Loading...
HomeMy WebLinkAboutFile Documents.232 E Main St.0063-2021-BCHO (3) Revision Summary Chase – Main & Monarch 232 E Main St, Aspen, Colorado 81611 ka v:\2227\active\222769128\architecture\record\3_permit\20210928_permit amendment drawings\50.revision summary.232 e main st.2021.09.24.docx To: John Barker From: Andrew Kukhar Community Development 130 S Galena St, 3rd Floor Aspen, Colorado 81611 Stantec Architecture Inc. 224 S Michigan Ave, Suite 140 Chicago, IL 60604 File: Permit Number: 222769128 0005-2021-BCOM Date: September 24, 2021 Reference: Chase – Main & Monarch – Revisions Summary Narrative to drawing revisions clouded and noted under delta 3 dated 08/06/2021 ARCHITECTURAL A0.0 COVER SHEET • Drawing Index updated A0.1 SITE PLAN • No Change A0.2-4 ACCESSIBILITY REQUIREMENTS • No Change A0.7 CODE ANALYSIS AND EGRESS PLAN • Updated code sheet per new layout. A1.1 FLOOR PLAN • Updated floor plan per new layout. • New office PCS 1 (105) added in unutilized part of vestibule. • PCS 3 (112) reconfigured into a conference room Conf 4 (112). • Old Conference room 113 reconfigured into (2) small offices – PCS5 (113) and PCS (114) • Closets removed at the end of office corridor (109) • Restroom 115 & 116 layout adjusted to fit with new layout. • Additional teller window added in Printer (106) • Printer location adjusted to work with new layout. • Water Fountain location adjusted to work with new layout. • Janitor closet was reduced in size to allow for new layout adjustments. • Lounge millwork adjusted for new layout. Same equipment from approved set to remain. • (1) Lobby (102) ATM removed per new layout. 10/05/2021 September 24, 2021 John Barker Page 2 of 6 Reference: Chase – Main & Monarch – Revisions Summary ka v:\2227\active\222769128\architecture\record\3_permit\20210928_permit amendment drawings\50.revision summary.232 e main st.2021.09.24.docx A1.2 FINISH PLAN • Existing finished to remain per approved set, adjusted per new layout. • Community wall in Living Room (104) bumped out and finished with PT-501. A1.2.1 INTERIOR FINISH AND MATERIAL SCHEDULE • No change A1.3 FURNITURE AND EQUIPMENT PLAN • Furniture and Equipment Plan updated to reflect A1.1 Floor Plan changes • Living Room (104) furniture updated per new furniture specs and credenza added at community wall. A1.3.1-2 FURNITURE AND EQUIPMENT SCHEDULES • Schedules updated to reflect the new equipment and furniture specs. A1.4 REFLECTED CEILING PLAN • Reflected Ceiling Plan updated to reflect A1.1 Floor Plan Changes. • Living Room (104) floating ceiling elements and recessed lights removed from the ceiling to expose the natural finish of CLT panels. Linear light fixtures added to match the existing office linear pendant fixtures. • Recessed light fixture added at new Teller station. A1.4.1-2 CEILING DETAILS • No Change A1.4.3 USG ENSEMBLE CLOUD SYSTEM DETAILS • Sheet removed, this system is no longer utilized in the Living Room (104) A1.5 ROOF PLAN • Split System condenser located on roof to allow for proper clearance in relation to field installed RTU units. A2.0 WALL TYPES AND DETAILS • WQ and WJ wall types updated to reflect full height partitions to structure above. • WN partition type updated to reflect existing core and shell conditions. A2.1 DOOR AND WINDOW SCHEDULE • Vestibule Storefront elevation updated to reflect the layout updates in the vestibule. • This storefront is within the vestibule and exterior façade will not be affected. 10/05/2021 September 24, 2021 John Barker Page 3 of 6 Reference: Chase – Main & Monarch – Revisions Summary ka v:\2227\active\222769128\architecture\record\3_permit\20210928_permit amendment drawings\50.revision summary.232 e main st.2021.09.24.docx A2.2 HARDWARE SCHEDULE • No Change A3.0-1 BUILDING ELEVATIONS • No Change A3.2 BUILDING SECTIONS • Detail 1 updated to reflect (2) Teller windows. A4.0 EQUIPMENT WALL SECTION • AHD enclosure updated to reflect construction of enclosure. A4.1 EQUIPMENT DETAILS • Details 4 and 10 revised to reflect adjusted layout of ATMs within lobby and Vestibule. Screen direction maintains to the interior of the space. A5.1.1 ENLARGED RESTROOM PLAN AND ELEVATIONS • Updated restroom floor plan per revised layout. • Updated elevations to reflect floor plan updates. A5.1.2 INTERIOR ELEVATIONS • 24 HR Vestibule elevations updated to reflect plan revisions. • Teller elevations updated to reflect plan revisions. • Lounge updated to reflect plan revisions. A5.1.3 INTERIOR ELEVATIONS • Office elevations updated to reflect plan revisions. A5.1.4 INTERIOR ELEVATIONS • Lobby and Living room elevations updated to reflect plan revisions. A5.2 INTERIOR CONSTRUCTION DETAILS • Detail 9 – Typical Brim Wall Detail updated to reflect height revision • Detail 7 – Typ. AHD Millwork Enclosure Corner Detail A5.2.1 DIGITAL DISPLAY WALL DETAILS • No change 10/05/2021 September 24, 2021 John Barker Page 4 of 6 Reference: Chase – Main & Monarch – Revisions Summary ka v:\2227\active\222769128\architecture\record\3_permit\20210928_permit amendment drawings\50.revision summary.232 e main st.2021.09.24.docx A5.3 TELLER DETAILS • Details 1, 2, and 3 - updated to reflect addition of (1) teller window. • Detail 6 – Standard Teller window section added. • Detail 9 – Standard Lighting heights added. • Detail 10 – Standard DAB layout added. A5.4 MILLWORK SECTIONS • No change A5.5 COMMUNITY DISPLAY DETAILS • Detail 1 – Community wall plans and elevations updated to reflect plan revisions. A5.5.1 CAFÉ MILLWORK SECTIONS • Sheet removed. No longer used on the project. Part of furniture package. A5.6 INTERIOR DETAILS • No change A5.7 NANA WALL SYSTEM DETAILS • No change A5.7.1 NANA WALL SYSTEM DETAILS • No change STRUCTURAL NO CHANGES ELECTRICAL E1.0 LIGHTING POWER PLAN • Key notes updated to reflect floor plan updates and power/data locations. E1.2 LIGHTING PLAN • Lighting Plan updated to reflect floor plan layout updates. • Lighting control notes added to reflect updated Building Management System equipment. 10/05/2021 September 24, 2021 John Barker Page 5 of 6 Reference: Chase – Main & Monarch – Revisions Summary ka v:\2227\active\222769128\architecture\record\3_permit\20210928_permit amendment drawings\50.revision summary.232 e main st.2021.09.24.docx E1.3 ELECTRICAL ROOF PLAN • Electrical connections updated to reflect updated Split System condenser location on roof. E2.0 SECURITY PLAN • No Change E3.0 ELECTRICAL RISER DIAGRAM • No Change E4.0 ELECTRICAL SCHEDULES • No Change • E5.0 BMS CONTROL DIAGRAMS • No Change E5.1 ELECTRICAL DETAILS • No Change E6.0 ELECTRICAL ENERGY COMPLAINCE FORMS • Comcheck updated to reflect floor plan updates and lighting locations. • Exterior façade was not affected by interior layout updates. MECHANICAL M0.1 MECHANICAL NOTES AND SCHEDULES • Schedules and notes updated to reflect the floor plan revisions. M0.2 MECHANICAL SPECIFICATIONS • No Change M1.0 MECHANICAL CONTROL PLAN • VAV box locations updated to reflect the floor plan revisions. • FC-1 relocated to vestibule within the AHD enclosure to avoid penetrations through sheer masonry wall. • FC-2 relocated to adjacent wall. • Control notes updated to reflect the revised controls with new BMS system specifications. 10/05/2021 September 24, 2021 John Barker Page 6 of 6 Reference: Chase – Main & Monarch – Revisions Summary ka v:\2227\active\222769128\architecture\record\3_permit\20210928_permit amendment drawings\50.revision summary.232 e main st.2021.09.24.docx M1.1 MECHANICAL FLOOR PLAN • Mechanical distribution layout was updated to reflect floor plan revisions. • FC-1 location updated to reflect the revised location. M1.2 MECHANICAL ROOF PLAN • Split system locations updated to reflect the existing RTU installed locations to maintain required maintenance clearances. M2.1 MECHANICAL DETAILS • Condenser stand specification added per core and shell approval for mounting. PLUMBING P1.1 PLUMBING FLOOR PLAN • Plumbing locations updated to reflect floor plan revisions. P1.2 PLUMBING ROOF PLAN • Venting location on roof was updated to reflect as-built condition in field. FIRE PROTECTION FP1.1 FIRE PROTECTION PLAN • Sprinkler head layout updated to reflect the floor plan revisions. END OF LIST Stantec Architecture Inc. Andrew Kukhar Phone: (312) 213-6120 Andrew.kukhar@stantec.com 10/05/2021