATH 102 TILE ADU KITCHEN 104 TILE CLOSET 113 CARPET ADU CLOSET 105 WOOD BATH 111 TILE MEDIA ROOM 107 CARPET CRAWL SPACE 108 CONCRETE MECH. ROOM 109 CONCRETE LAUNDRY 110 WOOD BUNK ROOM 112 CARPET ADU STAIR 106 CONCRETE UP CLOSET 115 CARPET BATH 114 TILE MEDIA BUILT-IN SUMP PUMP LOCATION REF. EXISTING W/D TO REMAIN REPLACE BATHROOM FIXTURES REPLACE BATHROOM FIXTURES REPLACE BATHROOM FIXTURES REPLACE KITCHEN APPLIANCES EXISTING STAIR TO REMAIN T.O. SLAB EL. = 89'-0 3/4" V.I.F. T T T EGRESS WINDOW EGRESS WINDOW 1 HR SEP. WALL 1 HR SEP. WALL ELECTRICAL PANEL2'-8"2'-5"1'-6"3'-6"1'-6"2'-9"1'-6"3'-9"1'-6"2'-9"1'-6"3'-6"1'-6"PROJECT SCALE PROPOSED LOWER LEVEL FLOOR PLAN 1/4" = 1'-0" 17007.00 A-101 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 PROPOSED LOWER LEVEL FLOOR PLAN 1/4" = 1'-0" 1 A-101 0 2 4 8 Scale: 1/4" = 1'-0"NALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS FLUSH FINISH. FURR WALLS OR CONTINUE PLYWOOD TO MAINTAIN THE REQUIRED FLUSH FINISH. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH. PROVIDE BLOCKING FOR ALL ARTWORK, TOWEL BARS AND TISSUE HOLDERS, TYP. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES, UNDER AND AROUND TUB AND SHOWER ENCLOSURES TO A HEIGHT OF 70" MIN. ABOVE THE DRAIN INLET. , OR APPROVED BACKER BOARD UNDER TILE. FINISH MATERIALS FOR ALL BATHS, SHOWERS, WALLS AT SHOWER ENCLOSURES SHALL HAVE A SMOOTH, HARD, NON-ABSORBANT SURFACE SUCH AS TILES/CERAMIC TILES, PORTLANT CEMENT OR EQ. 1. 2. 3. 4. 5. LEGEND SEE A0.00 FOR SYMBOLS NOT SHOWN HERE. FLOOR PLAN GENERAL NOTES (E) CONST. TO BE REMOVED OR NEW MASONRY WALL NEW CONSTRUCTION EXISTING CONSTRUCTION City of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"F.D. F.D. DN DN UP DN DN STAIR 203 WOOD STAIR 106 CONCRETE MUD ROOM 206 STONE CLOSET 205 STONE ENTRY 204 STONE GARAGE 207 CONCRETE MSTR CLOSET 208 CARPET MSTR BATH 201 STONE MASTER BED 202 CARPET T.O. PLY EL. = 99'-7 7/8" V.I.F. T.O. PLY EL. = 100'-0" V.I.F. T.O. SLAB EL. = 99'-7 7/8" V.I.F. GAS FIREPLACE AREA OF WORK BUILT IN BALCONY ABOVE OPEN TO ABOVE REPLACE EXISTING BATHROOM FIXTURES AREA OF WORK PROJECT SCALE MAIN LEVEL DEMOLITION PLAN 1/4" = 1'-0" 17007.00 D-102 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 MAIN LEVEL DEMOLITION PLAN 1/4" = 1'-0" 1 D-102 0 2 4 8 Scale: 1/4" = 1'-0"NDEMOLITION NOTES 1.FURNISH EQUIPMENT AND PERFORM LABOR REQUIRED TO EXECUTE THE CONTRACT DOCUMENTS. 2.PROTECT EXISTING WORK TO REMAIN INCLUDING DUST CONTROL. 3.THE DRAWINGS DO NOT NECESSARILY INDICATE THE FULL EXTENT OF THE WORK TO BE PERFORMED. INSPECT THE EXISTING CONSTRUCTION CAREFULLY TO DETERMINE THE FULL EXTENT OF WORK TO BE PERFORMED AND THE CHALLENGES INVOLVED. 4.DO NOT ALLOWED DEMOLISHED DEBRIS TO ACCUMULATE ON SITE BEYOND A REASONABLE AMOUNT. MAINTAIN PROGRESSIVE DISPOSE OF DEBRIS IN A LEGAL MANNER. 5.REMOVAL OF ALL HAZARDOUS MATERIALS IS THE RESPONSIBILITY OF THE OWNER. SHOULD THE CONTRACTOR ENCOUNTER ANY HAZARDOUS MATERIALS WHILE EXECUTING DEMOLITION, THEY SHOULD CONTACT THE OWNER IMMEDIATELY. 6.VERIFY ALL SALVAGING REQUIREMENTS WITH THE OWNER PRIOR TO DEMOLITION. 7.NOTIFY OWNER 48 HOURS PRIOR TO ANY UTILITY SERVICE DISRUPTION. 8.COORDINATE EXTENT OF ALL STRUCTURAL DEMOLITION WITH THE STRUCTURAL DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND IMPLEMENTATION OF TEMPORARY SHORING AND BRACING AS REQUIRED. 9.VERIFY EXTENT OF WALL AND ROOF REMOVAL WITH STRUCTURAL ENGINEER. 10.PRIOR TO COMMENCEMENT OF DEMOLITION, EXTENT OF STRUCTURE AND/OR FINISH TO BE REMOVED MUST BE VERIFIED WITH BOTH THE OWNER AND ARCHITECT. 11.PROVIDE NECESSARY EROSION CONTROL PER LANDSCAPING OR CIVIL DRAWINGS. LEGEND SEE A0.00 FOR SYMBOLS NOT SHOWN HERE. (E) CONST. TO BE REMOVED OR NEW MASONRY WALL NEW CONSTRUCTION EXISTING CONSTRUCTION AREA OF WORK AREA OF WORK LOWER LEVEL:185 sq ft TOTAL:880 sq ft UPPER LEVEL:435 sq ft MAIN LEVEL:260 sq ft City of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"DN DN UP DN DN STAIR 203 WOOD STAIR 106 CONCRETE MUD ROOM 206 EXISTING STONE CLST 205 EXISTING STONE ENTRY 204 EXISTING STONE GARAGE 207 CONCRETE MSTR CLOSET 208 CARPET MSTR BATH 201 TILE MASTER BED 202 CARPET DN NEW GAS FIREPLACE REPLACE TUB REPLACE SHOWER BUILT IN REPLACE TOILET BENCH NEW BUILT IN NEW BUILT IN EXISTING STAIR TO REMAIN T.O. PLY EL. = 99'-7 7/8" V.I.F. T.O. PLY EL. = 100'-0" V.I.F. T.O. SLAB EL. = 99'-7 7/8" V.I.F. T 1 HR SEP. WALLS & CEILING OPEN TO ABOVE 3'-8"8'-2" 3'-3"4'-6 1/2"4'-3"4'-3"6'-2 1/4"2'-4" 1'-9 1/4"1'-0 3/4"4'-0 3/4"1'-0 3/4"PROJECT SCALE PROPOSED MAIN LEVEL FLOOR PLAN 1/4" = 1'-0" 17007.00 A-102 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 PROPOSED MAIN LEVEL FLOOR PLAN 1/4" = 1'-0" 1 A-102 0 2 4 8 Scale: 1/4" = 1'-0"NALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS FLUSH FINISH. FURR WALLS OR CONTINUE PLYWOOD TO MAINTAIN THE REQUIRED FLUSH FINISH. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH. PROVIDE BLOCKING FOR ALL ARTWORK, TOWEL BARS AND TISSUE HOLDERS, TYP. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES, UNDER AND AROUND TUB AND SHOWER ENCLOSURES TO A HEIGHT OF 70" MIN. ABOVE THE DRAIN INLET. , OR APPROVED BACKER BOARD UNDER TILE. FINISH MATERIALS FOR ALL BATHS, SHOWERS, WALLS AT SHOWER ENCLOSURES SHALL HAVE A SMOOTH, HARD, NON-ABSORBANT SURFACE SUCH AS TILES/CERAMIC TILES, PORTLANT CEMENT OR EQ. 1. 2. 3. 4. 5. LEGEND SEE A0.00 FOR SYMBOLS NOT SHOWN HERE. FLOOR PLAN GENERAL NOTES (E) CONST. TO BE REMOVED OR NEW MASONRY WALL NEW CONSTRUCTION EXISTING CONSTRUCTION City of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"KITCHEN 308 WOOD LIVING 303 WOOD DINING 301 WOOD BED/OFFICE 306 WOOD PANTRY 307 WOOD BATH 304 WOOD STAIR 203 WOOD DECK 302 EXISTING STONE OPEN TO BELOW DN CLOSET 305 WOOD DW REF. GAS FIREPLACE T.O. PLY EL. = 110'-0" V.I.F. AREA OF WORK ROOF BELOW ROOF BELOW ROOF BELOW REPLACE RANGE REPLACE BATHROOM FIXTURES T.O. PLY EL. = 109'-7 3/8" V.I.F. AREA OF WORK AREA OF WORK PROJECT SCALE UPPER LEVEL DEMOLITION PLAN 1/4" = 1'-0" 17007.00 D-103 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 UPPER LEVEL DEMOLITION PLAN 1/4" = 1'-0" 1 D-103 0 2 4 8 Scale: 1/4" = 1'-0"NDEMOLITION NOTES 1.FURNISH EQUIPMENT AND PERFORM LABOR REQUIRED TO EXECUTE THE CONTRACT DOCUMENTS. 2.PROTECT EXISTING WORK TO REMAIN INCLUDING DUST CONTROL. 3.THE DRAWINGS DO NOT NECESSARILY INDICATE THE FULL EXTENT OF THE WORK TO BE PERFORMED. INSPECT THE EXISTING CONSTRUCTION CAREFULLY TO DETERMINE THE FULL EXTENT OF WORK TO BE PERFORMED AND THE CHALLENGES INVOLVED. 4.DO NOT ALLOWED DEMOLISHED DEBRIS TO ACCUMULATE ON SITE BEYOND A REASONABLE AMOUNT. MAINTAIN PROGRESSIVE DISPOSE OF DEBRIS IN A LEGAL MANNER. 5.REMOVAL OF ALL HAZARDOUS MATERIALS IS THE RESPONSIBILITY OF THE OWNER. SHOULD THE CONTRACTOR ENCOUNTER ANY HAZARDOUS MATERIALS WHILE EXECUTING DEMOLITION, THEY SHOULD CONTACT THE OWNER IMMEDIATELY. 6.VERIFY ALL SALVAGING REQUIREMENTS WITH THE OWNER PRIOR TO DEMOLITION. 7.NOTIFY OWNER 48 HOURS PRIOR TO ANY UTILITY SERVICE DISRUPTION. 8.COORDINATE EXTENT OF ALL STRUCTURAL DEMOLITION WITH THE STRUCTURAL DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN AND IMPLEMENTATION OF TEMPORARY SHORING AND BRACING AS REQUIRED. 9.VERIFY EXTENT OF WALL AND ROOF REMOVAL WITH STRUCTURAL ENGINEER. 10.PRIOR TO COMMENCEMENT OF DEMOLITION, EXTENT OF STRUCTURE AND/OR FINISH TO BE REMOVED MUST BE VERIFIED WITH BOTH THE OWNER AND ARCHITECT. 11.PROVIDE NECESSARY EROSION CONTROL PER LANDSCAPING OR CIVIL DRAWINGS. LEGEND SEE A0.00 FOR SYMBOLS NOT SHOWN HERE. (E) CONST. TO BE REMOVED OR NEW MASONRY WALL NEW CONSTRUCTION EXISTING CONSTRUCTION AREA OF WORK AREA OF WORK LOWER LEVEL:185 sq ft TOTAL:880 sq ft UPPER LEVEL:435 sq ft MAIN LEVEL:260 sq ft City of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"DWDW REF FRZ KITCHEN 308 WOOD LIVING 303 WOOD DINING 301 WOOD BED/OFFICE 306 WOOD PANTRY 307 WOOD BATH 304 WOOD STAIR 203 WOOD DECK 302 EXISTING STONE OPEN TO BELOW DN CLOSET 305 WOOD NEW POCKET DOOR ROOF BELOW ROOF BELOW ROOF BELOW SKYLIGHT ABOVE BUILT IN BUILT IN NEW GAS FIREPLACE BUILT IN EXISTING STAIR TO REMAIN ADD NEW DISHWASHER REPLACE KITCHEN APPLIANCES NEW SHOWER REPLACE BATHROOM FIXTURES T.O. PLY EL. = 110'-0" V.I.F. T.O. PLY EL. = 109'-7 3/8" V.I.F. T 1'-9 3/4"1'-9 3/4"4'-0 9/32"10'-8"12'-5 25/32" 7'-1"4'-3 1/2"3'-1 1/2"1'-9 3/4"1'-9 3/4"7'-1 1/2"2'-4" PROJECT SCALE PROPOSED UPPER LEVEL FLOOR PLAN 1/4" = 1'-0" 17007.00 A-103 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 PROPOSED UPPER LEVEL FLOOR PLAN 1/4" = 1'-0" 1 A-103 0 2 4 8 Scale: 1/4" = 1'-0"NALL WALLS WITH SHEAR PLYWOOD SHALL HAVE A CONTINUOUS FLUSH FINISH. FURR WALLS OR CONTINUE PLYWOOD TO MAINTAIN THE REQUIRED FLUSH FINISH. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE FLUSH. PROVIDE BLOCKING FOR ALL ARTWORK, TOWEL BARS AND TISSUE HOLDERS, TYP. PROVIDE WATER RESISTANT GYPSUM BOARD BEHIND ALL PLUMBING FIXTURES, UNDER AND AROUND TUB AND SHOWER ENCLOSURES TO A HEIGHT OF 70" MIN. ABOVE THE DRAIN INLET. , OR APPROVED BACKER BOARD UNDER TILE. FINISH MATERIALS FOR ALL BATHS, SHOWERS, WALLS AT SHOWER ENCLOSURES SHALL HAVE A SMOOTH, HARD, NON-ABSORBANT SURFACE SUCH AS TILES/CERAMIC TILES, PORTLANT CEMENT OR EQ. 1. 2. 3. 4. 5. LEGEND SEE A0.00 FOR SYMBOLS NOT SHOWN HERE. FLOOR PLAN GENERAL NOTES (E) CONST. TO BE REMOVED OR NEW MASONRY WALL NEW CONSTRUCTION EXISTING CONSTRUCTION City of Aspen Received 5/11/17 Building Department If new range hood exhausts greater than 400cfm, interlocked makeup air will be required. 2015 IMC 505.2. 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"F F F S.D. S.D. S.D. S.D. S.D. S.D. WR WR WR WR WRWR BED 101 ADU BED 103 ADU BATH 102 ADU KITCHEN 104 CLOSET 113 ADU CLOSET 105 BATH 111 MEDIA ROOM 107 CRAWL SPACE 108 MECH. ROOM 109 LAUNDRY 110 BUNK ROOM 112 ADU STAIR 106 CLOSET 115 BATH 114 PROJECT SCALE EXISTING LOWER LEVEL RCP 1/4" = 1'-0" 17007.00 D-104 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 EXISTING LOWER LEVEL RCP 1/4" = 1'-0" 1 D-104 LEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE. REFLECTED CEILING PLAN GENERAL NOTES LARGE PENDANT LIGHT FIXTURE F SDCO 8'-0" WALL MOUNTED LIGHT FIXTURE WATER RATED LIGHT FIXTURE EXHAUST FAN SPEAKER CEILING/SOFFIT HEIGHT SYMBOL RECESSED DOWNLIGHT FLORESCENT LIGHT FIXTURE WR 1.ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2.VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3.SEE INTERIOR ELEVATIONS FOR LOCATIONS OF SCONCES, TYP. 4.PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 5.ALL LIGHTING TO MEET 2009 IECC LIGHTING REQUIREMENTS. CEILING MOUNTED SMOKE / CARBON MONOXIDE DETECTOR W/ BATTERY BACKUP SP 0 2 4 8 Scale: 1/4" = 1'-0"NCity of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"W/D W/D F F F SDCO SDCO SDCO SDCO SDCO SDCO WR WR WRWR WRWR BED 101 ADU BED 103 ADU BATH 102 ADU KITCHEN 104 CLOSET 113 ADU CLOSET 105 BATH 111 MEDIA ROOM 107 CRAWL SPACE 108 MECH. ROOM 109 LAUNDRY 110 BUNK ROOM 112 ADU STAIR 106 CLOSET 115 BATH 114 PROJECT SCALE PROPOSED LOWER LEVEL RCP 1/4" = 1'-0" 17007.00 A-104 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 PROPOSED LOWER LEVEL RCP 1/4" = 1'-0" 1 A-104 LEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE. REFLECTED CEILING PLAN GENERAL NOTES LARGE PENDANT LIGHT FIXTURE F SDCO 8'-0" WALL MOUNTED LIGHT FIXTURE WATER RATED LIGHT FIXTURE EXHAUST FAN SPEAKER CEILING/SOFFIT HEIGHT SYMBOL RECESSED DOWNLIGHT FLORESCENT LIGHT FIXTURE WR 1.ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2.VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3.SEE INTERIOR ELEVATIONS FOR LOCATIONS OF SCONCES, TYP. 4.PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 5.ALL LIGHTING TO MEET 2009 IECC LIGHTING REQUIREMENTS. CEILING MOUNTED SMOKE / CARBON MONOXIDE DETECTOR W/ BATTERY BACKUP SP 0 2 4 8 Scale: 1/4" = 1'-0"NCity of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"S.D. S.D. F WR WR STAIR 203 STAIR 106 MUD ROOM 206 CLOSET 205 ENTRY 204 GARAGE 207 MSTR CLOSET 208 MSTR BATH 201 MASTER BED 202 OPEN TO ABOVE PROJECT SCALE EXISTING MAIN LEVEL RCP 1/4" = 1'-0" 17007.00 D-105 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 EXISTING MAIN LEVEL RCP 1/4" = 1'-0" 1 D-105 LEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE. REFLECTED CEILING PLAN GENERAL NOTES LARGE PENDANT LIGHT FIXTURE F SDCO 8'-0" WALL MOUNTED LIGHT FIXTURE WATER RATED LIGHT FIXTURE EXHAUST FAN SPEAKER CEILING/SOFFIT HEIGHT SYMBOL RECESSED DOWNLIGHT FLORESCENT LIGHT FIXTURE WR 1.ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2.VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3.SEE INTERIOR ELEVATIONS FOR LOCATIONS OF SCONCES, TYP. 4.PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 5.ALL LIGHTING TO MEET 2009 IECC LIGHTING REQUIREMENTS. CEILING MOUNTED SMOKE / CARBON MONOXIDE DETECTOR W/ BATTERY BACKUP SP 0 2 4 8 Scale: 1/4" = 1'-0"NCity of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"SDCO SDCO WR WR F SDCO STAIR 203 WOOD STAIR 106 MUD ROOM 206 CLST 205 ENTRY 204 GARAGE 207 MSTR CLOSET 208 MSTR BATH 201 MASTER BED 202 OPEN TO ABOVE PROJECT SCALE PROPOSED MAIN LEVEL RCP 1/4" = 1'-0" 17007.00 A-105 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 PROPOSED MAIN LEVEL RCP 1/4" = 1'-0" 1 A-105 LEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE. REFLECTED CEILING PLAN GENERAL NOTES LARGE PENDANT LIGHT FIXTURE F SDCO 8'-0" WALL MOUNTED LIGHT FIXTURE WATER RATED LIGHT FIXTURE EXHAUST FAN SPEAKER CEILING/SOFFIT HEIGHT SYMBOL RECESSED DOWNLIGHT FLORESCENT LIGHT FIXTURE WR 1.ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2.VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3.SEE INTERIOR ELEVATIONS FOR LOCATIONS OF SCONCES, TYP. 4.PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 5.ALL LIGHTING TO MEET 2009 IECC LIGHTING REQUIREMENTS. CEILING MOUNTED SMOKE / CARBON MONOXIDE DETECTOR W/ BATTERY BACKUP SP 0 2 4 8 Scale: 1/4" = 1'-0"NCity of Aspen Received 5/11/17 Building Department Provide an exhaust fan in the master bath area containing the bathtub and shower. 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"S.D. S.D. SP SP SP SP SP SP F KITCHEN 308 LIVING 303 DINING 301 BED/OFFICE 306 PANTRY 307 BATH 304 STAIR 203 DECK 302 CLOSET 305 SKYLIGHT BEAM BEAM BEAM RANGE HOOD SLOPESLOPESLOPESLOPESLOPE SLOPESLOPE SLOPESLOPESLOPESLOPESLOPE SLOPESLOPE SLOPE SLOPESLOPEPROJECT SCALE EXISTING UPPER LEVEL RCP 1/4" = 1'-0" 17007.00 D-106 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 EXISTING UPPER LEVEL RCP 1/4" = 1'-0" 1 D-106 0 2 4 8 Scale: 1/4" = 1'-0"NLEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE. REFLECTED CEILING PLAN GENERAL NOTES LARGE PENDANT LIGHT FIXTURE F SDCO 8'-0" WALL MOUNTED LIGHT FIXTURE WATER RATED LIGHT FIXTURE EXHAUST FAN SPEAKER CEILING/SOFFIT HEIGHT SYMBOL RECESSED DOWNLIGHT FLORESCENT LIGHT FIXTURE WR 1.ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2.VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3.SEE INTERIOR ELEVATIONS FOR LOCATIONS OF SCONCES, TYP. 4.PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 5.ALL LIGHTING TO MEET 2009 IECC LIGHTING REQUIREMENTS. CEILING MOUNTED SMOKE / CARBON MONOXIDE DETECTOR W/ BATTERY BACKUP SP City of Aspen Received 5/11/17 Building Department 11 1 A C E FBD 5 9 7 8 10 3 6 2 4 41'-0" 3'-9"16'-3"14'-0"2'-10"4'-2"50'-6"6'-0"2'-6"2'-6"6'-6"7'-6"6'-6"5'-6"5'-9"1'-9"6'-0"DWDW REF FRZ SDCO SDCO SP SP SP SP SP SP F WR KITCHEN 308 LIVING 303 DINING 301 BED/OFFICE 306 PANTRY 307 BATH 304 STAIR 203 DECK 302 CLOSET 305 RANGE HOOD EXISTING TO REMAIN EXISTING REPLACE LIGHT FIXTURE EXISTING REPLACE LIGHT FIXTURE BEAM BEAM BEAM SKYLIGHT EXISTING TO REMAIN SLOPESLOPESLOPESLOPESLOPE SLOPESLOPE SLOPESLOPESLOPESLOPESLOPE SLOPESLOPESLOPE SLOPE SLOPEPROJECT SCALE PROPOSED UPPER LEVEL RCP 1/4" = 1'-0" 17007.00 A-106 COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID # 273718295029971 UTE AVENUEC THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE PERMIT SET APRIL 6TH, 2017 PROPOSED UPPER LEVEL RCP 1/4" = 1'-0" 1 A-106 LEGEND SEE COVER SHEET FOR SYMBOLS NOT SHOWN HERE. REFLECTED CEILING PLAN GENERAL NOTES LARGE PENDANT LIGHT FIXTURE F SDCO 8'-0" WALL MOUNTED LIGHT FIXTURE WATER RATED LIGHT FIXTURE EXHAUST FAN SPEAKER CEILING/SOFFIT HEIGHT SYMBOL RECESSED DOWNLIGHT FLORESCENT LIGHT FIXTURE WR 1.ALL DIMENSIONS ARE TO FACE OF FIN., CENTER OF FIXTURE/REGISTER UNLESS NOTED OTHERWISE. 2.VERIFY IN FIELD ALL EXISTING DIMENSIONS. 3.SEE INTERIOR ELEVATIONS FOR LOCATIONS OF SCONCES, TYP. 4.PAINT ALL RECESSED CAN TRIMS/MECHANICAL GRILLES THE COLOR OF THE CEILING IN WHICH THEY APPEAR. 5.ALL LIGHTING TO MEET 2009 IECC LIGHTING REQUIREMENTS. CEILING MOUNTED SMOKE / CARBON MONOXIDE DETECTOR W/ BATTERY BACKUP SP 0 2 4 8 Scale: 1/4" = 1'-0"NCity of Aspen Received 5/11/17 Building Department