Loading...
HomeMy WebLinkAboutFile Documents.805 Roaring Fork Rd.0235.2018 (11).ARBK0235-2018-ARBK_BuildingComments_1 Page: A0.0 PROPOSED SITE PLAN &RREMP File Name: Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf Subject: PlanCheck Author: nickt Color: The snowmelt totals do not match between the plans, the REMP worksheet, or the mechanical plans/schedule. Revise to all match. Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf (1) Page: 14 File Name: Structural Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf Subject: PlanCheck Author: nickt Color: Insulate the spa vault per 2015 IECC R402. This is required because of the heater Structural Plan Set Change Order.805 Roaring Fork Road.2018.09.pdf (1) ROA R I N G F O R K R O A D 7877 7878 7879 7879 NOTES:101'-2" = FIRST FLOOR ELEV. 7880.34'NO CHANGE TO GRADE RREMP CALCULATIONS ENTRY WALK/WALKWAY:673 SQ FTBATH STAIRS 67 SQ FTGARAGE DRIVE:689 SQ FTMUDROOM ENTRY/WALK: 98 SQ FT TOTAL:2350 SQ FT CUSTOM SPA TO BE CEC OR APSP-14CERTIFIED. SAFETY COVER TO BELISTED AS ASTM F 1346 NEWCONSTRUCTION SNOW MELT 5' ENTRYWALK PROPERTY LINE EASEMENT BUILDING SETBACK FENCE NEW TREE NEW TREE NEW TREE SNOWMELT DETAIL @ PERVIOUS PAVERSSNOWMELT DETAIL @ DRIVE (R-10) (R-10) (R-10) ESTIMATEDLOCATIONOF EXIST.WATERSERVICEABANDON A PER COAWATER SPEC PROPOSEDWATERSERVICELOCATION 1REV 04-02-18 2REV 09-18-18 2REV 09-18-18 The snowmelt totals donot match between theplans, the REMPworksheet, or themechanicalplans/schedule. Reviseto all match. RE: CIVILT/CURB 3"CLR4'-0" MAX2'-6"2" CLR (4)#5 HORIZ 2" CLR#5@12"OC #5@12"OC VERT #5@12"OC HORIZ #5 CONT WALL VERT DOWELS AT INSIDE FACE, RE: SCHEDULE OPTIONAL CONSTRUCTION JOINT CONTINUE VERT AND HORIZ REINFORCEMENT THRU CURB .CONTINUOUS FRENCHDRAIN AT WEEPS 2"K WEEP @10'-0"OC 12 2 MAX SLOPE FILTER FABRIC 3'-0" MIN FROM STRUCTURE "TW" 3" CLR IF CAST AGAINST EARTH2" CLR IF FORMED SURFACE CAST AGAINST UNDISTURBED SOIL (WHERE POSSIBLE) OR OTHERWISE PROPERLY COMPACTED SUBGRADE PER GEOTECHNICAL REPORT 2'-6"1'-6" #5 DOWEL @12"OC 7'-4"9'-4"TYP1'-0"12" DEEP CONC FTG, REINF W/ #5@12"OC, EW, BOT 2S6.0 WALL, TYP8" CONC 6" CONC SLAB, REINF W/ #4@12"OC, EW, CENTERED(1) ADDNL #4 EA EDGE OF OPENING (1)#4x3'-0" TRIM BAR CONC FTG CONC FDN WALL, REINF W/ #4@18"OC VERTAND #4@12"OC HORIZ CENTERED #4 DOWEL @18"OC CONC SLAB #4x 2'-0" @18"OC2'-0" 3" MAX STONE/MORTAR BUILD-UP T/FTG T/SLAB 5'-6" MAX SOG WHERE OCCURS, REINF RE: - #4x2'-6" @12"OC, DRILL AND EPOXY SLAB HORIZ REINF W/ HILTI HIT-HY 200 ADHESIVE, 4" EMBED 2'-6"4/S6.0 3'-0"VOID FORM 1'-4"1'-0" MIN1 2 2" CLR SOG, REINF W/ #4@12"OC, EW, CHAIRED TO MID-DEPTH SOG TURNDOWN, REINF W/ #4@12"OC, EW, OF #4x 24" @12"OC24"KLA, Inc.&Structura l E n g i n e e r s a n d B u i l d e r s 1717 Washington Avenue, Suite 100Golden, C o l o r a d o 8 0 4 0 1 P: (303) 3 8 4 9 9 1 0 F : ( 3 0 3 ) 3 8 4 9 9 1 5 Buffalo, WY ○ Carbondale, CO ○ Denver, CO ○ Golden, CO ○ Loveland, CO © 2017 KL&A, INC1133 BROADWAY SUITE 1416NEW YORK, NEW YORK 10010212.414.1272 McALPINEHOUSE.COMNEW Y O R K ATLA N T NASH V I L L E MON T G O M E R Y PROJE C T DATE TITL SHEET N o a renovation for ANN COOK 805 Roaring Fork RoadAspen, Colorado81611 CHARLEY MOSS& 11-2-17 PROGRESS SET8-30-17 PRELIM BID SET1-19-18 PERMIT SET7-9-18 CONSTRUCTION SET8-23-18 REVISION 29-17-18 CHANGE ORDER 1 S6.0 SPA AND SITEDETAILS NTS3SITE RETAINING WALL DETAIL 1/4" = 1'-0"1 SPA VAULT PLAN 1" = 1'-0"2 SPA VAULT SECTION 1" = 1'-0"4 TURNED DOWN SOG 3 09/17/2018 Insulate the spa vaultper 2015 IECC R402.This is requiredbecause of the heater snowmelt totals have been revised on all sheets to match spa vault has been insulated 02/11/2019