Loading...
HomeMy WebLinkAboutFile Documents.971 Ute Ave. (26)KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 1 of 10 CONSTRUCTION MANAGEMENT PLAN FOR 971 Ute Ave Owner: Ajax Holdings Contractor: Kaegebein Fine Homebuilding, LLC 970-379-6228 Safety Officer: Scott McClung 618-4362 Traffic Control Officer: Scott McClung 618 -4362 Erosion Control Officer: Nate Kaegebein _______________________ BUILDING PERMIT NUMBER: Submittal Date: 4.4.17 City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 2 of 10 1. CMP INDEX: 1. INDEX 2 2. PROJECT LOCATION 3 2.1 DISTURBANCE AREA 2.2 LOCATION 2.3 DESCRIPTION 3. PROJECT DOCUMENTATION 3-4 3.1 PERMITS/OTHER DOCUMENTS 3.2 PUBLIC NOTIFICATIONS 3.3 PROJECT SIGN 3.4 CONTACT DESIGNATION 4. PROJECT IMPLEMENTATION 4-6 4.1 DATES OF CONSTRUCTION 4.2 HOURS OF CONSTRUCTION 4.3 SEQUENCE (PHASING) OF CONSTRUCTION 4.4 ADJOINING PROPERTIES 4.5 PROJECT FENCING 4.6 PUBLIC HEALTH AND WELFARE 4.7 NATURAL ENVIRONMENT 5. SITE AND RIGHT OF WAY MANAGEMENT 6-8 5.1 RIGHT OF WAY MANAGEMENT PLAN 5.2 EMERGENCY VEHICLE ACCESS AND ORDINANCE 35 5.3 CONSTRUCTION PARKING DETAILS 5.4 STAGING AREAS 5.5 RIGHT OF WAY LIMITATIONS 5.6 CONSTRUCTION TRAILER, MATERIALS STORAGE, AND WASTE MANAGEMENT 6. TRAFFIC CONTROL 8 6.1 GENERAL 6.2 HAUL ROUTES 6.3 ONSITE VEHICLE LIMITATIONS 6.4 DELIVERY REQUIREMENTS 6.5 TRAFFIC CONTROL PLAN 7. PEDESTRIAN PROTECTION 9 7.1 GENERAL 7.2 LIMITATIONS 8. SEDIMENT AND EROSION CONTROL 9 8.1 REQUIREMENTS 8.2 SMUGGLER MOUNTAIN RESTRICTIONS 9. FUGITIVE DUST CONTROL 9 9.1 FUGITIVE DUST CONTROL PLAN 9.2 REQUIREMENTS 10. EMISSIONS 9-10 10.1 GENERAL 10.2 EMISSIONS FROM DIESEL POWERED ENGINES 11. NOISE SUPRESSION PLAN 10-11 11.1 GENERAL 11.2 NOISE SUPPRESSION PLAN City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 3 of 10 2. PROJECT LOCATION 2.1. DISTURBANCE AREA The total disturbance area of the project will be the entire lot of 0 SF. The home is existing and the project consists of interior remodeling. 2.2. PROJECT VICINITY MAP See attached map. Exhibit “A” 2.3. LOCATION DESCRIPTION Background information: Existing Single Family, Proposed Development Type: Single Family General Information: Remodel of existing interior of home 3. PROJECT DOCUMENTATION 3.1. LIST ALL PERMITS AND PROVIDE ALL COPIES OF PERMITS: Building Permit Electrical Permit Fire Permit Mechanical Permit (HVAC) Mechanical Permit (Fireplace) Plumbing Permit 3.2. PUBLIC NOTIFICATION: The Project representative is Scott McClung of Kaegebein Fine Homebuilding. The Preconstruction meeting is scheduled for _______________2017 at 9 AM and will be scheduled on site. A monthly project report will be posted on site in a receptacle near the construction information sign. All neighbors will be notified in writing 10 days prior to construction. 3.3. PROJECT SIGN Project Name: 971 Ute Ave Building Permit Number: ___________________ City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 4 of 10 General Contractor Name: KAEGEBEIN FINE HOMEBUILDING, LLC General Contractor Contact: Charles Berger General Contractor Phone #: 970-618-7493 Emergency Phone #: 970-379-6228 Sign will be green in color and meet the criteria of City Municipal Code 26.510.030B4. 3.4. CONTACT LIST: Owner: Ajax Holdings LLC Contractor: Kaegebein Fine Homebuilding, LLC 970-379-6228 Safety Officer: Joe Colonna 379-2863 Traffic Control Officer: Joe Colonna 379-2863 Erosion Control Officer: Nate Kaegebein 4. PROJECT IMPLEMENTATION 4.1. DATES OF CONSTRUCTION 8.15.17 – 2.28.17 4.2. HOURS OF CONSTRUCTION Construction hours will comply with section 4.2 of CMP requirements manual, April 2015. 4.3. CONSTRUCTION SCHEDULING AND PHASING This is an approximate 6 month project. Demo: 1.0 months Interior rough in: 2.0 months Interior/Exterior finishes: 3.0 months 4.4. ADJOINING PROPERTIES City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 5 of 10 Will be unaffected other than a dumpster and portable toilet in the driveway. All other work will be interior and possibly a roof replacement. 4.5. PROJECT FENCING A six foot green screen chain link fence will also be installed around the perimeter of the construction area. See CMP site plan. 4.6. PROJECT RESPECTS PUBLIC HEALTH AND WELFARE This construction project “shall uphold utmost respect to public health and welfare”. 4.7. NATURAL ENVIRONMENT A tree removal permit will be not be necessary. 5. SITE AND RIGHT OF WAY MANAGMENT 5.1. RIGHT OF WAY MANAGEMENT PLAN If the ROW space is deemed necessary and/or practical a temporary encroachment permit will be submitted at least 10 working days prior to the date which it would be used. See CMP site plan. 5.2. EMERGENCY VEHICLE ACCESS Emergency vehicle access will not be inhibited. The site is readily accessible from Ute Ave. 5.3. CONSTRUCTION PARKING DETAILS There is limited parking on site. Approx. 2-3 spaces will be utilitized thru out the project. All construction parking will be handled with parking permits purchased by the owner. (See CMP site plan) City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 6 of 10 This project will utilize the Carpool Program and project shuttle during the phases of construction when this is practical and possible. Parking passes will be issued for those vehicles which are unable to carpool or park in designated construction parking. 5.4. SITE LOCATIONS FOR STAGING MATERIALS The minimal on site staging area will be utilized carefully. All possible deliveries will be thru Ute Ave. (see CMP plan) Export of excavation truck trips: 0 Concrete truck trips: 1 Steel delivery truck trips: 1 Lumber delivery truck trips: 4 Import of backfill truck trips: 0 Misc. finish material truck trips: 25 Landscape truck trips: 1 Total truck trips: 32 5.5. RIGHT OF WAY LIMITATIONS A. The site does not fall with the seasonal limitations for temporary encroachments. 5.6. CONSTRUCTION TRAILER, MATERIALS STORAGE, AND WASTE MANAGEMENT No loose job materials will be stored on Ute ave. The existing driveway and garage will be used On site recycling separation will occur on this project per the CMP manual section 5.6. During demolition, concrete and scrap metal will be sorted and kept separate on site in designated areas. Any trash receptacle that is used for food refuse will be constructed in such a manner to render it bear proof. City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 7 of 10 A hazardous material spill cleanup kit will be on-site if specified by the City Engineer. 6. TRAFFIC CONTROL 6.1. GENERAL All traffic control operation shall be managed by the designated certified traffic control supervisor. 6.2. PROJECT HAUL ROUTES Heavy haul routes will not be necessary for this project. 6.3. ONSITE VEHICLE LIMITATIONS Max: 40 ft and 48,000 pounds 6.4. DELIVERY REQUIREMENTS Road closures will not be required during construction operations. If it is determined that a road closure is required, the proper permit will be obtained from the City of Aspen Engineering Dept. The site has capacity for one delivery at a time and will be limited to the hours of construction. There will be no exceptions to the delivery schedule. 6.5. TRAFFIC CONTROL PLAN A traffic control plan will be provided if requested by City Engineer. 7. PEDESTRIAN PROTECTION No pedestrian sidewalks will be impacted by this construction project. 8. SEDIMENT AND EROSION CONTROL 8.1. REQUIREMENTS N/A City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 8 of 10 8.2. SMUGGLER MOUNTAIN RESTRICTIONS This site is not on smuggler mountain. 9. FUGITIVE DUST CONTROL The project will utilize the following fugitive dust control measures.  An onsite pressure washer shall be used to keep the public ROW clean.  Vehicle speeds will be kept to 15 MPH 24 HOUR EMERGENCY CONTACT: Charlie Berger 970-618-7493 10. EMISSIONS 10.1. GENERAL All vehicles and equipment used on site shall be properly marinated such that the engines will function within manufactures standards or parameters. 10.2. EMISSIONS FROM DIESEL POWERED ENGINES Emissions from diesel engines operated within the city of Aspen shall be a shade or density no darker than 40% opacity except for starting motion no longer than 10 seconds or for stationary operation not exceeding 10 seconds. City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 9 of 10 11. NOISE SUPPRESSION 11.1. GENERAL All Construction equipment shall b e adequately muffled and maintained to minimize project noise. 11.2. NOISE SUPPRESION PLAN All activity that generates noise in excess of 80 decibels will be restricted to operating between the hours of 9AM and 5PM Monday thru Friday. 11.3. CONTINUED NOISE MONITORING Continued noise monitoring will be installed if required by the Engineering dept. 11.4. REQUIREMENTS FOR ACTIVITIES EXCEEDING 80 DECIBELS 1. Any work producing noise levels over 80 decibels is not permitted to commence until after 9:00 AM and is not permitted on Saturdays. This does not restrict quiet work inside and outside that does not require a power source, including a battery, on Saturday. 2. All neighbors within three hundred feet of the project will be notified. Informing them of the kinds of equipment, expected noise levels and duration of work. COMMUNICATION WITH THE NEIGHBORS WILL BE MAINTAINED AT ALL TIMES WITH THE INTENT OF REDUCING COMPLAINTS. 3. Equipment will be operated in accordance with the manufacturer’s specificiations and with all standard manufacturers mufflers and noise reducing equipment in use and properly operating condition. 4. Notices to inform works, including sub contractors, will be posted about basic noise requirements, as well as specific noise restrictions. 5. Table 1 of Appendix C will be followed for noise barriers. 6. Portable loud equipment will be moved to different sides of the property to reduce noise impact on individual neighbors. 7. Radios will not be on prior to 8:00 AM. 11.5. SPECIFIC RESTRICTIONS RELATED TO MANUFACTURING ON SITE City of Aspen Received 5/11/17 Building Department KAEGEBEIN FINE HOMEBUILDING, LLC  PO Box 1570, Carbondale, CO. 81623  Phone: (970) 510‐5797 Fax: (970)963‐1392  office@kfhomebuilding.com  www.kfhomebuilding.com    Page 10 of 10 There will be no manufacturing on site as described in this section of the manual. EXHIBIT “A” Vicinity Map City of Aspen Received 5/11/17 Building Department