HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0111.2018 (94).ARBKPROJECT ADDRESS:
Parcel ID #: Permit Number:
CONTACT INFORMATION :
Owner:
Name:City:Highland Park
Address:State:Illinois
Email:Zip Code:60035
Phone: Cell Phone:773-505-0807
Owner's Representative :
Name:City:Basalt
Address:State:Colorado
Email:Zip Code:81621
Phone: Cell Phone:
`
A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool, spa, and solar/GSHP information:
Do you have snowmelt or a spa that has been exempted by the buiding official?
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
To be Demoed 728.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Existing to Remain -728.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New (non-exempt)1633.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New (exempt)0.00 sqft 0.00 sqft 0.00 sqft
Total New 1633.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total on site 905.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
Total Snowmelt on site
Boiler Efficiency 95.0%100%95.0%100.0%
Mitigation Payment -$ -$
Total Payment for Mitigation:32,389.47$
B.ON-SITE RENEWABLE CREDITS
Supplemental System REMP Credit
Use PV Worksheet Photovoltaic System 51,605.24$
Use Thermal Worksheet Hot Water Panels -$
Use GSHP Cert Ground Source Heat Pump -$
Other Approved System -$
Total Mitigation Credits:51,605.24$
Onsite Renewable Offsets:How many KiloWatts of PV (solar electric) would I need? 4.72
or How many square feet of SHW (solar hot water) would I need?144.18
R-REMP Payment:-$
Amount Previously Paid on This Permit:
-$
Refund (includes minus $750):-$
C. PREPARED BY:Date:10/9/2018
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
bsilverstein@mainholdingsllc.com
greese@ccyarchitects.com
Bill & Karyn Silverstein
1569 Forest Ave
2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
City of Aspen Version 11.3 UpdAted deCember 13, 2017
905 Chatfield Rd. Aspen, CO 81611
273502402004
970-845-7910 x304 - jeff@raderengineering.com
TOTAL R-REMP PAYMENT:
CCY Architects: Gage Reese
905.00 sqft
228 Midland Ave Box 529
Jeff Herschel
M001, M101
970-927-4925
$32,389.47
Yes (enter sqft below on the exempt row)No
JH 1/22/19
Parcel ID #:
Collector
Aspect, Degress
from True South
Collector Tilt,
Degrees From
Horizontal
Solar
Orientation
Adjustment
Factor
DC side capacity
(kW)
Inverter capacity
(kW)
kW for
credit
kW Mitigation
Credit
Collector Group 1 165 3.6 87.00%8.64 10 8.64 7.52 kWCollector Group 2 87.00%0 0.00 kWCollector Group 3 87.00%0 0.00 kWCollector Group 4 87.00%0 0.00 kWCollector Group 5 87.00%0 0.00 kWCollector Group 6 87.00%0 0.00 kWCollector Group 7 87.00%0 0.00 kWCollector Group 8 87.00%0 0.00 kWCollector Group 9 87.00%0 0.00 kWCollector Group 10 87.00%0 0.00 kWCollector Group 11 87.00%0 0.00 kWCollector Group 12 87.00%0 0.00 kWCollector Group 13 87.00%0 0.00 kWCollector Group 14 87.00%0 0.00 kWCollector Group 15 87.00%0 0.00 kWCollector Group 16 87.00%0 0.00 kWCollector Group 17 87.00%0 0.00 kWCollector Group 18 87.00%0 0.00 kWCollector Group 19 87.00%0 0.00 kWCollector Group 20 87.00%0 0.00 kW
Total:7.52 kW
$ Mitigation Credit:51,605.24$
Instructions:
1)
2)
3)DC side capacity is the total labled panel output kW in a group.
4)Inverter capacity is the recommended input power in kW of your inverter(s).
5)
6)
7)
8)
PREPARED BY:Date:
Print Name:
Signature:
Phone & EMail:
REVIEWED:Date:
PV WORKSHEET
City of Aspen Version 11.3 UpdAted deCember 13, 2017
Permit Number: 0111.2018.ARBK273502402004
Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
PROJECT ADDRESS:
The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you
might have just one group.
905 Chatfield Rd. Aspen, CO 81611
The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit
You will be given credit for the lesser of the labeled panel output or the inverter.
The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
X1A0T