This certificate issued pursuant to the requirements of the 2015 edition of the International Building
Code, section 111. It certifies that at the date of issuance, the structure as described below was in
compliance with the various resolutions and ordinances regulating building construction and use in this
jurisdiction.
Use Classification: COMM
Building Permit: 0014.2017.ACBK
Legal Description: SUB: ASPEN MEADOWS LOT: 1-A
Building Address: 845 MEADOWS RD
ASPEN, CO 81611 -
Owner of Building: ASPEN INSTITUTE
Owner Address: 1000 N THIRD ST
ASPEN, CO 81611
Group: A2, B, S1
Type of Construction: VB
--'1='-
Use Zone: R-61PD
Description:
owl
BASEMENT:
STAFF BREAK ROOM, 2 STAFF LOCKER ROOMS, 2 MECHANICAL ROOMS,
STORAGE ROOM, 2 BAR STORAGE ROOMS, 2 KITCHEN STORAGE ROOMS,
EQUIPMENT STORAGE ROOM, BOILER ROOM, ELECTRICAL ROOM,
COMMUNICATIONS ROOM, WALK-IN REFRIGERATOR, WALK-IN FREEZER,
ELEVATOR
LOWER:
2 DINING AREAS, MEETING ROOM, KITCHEN, WOMEN'S BATHROOM, MEN'S
BATHROOM, INFORMATION TECHNOLOGIES/AUDIO VISUAL ROOM, SERVING
ROOM, FIRE CONTROL ROOM
UPPER:
ENTRY/LOBBY, RECEPTION AREA, OFFICE, LOUNGE, DINING AREA, KITCHEN,
WOMEN'S BATHROOM, MEN'S BATHROOM, 2 OUTDOOR DINING AREAS
Comments:
BUILDING INCLUDES:
41CC A117.1 BATHROOMS
NFPA 13 FIRE SUPPRESSION SYSTEM
Restrictions on reverse side:.
ff
Temporary Certificate of Occupancy
Aspen Community Development Department
Restrictions:
THE FOLLOWING REFERRAL DEPARTMENT ITEMS SHALL INSPECTED AND APPROVED ON
OR BEFORE OCTOBER 1, 2018 OR THIS TEMPORARY CERTIFICATE OF OCCUPANCY (TCO)
BECOMES NULL AND VOID:
HPC & ZONING: The Applicant shall resolve the following in order to receive a Final Inspection and
Certificate of Occupancy (CO) approval from the City of Aspen Community Department.
1. Revise a gutter installed on the front of the building from Kstyle to Box style.
2. Provide more information and potentially revise the location of a security camera that has
been installed on the front of the building.
3. Provide more information about speakers that are proposed to be installed in the
landscaping in front of the building.
4. Chiller Unit CH-1 will be lowered so that the height of the unit above the surrounding roof
is no more than 7' and this height will be verified by SGM
ENGINEERING: The Applicant shall provide the following in order to receive a Final Inspection and
Certificate of Occupancy (CO) approval from the City of Aspen Engineering Department.
1. All areas must be landscaped per the approved plans.
2. All drainage features must be installed per the approved plans including swales.
3. All temporary erosion control devices shall be removed.
4. The Applicant shall submit an As -Built survey of all drainage features on the property.
5. Submit a Grading and Drainage Certificate signed by the Engineer of Record.
6. Submit a video of any connections made to the City of Aspen infrastructure
demonstrating that the system is clean and in sound condition.
7. Provide the City of Aspen with an Operations and Maintenance Plan and Agreement
signed by the property owner.
8. All Right of Way improvements including sidewalks, cum/gutter, and any other approved
appurtenances must be completed.
Chief Building Offic' ate