Loading...
HomeMy WebLinkAboutFile Documents.820 E Cooper Ave.0242.2018 (4).ARBKXSVXXXX1.632.7016.5016.503.7525.0011.2510/04 /18JH 10/4/18JH 10/4/18JH 10/4/18AS10/09R/MF434DAM 10/9/18 ADDRESS: 2c' (c4FiCov PERMIT NUMBER: ��n An Ar rwuTar r�ra mr �r�n w I.VIVIIVIVIV I I I ULVCLVI'IVIEIV I UErmni MEN BUILDING PERMIT CONTACT SHEET C,,,, FOR PLAN REVIEW QUESTIONS Name Phone E-mail FOR INSPECTION QUESTIONS Name Phoro E-mail Naaame = u Cr Ph.. fj0-457 -SrG 33 an Phone 4Yo-4d 7' L33 Atl�r¢55 '( ZO yy fn�VS.. Cep ar"24 yzt— stance e CEP 8 /6 11 '-Dan,, .. /r.-. �✓ (u nn co ^-N 0 Name / Phone 4'76-4 G 4-S'6S7 Cell PhonIqn^4G j M ling rl 2t /� �s: A9�resa 1 L(J L I/r �/L/1 S"f IY F CIN S ne -� StlM1 Cr) LP 9I6 I I y caw. ,ce APPk [CATION BEST CONTACT Name r,_ Phone all Phon. aSMIng Po /3 (sw✓ o>.n at,r- �� scare co zlv fR / AUarev, /t5 Name Phone Call Phone Addrei oN sun LP nasals: CIVIL ENGINEER OF ••r Name Phone Cell Phone Mress oN srere lip E-mail Address STRUCTUAL ENGINEER OF ••• Name Morro Call Phone Aware: chv dare Dv E mall Aaamas GENERAL CONTRACTOR xame Phone 4G8-46071 Call Phone QOQ-4OZ—(A aC n�dr'e�s ary S n srarc /,.O ZIP & I G ( Z 1pp& fri �0��%✓ 11� mail /'��•-� f FsJUe .../1 .— C.—Ognq ja ¢ .'Ko-1 � =Ca INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.:spenpitkin.com/Departments/Community-Development-Forms/ to do so. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance Of construction. It is my responsibility to review the approved plans and any Comments that are contained t a d�hatthe structure an r roje in compliance with all applicable codes. Q� rAnaarnr FC VE Signalare OL ` I / _� Dace k. JD ❑ Check if you are a to d can builder (single-family homes only). You must take a test and compl a the o� davit. kpa1,r/�JN�Ia}�Qd{Ir� (CITY USE ONLY) Owner builder approved by: Date: Nmnav 0111h♦?�� CITY OF ASPENAugnalgatl 130 S. GALENA ST I AS 1 ADDRESS: ZO Ea.+—f G6o v PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT SCOPE OF WORK CHECKLIST TIRCMU� mj LAND USE QUESTIONS If you check any of the boxes below, please consult with the Planner of the Day (planneroftheday@gmail.com) before submitting your permit application. Does your permit involve any of the following? Part of an approved COA Land Use Review Work affects net leasable, net livable, or non -unit space Work involves lot splitting or combining a lot ❑i' Work involves exterior of structure Changing the number of residential units Changes to number or location of onsite parking ADDITIONAL SCOPE OF WORK QUESTIONS Does your permit involve any of the following? Exterior lighting added or changed Work involves roof penetrations Work adds removes, or changes plumbing tiixtures Disturbs 1,000 sq ft or more of soil within 12 months Work occurs in public right of way Work affects trees or occurs within the dripline of a tree 13�work involves Landmark Parcel or Historic District ❑Located in 100-year flood plain or within 100' of high water mark Work involves changes in occupancy to structure Changes to elevator or stair configuration ❑ Changes to the use of existing structure or space ❑ Work involves exterior wall penetrations Work involves digging or excavation Work involves restaurant or food service Affects parking spaces/meters, loading zones, or Adding structures or systems over utility lines Work within City Mall boundaries ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM Mr R.a All applications for a building permit within the City of Aspen are required to Include a certification of cc with applicable covenants and homeowner association policies. The certification must be signed by the owner or attorney representing the property owner. The following certification shall accompany the apl fora permit. noonrcc ��U �w3� �oa�aJ uema I, the property owner, certify as follows: (pick one) O" This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the Improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not Interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document Is a public document. Owner Signature l=J Z \ Date Owner Printed Name 1�b1nn>rdt OR Owner's Attorney Signature Date Owner's Attorney Printed Name PERMIT BUILDING CODE INFORMATION ❑ 2015 IRC 1 O 2015 IBC IEBC O Other (Please Explain) 102015 Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted I and Amended) Fire Sprinkler System I Existing? Ono I Required? ONo I Type ❑ NFPA 13 ❑ NFPA 13 R ❑ NFPA 13 D Type Of Construction O VA O VBO IV O IIIA ❑ IIIB O IIA O 1113 O IA O IB IFire Alarms Installed O Yes No Required Special Inspections O High -Strength Bolting ❑ Epoxy Anchors ❑ Structual Steel Welding ❑ Permanent Micropiles O Sprayed Fire -Resistants ❑ Other Energy Code Compliance ❑ Prescriptive Table ❑ Other ❑ RESCheck UA Alternative ❑ COMCheck UA Alternative Exterior Energy Use Total Approved On -Site Snowmelt Spa Pool (Existing + New) Building Type/ 1 13 A_ O B ❑ F_ ❑ E ❑ R_ I O'One Family ❑ Two Family Occupancy Group1B C O B (A <50) ❑ H_ ❑ M OS _ R C 13 Townhouse ❑ I O U UNIT DESCRIPTION AS PROPOSED Gross Area of Building: Gross Area of Unit: Occupant Load: # Stories Above Grade 7- # Stories Below Grade Attached Garage Detached Garage Carport Parking Spaces_ Parking Spaces_ Parking Spaces_ # Bedrooms Z # Full Baths ! Deck Area # 3/4 Baths / # 1/2 Baths # Kitchens I # Wood Fireplaces_ # Gas Appliances # Gas Logs_ ADU BUILDING DESCRIPTION Is there an ADU? O Yes ❑ No # Living Rooms_ # Kitchens _ # Full Baths # 3/4 Baths # 1/2 Baths # Bedrooms # Other Rooms (List) BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Main Level 2nd Floor 3rd Floor Additional FMINGDEPARTMENT IiaaIT, taImtAdBat# COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND CHECKLIST era ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days, vreeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989 "ban" on asbestos -containing materials is commonly misunderstood. In fact, in 1991 the u.s. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule" and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos -containing product categories was set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑ Yes No Residential: Will you be removing more than 32 sq ft, 50linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑YesONO Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans Indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.htmi for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above information is true and co pet . CwL�tiolottjS Owner O t Phone # ��11 i o r18q 4 L 33 Applicant (print name) Phone# 1-101' f$ L{ L33 Applicant Signature,//1/ Date „C^ Please call the City of Aspen Environmental Health Department at 920-5039 at any time1�iriJ about asbestos, interpreting your test results, or other matters. BUILDING ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFADAVIT uea a« AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R308.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy Indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that this document is a public document. Owner Signature: nDate: '911'fl/g Owner Printed Name: Layy eve G . ? 1m,My or, Authorized Agent Signature: Date: Authorized Agent Printed Name: SEP 18 2018 ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY T.a Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi -family, lodging, and mixed -use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway., Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope (if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each obsgrygdgive y�jA Additional roof plans showing location of measurements may be necessary. RCV C,�r 6V