Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.814 W Bleeker St.0299.2017 (44).ARBK
Parks Comments 814 W Bleeker, Unit A5 Subject:NotAComment, please flatten Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:46:39 AM Tree Planting Specifications: See Markup NotAComment, please flatten (4) Subject:NotAComment, please flatten Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:46:24 AM Tree Protection Zone: See Markup $JUZPG"TQFO5SFF1MBOUJOH4QFDJGJDBUJPOT Trunk caliper shallmeet ANSI Z60 currentedition for root ball size. Modified soil. Depthvaries. (See soil preparationplan). Finished grade. Bottom of root ball rests onexisting or recompactedsoil. Central leader. (See crownobservations detail). SECTION VIEW 5HPRYHRIEXUODSDQGEDVNHWZLUH Round-topped soil berm 4" high x 8" wideabove root ball surfaceshall be constructed aroundthe root ball. Berm shallbegin at root ball periphery. Top of root ball shall be flush withfinished grade. Prior to mulching, lightly tamp soilaround the root ball in 6" lifts tobrace tree. Do not over compact.When the planting hole has beenbackfilled, pour water around theroot ball to settle the soil. 4" layer of mulch.No more than 1" of mulch ontop of root ball. (Seespecifications for mulch). Notes:1- Trees shall be of qualityprescribed in crownobservations and rootobservations details andspecifications. 2- See specifications forfurther requirements related tothis detail. Existing soil. 73 $JUZPG"TQFOTSFF1SPUFDUJPO;POF Crown drip line or other limit of Tree Protection area. Seetree preservation plan for fence alignment.4'-0"Maintain existinggrade with the treeprotection fenceunless otherwiseindicated on theplans. 2" x 6' steel postsor approved equal. Tree Protectionfence: High densitypolyethylene fencingwith 3.5" x 1.5"openings; Color-orange. Steel postsinstalled at 8' o.c. 5" thicklayer of mulch. Notes:1- See specifications for additional treeprotection requirements. 2- If there is no existing irrigation, seespecifications for watering requirements. 3- No pruning shall be performed exceptby approved arborist. 4- No equipment shall operate inside theprotective fencing including during fenceinstallation and removal. 5- See site preparation plan for anymodifications with the Tree Protectionarea. SECTION VIEW KEEP OUTTREEPROTECTIONAREA 8.5" x 11"signlaminated inplastic spacedevery 50'along thefence. URBAN TREE FOUNDATION © 2014OPEN SOURCE FREE TO USE73= The requirements below are confirmed to comply. Wayne Stryker January 29, 2017 02/12/2018 Subject:NotAComment, please flatten Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:46:36 AM The following criteria must also be met with construction: ¾ A construction fence must be erected along the entire dripline of all trees on site and any tree canopy from neighboring property. This will serve as the tree protection zone (TPZ). This fence is to be constructed in such a manner that the area inside the dripline is protected. AN INSPECTION OF THIS FENCE MUST BE PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION WITH BEN CARLSEN AT 429-2034. ¾ No materials may be stored in the TPZ, including but not limited to, construction backfill, construction traffic, or any other construction materials. ¾ No excavation, grading or trenching may occur within the TPZ without the consent of the City of Aspen Forester or his designee. ¾ No parking of vehicles or equipment may occur in the TPZ. ¾ No dumping of any waste products may occur in the TPZ. ¾ Any roots cut during excavation shall be pruned with sharp loppers/pruners back to the soil line. The roots will further be protected by burlap draped over the side of the excavation covering the exposed roots. This burlap shall be kept moist until the excavation is backfilled. ¾ Pruning to provide clearance for construction activities shall only be done under the direction of an arborist. ¾ Site inspections shall be performed on a weekly basis, to ensure the above listed conditions are met. ¾ Any unapproved improvements or activities outside of those approved within this permit will be subject to mitigation in the form of restoration. ¾ This permit must be posted on site during the construction process. DATE Aspen Subdivisio Building A 1 1 9 S O U T H S A S P E N , C O L O (PH) 970.925.2100 The following criteria must also be met with construction:¾ A construction fence must be erected along the entire dripline ofall trees on site and any tree canopy from neighboring property.This will serve as the tree protection zone (TPZ). This fence is tobe constructed in such a manner that the area inside the dripline isprotected. AN INSPECTION OF THIS FENCE MUST BEPERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITIONACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION WITH BEN CARLSEN AT 429-2034.¾ No materials may be stored in the TPZ, including but not limitedto, construction backfill, construction traffic, or any otherconstruction materials.¾ No excavation, grading or trenching may occur within the TPZwithout the consent of the City of Aspen Forester or his designee.¾ No parking of vehicles or equipment may occur in the TPZ.¾ No dumping of any waste products may occur in the TPZ.¾ Any roots cut during excavation shall be pruned with sharploppers/pruners back to the soil line. The roots will further beprotected by burlap draped over the side of the excavation covering the exposed roots. This burlap shall be kept moist untilthe excavation is backfilled.¾ Pruning to provide clearance for construction activities shall onlybe done under the direction of an arborist.¾ Site inspections shall be performed on a weekly basis, to ensurethe above listed conditions are met.¾ Any unapproved improvements or activities outside of thoseapproved within this permit will be subject to mitigation in the formof restoration.¾ This permit must be posted on site during the constructionprocess. Confirmed Confirmed Confirmed Confirmed Confirmed Confirmed Confirmed Confirmed Confirmed Confirmed 02/12/2018 Subject:NotAComment, please flatten Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:46:28 AM Tree protection fencing is required at the driplines of all trees shown. There is NO activity allowed within this fenced area, including, but not limited to: digging, storage of material, equipment, machinery, foot or vehicle traffic. Please contact the City Forester or his designee at 920-5120 for an inspection of this fencing Prior to any activity. If the need arises to perform any activity in the tree protection area, please contact the City Forester and you will be given specific instructions as to how to proceed to minimize impacts to the tree root zone. Subject:PlanCheck Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:49:17 AM tree protection fencing required PlanCheck (3) Subject:PlanCheck Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:50:41 AM access route Subject:PlanCheck Page:PUD BUILDING PLAN Author:davidr Date:12/8/2017 9:49:29 AM tree protection fencing required. Tree protection fencing is required at the driplines of all trees shown. There is NO activity allowed within this fenced area, including, but not limited to: digging, storage of material, equipment, machinery, foot or vehicle traffic. Please contact the City Forester or his designee at 920-5120 for an inspection of this fencing Prior to any activity. If the need arises to perform any activity in the tree protection area, please contact the City Forester and you will be given specific instructions as to how to proceed to minimize impacts to the tree root zone. tree protection fencing required access route tree protection fencing required. Confirmed Confirmed Confirmed Confirmed 02/12/2018