Loading...
HomeMy WebLinkAboutCO.45 Callahan Ct.0014.2017.ACBKTemporary Certificate of Occupancy Aspen Community Development Department This certificate issued pursuant to the requirements of the 2015 edition of the International Building Code, section 111. It certifies that at the date of issuance, the structure as described below was in compliance with the various resolutions and ordinances regulating building construction and use in this jurisdiction. Use Classification: COMM Building Permit: 0014.2017.ACBK Legal Description: SUB: ASPEN MEADOWS LOT: 1-A Building Address: 845 MEADOWS RD ASPEN, CO 81611 - Owner of Building: ASPEN INSTITUTE Owner Address: 1000 N THIRD ST ASPEN, CO 81611 Group: A2, B, S1 Type of Construction: VB --'1='- Use Zone: R-61PD Description: owl BASEMENT: STAFF BREAK ROOM, 2 STAFF LOCKER ROOMS, 2 MECHANICAL ROOMS, STORAGE ROOM, 2 BAR STORAGE ROOMS, 2 KITCHEN STORAGE ROOMS, EQUIPMENT STORAGE ROOM, BOILER ROOM, ELECTRICAL ROOM, COMMUNICATIONS ROOM, WALK-IN REFRIGERATOR, WALK-IN FREEZER, ELEVATOR LOWER: 2 DINING AREAS, MEETING ROOM, KITCHEN, WOMEN'S BATHROOM, MEN'S BATHROOM, INFORMATION TECHNOLOGIES/AUDIO VISUAL ROOM, SERVING ROOM, FIRE CONTROL ROOM UPPER: ENTRY/LOBBY, RECEPTION AREA, OFFICE, LOUNGE, DINING AREA, KITCHEN, WOMEN'S BATHROOM, MEN'S BATHROOM, 2 OUTDOOR DINING AREAS Comments: BUILDING INCLUDES: 41CC A117.1 BATHROOMS NFPA 13 FIRE SUPPRESSION SYSTEM Restrictions on reverse side:. ff Temporary Certificate of Occupancy Aspen Community Development Department Restrictions: THE FOLLOWING REFERRAL DEPARTMENT ITEMS SHALL INSPECTED AND APPROVED ON OR BEFORE OCTOBER 1, 2018 OR THIS TEMPORARY CERTIFICATE OF OCCUPANCY (TCO) BECOMES NULL AND VOID: HPC & ZONING: The Applicant shall resolve the following in order to receive a Final Inspection and Certificate of Occupancy (CO) approval from the City of Aspen Community Department. 1. Revise a gutter installed on the front of the building from Kstyle to Box style. 2. Provide more information and potentially revise the location of a security camera that has been installed on the front of the building. 3. Provide more information about speakers that are proposed to be installed in the landscaping in front of the building. 4. Chiller Unit CH-1 will be lowered so that the height of the unit above the surrounding roof is no more than 7' and this height will be verified by SGM ENGINEERING: The Applicant shall provide the following in order to receive a Final Inspection and Certificate of Occupancy (CO) approval from the City of Aspen Engineering Department. 1. All areas must be landscaped per the approved plans. 2. All drainage features must be installed per the approved plans including swales. 3. All temporary erosion control devices shall be removed. 4. The Applicant shall submit an As -Built survey of all drainage features on the property. 5. Submit a Grading and Drainage Certificate signed by the Engineer of Record. 6. Submit a video of any connections made to the City of Aspen infrastructure demonstrating that the system is clean and in sound condition. 7. Provide the City of Aspen with an Operations and Maintenance Plan and Agreement signed by the property owner. 8. All Right of Way improvements including sidewalks, cum/gutter, and any other approved appurtenances must be completed. Chief Building Offic' ate Stephen Kampe 11